Permanent Offer

ANP Board approves inclusion of 174 new areas in Permanent Offer

Petrobras Agency
30/11/2019 05:53
ANP Board approves inclusion of 174 new areas in Permanent Offer Imagem: Divulgation Visualizações: 2084 (0) (0) (0) (0)

The ANP Board of Directors approved last Thursday (11/28) the inclusion of 173 blocks and a marginally accumulated area (Juruá, in the Solimões Basin) in the Permanent Offer, a bidding model in which there is a continuous offer of a portfolio of areas for exploration and production of oil and natural gas. Of the 173 new blocks, 149 were already under study and recently had a manifestation regarding the environmental viability and the other 24 are offered blocks and not sold in the 16th Bidding Round, held on October 10th.

 

The new version of the Permanent Offer Notice will be submitted for public consultation starting yesterday (29/11) and subsequent public hearing, scheduled for 02/05/2020. The current version, published in May 2019, includes 600 blocks with exploratory risk and 14 areas with marginal accumulations. However, in September this year, there was the public offering session of the 1st Cycle of the Permanent Offer, in which 33 blocks and 12 areas with marginal accumulations were auctioned. Thus, the new announcement will offer 740 blocks (567 remnants of the previous announcement and 173 new) and three areas with marginal accumulations (two remaining and the new Juruá area, returned to the ANP by Petrobras as determined by Board Resolution 243/2018 , of 05/09/2018).

 

In addition to the technical and economic parameters for the blocks and area included, the draft notice that will be submitted for consultation also updates the parameters of the blocks and the areas that were already in the previous version, especially in relation to the methodology for defining the tax rates. royalties. For areas located in new frontier and mature basins, the reduction was suggested considering the geological risk and the expected production of the sectors and, for areas with marginal accumulations, the minimum royalty rate equivalent to 5% was proposed. For areas outside the Campos and Santos Basin pre-salt polygon and those classified as high potential basins, it is proposed to maintain the royalty rate at 10%.

 

The new version of the Permanent Offer Notice will be subject to public consultation from 11/29/2019, and subsequent public hearing, scheduled for 2/5/2020. The current version, published in May 2019, includes 600 blocks with exploratory risk and 14 areas with marginal accumulations. However, in September this year, there was the public offering session of the 1st Cycle of the Permanent Offer, in which 33 blocks and 12 areas with marginal accumulations were auctioned. Thus, the new announcement will offer 740 blocks (567 remnants of the previous announcement and 173 new) and three areas with marginal accumulations (two remaining and the new Juruá area, returned to the ANP by Petrobras as determined by Board Resolution 243/2018 , of 05/09/2018).

 

The draft also includes some technical improvements resulting from the experience with the 1st Cycle of the Permanent Offer and other rounds of bids held this year, as well as contributions from Agency technicians, as well as changes to the wording to make the rules clearer and more objective.

 

The Permanent Offer consists of the continuous offer of returned fields (or in the process of return) and exploratory blocks offered in previous bids and not sold or returned to ANP. Thus, companies, especially those not yet in Brazil, have the opportunity to study these areas without the time limitations that traditional rounds provide. More information is available at http://rodadas.anp.gov.br/pt/oferta-permanente

Most Read Today
see see
Agreement
Wärtsilä Lifecycle agreement renewed to maintain safe, r...
22/10/25
Petrobras
Petrobras receives operating license for deepwater explo...
20/10/25
Equatorial Margin
License Grant for Drilling in the Equatorial Margin Is P...
20/10/25
Equatorial Margin
ABESPetro Statement on the Licensing of the Equatorial M...
20/10/25
Energy Transition
BNDES, Petrobras, and Finep select Valetec to manage the...
20/10/25
Pre-Salt
Petrobras and PPSA sign equalization agreement for Jubar...
20/10/25
WPC Energy Youth Forum
Kuwait to Host 8th WPC Energy Youth Forum in October 2025
20/10/25
Exports
Petrobras signs contract to sell six million barrels of ...
20/10/25
Petrobras
Petrobras puts the Harpia supercomputer into operation
10/10/25
PPSA
PPSA Publishes Notice for the Non-Contracted Areas Auction
10/10/25
ROG.e
IBP Launches the New ROG.e: The World’s Largest Energy F...
10/10/25
Pre-Salt
CNPE Sets Minimum Value of BRL 10.2 Billion for the Unio...
08/10/25
Natural Gas
Petrobras Carries Out First Natural Gas Import from Arge...
08/10/25
Agreement
Seagems renews Wärtsilä Lifecycle Agreement to support t...
07/10/25
Pre-Salt
Petrobras begins contracting for the construction of FPS...
03/10/25
International Company News
Alkhorayef Petroleum Company acquires GRC Technologies, ...
01/10/25
Pre-Salt
FPSO P-78 arrives at the Búzios Field
01/10/25
RD&I
Brazil Has the Capacity to Develop Its Own Technology fo...
01/10/25
Equatorial Margin
Ibama Approves Pre-Operational Assessment (APO) Conducte...
26/09/25
Sustainable Aviation
Embraer Advances SAF Studies Following Acquisition of Bi...
26/09/25
International Company News
ExxonMobil Guyana Expands Capacity With Seventh Offshore...
24/09/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.