Wind Power

ACCIONA Windpower signs a new supply contract in brazil for 153 MW

Its 3 MW turbines will be used in the Santa Vitória do Palmar wind power complex owned by the company Atlantic Energias Renováveis.

Acciona
23/06/2014 15:36
ACCIONA Windpower signs a new supply contract in brazil for 153 MW Imagem: Acciona Visualizações: 1167 (0) (0) (0) (0)

Its 3 MW turbines will be used in the Santa Vitória do Palmar wind power complex owned by the company Atlantic Energias Renováveis.

AWP will also operate and maintain the turbines for 15 years.

ACCIONA Windpower (AWP), a subsidiary of the ACCIONA group that designs, manufactures and commercializes wind turbines, has signed a turbine supply contract in Brazil with the renewable energy generation holding company Atlantic Energias Renováveis for a total of 153 MW.

The contract includes the supply and assembly of fifty-one AW 125/3000 turbines, of 3 MW capacity each and 125 meters rotor diameter, for the Santa Vitória do Palmar wind power complex in the state of Río Grande do Sul. The turbines - the biggest designed by ACCIONA Windpower - will be mounted on 120-meter-high concrete towers.

The company has also signed a contract for the operation and maintenance of the turbines for a period of 15 years.

ACCIONA Windpower already has six supply contracts in Brazil for a total of 666 MW, making the country the company's biggest market in terms of 3 MW wind turbines.

A very competitive wind turbine

"The contracts with Atlantic strengthen our position in Brazil and confirm the special adaptability of our large AW3000 turbines to the characteristics of the wind power potential of the country", says ACCIONA Windpower Brasil Director Christiano Forman. "We have a very competitive machine, with options that make it ideal for a large number of sites".

ACCIONA Windpower complies with the requirements for local operation in Brazil defined in the FINAME regulation. It has an operational hub manufacture plant, which will be complemented with a nacelle factory in the fourth trimester of 2014. Both are located in the state of Bahia, and the supply of main turbine components such as blades is covered from local suppliers, as well as other smaller components.

 

Most Read Today
see see
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 Opens with Stronger Integr...
09/09/25
Rio Pipeline & Logistics 2025
At Transpetro, Social Responsibility Initiatives Support...
09/09/25
Rio Pipeline & Logistics 2025
DNV participates in Rio Pipeline & Logistics 2025
09/09/25
Rio Pipeline & Logistics 2025
Construtora Elevação Brings Innovation, Efficiency, and ...
09/09/25
ANP
A\Sense wins ANP technology challenge with advanced opti...
09/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 kicks off today, September 9
09/09/25
Minas Gerais
With R$ 314 million investment, pioneering macaúba biofu...
03/09/25
Recognition
Supergasbras earns Gold Seal in the Brazilian GHG Protoc...
03/09/25
FIRJAN
Brazilian industry records four consecutive months witho...
03/09/25
Copel
EPE President presents future outlook for the power sector
03/09/25
FIRJAN
Together with CNI, Firjan launches business mission in t...
03/09/25
Gulf of America
C-Innovation completes successful decommissioning projec...
28/08/25
Equatorial Margin
Rig chartered by Petrobras arrives in Amapá to take part...
19/08/25
FIRJAN
Rio gains Firjan SENAI Metalworking Reference Center
19/08/25
RD&I
CEPETRO develops for Petrobras a tool that integrates mu...
19/08/25
Pre-Salt
Búzios Field surpasses the record level of 900 thousand ...
19/08/25
Logistics
PetroReconcavo and Dislub build an unprecedented oil out...
19/08/25
IBP
NAVE Program advances with 21 energy sector startups
19/08/25
International Event
The 3rd Annual World ReAM Show Returns to Dubai, Bridgin...
13/08/25
Sustainability
ATPI Expands Global Sustainability Portfolio with Brazil...
06/08/25
Results
ANP releases consolidated 2024 data in English for the r...
29/07/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2