Pre-Salt

Technip wins two contracts for ultra-deep water fields

Company will supply Sapinhoá Norte and Lula fields.

Technip
06/01/2014 11:38
Technip wins two contracts for ultra-deep water fields Imagem: Technip Visualizações: 1990 (0) (0) (0) (0)

 

Technip was awarded by Petrobras two ultra-deep water contracts for the supply of flexible pipes for the Sapinhoá Norte field and I5 at Lula field (former Tupi field), located in the Santos Basin pre-salt area (Brazil), at a water depth of up to 2,500 meters. The combination of both contracts covers the supply of approximately 100 kilometers of flexible pipes for oil production, gas lift, and gas injection. It also includes related equipment for the pre-salt area, to be installed on the floating production storage and offloading (FPSO) units, Cidade de Angra dos Reis and Cidade de Ilhabela.
The gas injection top risers are designed for high internal pressure, using the Teta profile(1) developed by Technip’s R&D team in its Flexi France plant in Le Trait (France). The gas injection top riser, together with the majority of the scope above, will be manufactured in Flexibras Açu(2), starting production in the first quarter of 2014 in line with previously announced plans. The remaining scope will be manufactured in Flexibras Vitória. Technip’s operating center in Rio de Janeiro (Brazil) will perform the engineering and project management.
Frédéric Delormel, Technip’s Executive Vice President and Chief Operating Officer Subsea, stated: “Developing a pre-salt field means bigger challenges and requires strong innovation. At Technip, we strive to ensure this technological excellence and continually improve high reliability, generating value for the energy industry. In addition to our know-how, we are uniquely positioned with vertically-integrated activities, from the manufacturing to the installation of flexible pipes. Keeping strong focus on quality, we look at the future and are preparing for tomorrow, today, as reflected in our intense R&D efforts or in our new plant in Açu.”

Technip was awarded by Petrobras two ultra-deep water contracts for the supply of flexible pipes for the Sapinhoá Norte field and I5 at Lula field (former Tupi field), located in the Santos Basin pre-salt area (Brazil), at a water depth of up to 2,500 meters. The combination of both contracts covers the supply of approximately 100 kilometers of flexible pipes for oil production, gas lift, and gas injection. It also includes related equipment for the pre-salt area, to be installed on the floating production storage and offloading (FPSO) units, Cidade de Angra dos Reis and Cidade de Ilhabela.


The gas injection top risers are designed for high internal pressure, using the Teta profile developed by Technip’s R&D team in its Flexi France plant in Le Trait (France). The gas injection top riser, together with the majority of the scope above, will be manufactured in Flexibras Açu, starting production in the first quarter of 2014 in line with previously announced plans. The remaining scope will be manufactured in Flexibras Vitória. Technip’s operating center in Rio de Janeiro (Brazil) will perform the engineering and project management.


Frédéric Delormel, Technip’s Executive Vice President and Chief Operating Officer Subsea, stated: “Developing a pre-salt field means bigger challenges and requires strong innovation. At Technip, we strive to ensure this technological excellence and continually improve high reliability, generating value for the energy industry. In addition to our know-how, we are uniquely positioned with vertically-integrated activities, from the manufacturing to the installation of flexible pipes. Keeping strong focus on quality, we look at the future and are preparing for tomorrow, today, as reflected in our intense R&D efforts or in our new plant in Açu.”

Most Read Today
see see
Petrobras
Petrobras produced 3.14 million barrels of oil equivalen...
27/10/25
FIRJAN
By 2035+, Rio de Janeiro State’s Energy Potential Could ...
23/10/25
Pre-Salt
PPSA to auction in December the first share of governmen...
23/10/25
Auction
Petrobras wins auction and leases RDJ07 terminal at the ...
23/10/25
Permanent Offer
Equinor acquires two new blocks in the Campos Basin duri...
23/10/25
OTC Brasil 2025
OTC Brasil 2025 Kicks Off in One Week with a Packed Prog...
22/10/25
Agreement
Wärtsilä Lifecycle agreement renewed to maintain safe, r...
22/10/25
Petrobras
Petrobras receives operating license for deepwater explo...
20/10/25
Equatorial Margin
License Grant for Drilling in the Equatorial Margin Is P...
20/10/25
Equatorial Margin
ABESPetro Statement on the Licensing of the Equatorial M...
20/10/25
Energy Transition
BNDES, Petrobras, and Finep select Valetec to manage the...
20/10/25
Pre-Salt
Petrobras and PPSA sign equalization agreement for Jubar...
20/10/25
WPC Energy Youth Forum
Kuwait to Host 8th WPC Energy Youth Forum in October 2025
20/10/25
Exports
Petrobras signs contract to sell six million barrels of ...
20/10/25
Petrobras
Petrobras puts the Harpia supercomputer into operation
10/10/25
PPSA
PPSA Publishes Notice for the Non-Contracted Areas Auction
10/10/25
ROG.e
IBP Launches the New ROG.e: The World’s Largest Energy F...
10/10/25
Pre-Salt
CNPE Sets Minimum Value of BRL 10.2 Billion for the Unio...
08/10/25
Natural Gas
Petrobras Carries Out First Natural Gas Import from Arge...
08/10/25
Agreement
Seagems renews Wärtsilä Lifecycle Agreement to support t...
07/10/25
Pre-Salt
Petrobras begins contracting for the construction of FPS...
03/10/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.