Campos Basin

FPSO Maria Quitéria starts operating in the pre-salt Campos Basin

The platform can produce up to 100,000 oil barrels per day in the Espírito Santo portion of the basin

Petrobras Agency
15/10/2024 18:35
FPSO Maria Quitéria starts operating in the pre-salt Campos Basin Imagem: Petrobras Agency Visualizações: 2040 (0) (0) (0) (0)

The Maria Quitéria platform ship produced its first oil on Tuesday (10/15) in the Jubarte field, pre-salt in the Espírito Santo portion of the Campos Basin. The unit can produce up to 100,000 barrels of oil a day and process up to 5 million cubic meters of gas. It will be interconnected to a total of eight producing wells and eight injectors.
 
FPSO Maria Quitéria's entry was brought forward; it was initially scheduled for 2025, according to the 2024-2028 Strategic Plan. Petrobras is the sole holder of the production rights for the Jubarte field, located in the area known as Parque das Baleias in Espírito Santo.
 
The platform is FPSO (floating production, storage, and transfer system). It is equipped with technologies to reduce emissions with greater operational efficiency and a reduction of around 24% in operational greenhouse gas emissions.

With a height of 156 meters and a length of 333 meters, the FPSO is installed at a water depth of 1,385 meters. It will also have the capacity to generate 100 MW of energy to supply a city of 230,000 inhabitants.
 
Parque das Baleias Integrated Project
 
The Parque das Baleias area is made up of the Jubarte, Baleia Anã, Cachalote, Caxaréu, Pirambú and Mangangá fields. The first field, Jubarte, was discovered in 2001. In 2019, Petrobras and the National Agency of Petroleum, Natural Gas and Biofuels (ANP) signed an agreement to extend the concession period until 2056 for the new unified Jubarte field, which enabled the implementation of FPSO Maria Quitéria, the latest production system for the Parque das Baleias Integrated Project, as well as complementary projects in the area.
 
Three other platforms operate in Parque das Baleias: P-57, P-58, and FPSO Cidade de Anchieta. When Maria Quitéria starts operating at full load, this unit will account for around 40% of the field's production.

Most Read Today
see see
Sustainability
Foresea earns Social Seal and reports significant result...
11/07/25
Results
Oil and Gas Sector Leads Dividend Distribution in 2024 w...
10/07/25
Natural Gas
Comgás Receives 41 Proposals in Public Call for Natural ...
10/07/25
People
Lucas Mota de Lima Appointed Executive Manager of ABPIP
10/07/25
Biomethane
Presidente Prudente (SP) Begins R$12 Million Biomethane ...
10/07/25
E&P
Hitachi Energy to evaluate electrification of offshore p...
10/07/25
Digitalization
TGS and Equinor Collaborate to Drive Digital Transformat...
10/07/25
People
Julia Cruz Appointed as New Secretary of Green Economy, ...
03/07/25
Sustainability
ABB among TIME’s World’s Most Sustainable Companies
03/07/25
Biofuels
Brazil Can Lead the Decarbonization of International Tra...
03/07/25
Pre-Salt
Oil States signs contracts to supply rigid jumpers for S...
03/07/25
Electric Energy
SMEs: Seven Tips for Joining the Free Energy Market
03/07/25
Energy Transition
CCEE Highlights Leadership in Energy Transition at EVEX ...
03/07/25
Award
WPC Energy Announces Vicki Hollub as Recipient of the Pr...
01/07/25
ANP
Final Results of the PRH-ANP 2025 Announced
01/07/25
Wind Energy
New Provisional Measure Will Not Be Enough to Counter Ha...
30/06/25
International
Oil discovery in the Johan Castberg area in the Barents Sea
30/06/25
Fuels
Gasoline Drops Just 0.78% in June Despite Petrobras' 5.6...
30/06/25
Event
Brazil Advances Energy Transition with E30 and B15, Rein...
30/06/25
People
Patricia Pradal Appointed as New President of Chevron So...
30/06/25
Results
ANP Releases Consolidated Data for the Regulated Sector ...
30/06/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.