Oil Discovery

Beach Energy Reports Oil Find at Stunsail-1 Well

Preliminary volumetric estimates of the field are currently being assessed.

Beach Energy
31/03/2014 14:08
Visualizações: 324 (0) (0) (0) (0)

 

Beach Energy reported Friday that the Stunsail-1 exploration well in PEL 91 (Beach 40 percent and operator, Drillsearch Energy Ltd. 60 percent) in Australia's Cooper Basin successfully discovered oil in stacked pay over the McKinlay/Top Namur, Mid-Namur and Birkhead reservoirs.
The Stunsail-1 well exceeded expectations by encountering a thicker column and multiple hydrocarbon bearing zones. The well intersected the McKinlay/Namur at a depth of 4,484 feet (1,367 meters) with a 32.8 foot (10 meter) column, 19.6 feet (6 meters) of which was within the highly productive Namur Sandstone. A 13.1 foot (4 meter) oil column was also penetrated in the mid-Namur at a depth of 4.603 feet (1,403 meters).
Additional oil shows were encountered in the deeper Birkhead Formation, with two intervals tested. The first drill stem test (DST) tested a gross 49.2 foot (15 meter) section, at a top depth of 5,469 feet (1,667 meters), and recovered 46 barrels of oil and 3 barrels of filtrate over a 4 hour period, equating to a test rate of in excess of 250 barrels of oil per day. The second DST is testing a gross 37.7 foot (11.5 meter) section, with a top depth of 5,282 feet (1,610 meters). Results from this test are still pending.
Preliminary volumetric estimates of the field are currently being assessed.
Reg Nelson, Beach managing director, said “The new field discovery at Stunsail continues the extraordinary success Beach has had drilling on 3D in this part of the basin. This is our most northerly discovery in PEL 91 to date, which bodes well for future exploration in this part of the permit. Our goal is to continue to grow production from the Western Flank, with a number of further exploration wells to be drilled in our operated and non-operated areas this financial year.”
Following the completion of the evaluation program, the Ensign 930 rig will be moved to the Hardwicke-1 exploration well, which is located approximately 5 miles (8 kilometers) to the northeast of Stunsail-1.

Beach Energy reported Friday that the Stunsail-1 exploration well in PEL 91 (Beach 40 percent and operator, Drillsearch Energy Ltd. 60 percent) in Australia's Cooper Basin successfully discovered oil in stacked pay over the McKinlay/Top Namur, Mid-Namur and Birkhead reservoirs.


The Stunsail-1 well exceeded expectations by encountering a thicker column and multiple hydrocarbon bearing zones. The well intersected the McKinlay/Namur at a depth of 4,484 feet (1,367 meters) with a 32.8 foot (10 meter) column, 19.6 feet (6 meters) of which was within the highly productive Namur Sandstone. A 13.1 foot (4 meter) oil column was also penetrated in the mid-Namur at a depth of 4.603 feet (1,403 meters).


Additional oil shows were encountered in the deeper Birkhead Formation, with two intervals tested. The first drill stem test (DST) tested a gross 49.2 foot (15 meter) section, at a top depth of 5,469 feet (1,667 meters), and recovered 46 barrels of oil and 3 barrels of filtrate over a 4 hour period, equating to a test rate of in excess of 250 barrels of oil per day. The second DST is testing a gross 37.7 foot (11.5 meter) section, with a top depth of 5,282 feet (1,610 meters). Results from this test are still pending.


Preliminary volumetric estimates of the field are currently being assessed.


Reg Nelson, Beach managing director, said “The new field discovery at Stunsail continues the extraordinary success Beach has had drilling on 3D in this part of the basin. This is our most northerly discovery in PEL 91 to date, which bodes well for future exploration in this part of the permit. Our goal is to continue to grow production from the Western Flank, with a number of further exploration wells to be drilled in our operated and non-operated areas this financial year.”


Following the completion of the evaluation program, the Ensign 930 rig will be moved to the Hardwicke-1 exploration well, which is located approximately 5 miles (8 kilometers) to the northeast of Stunsail-1.

 

Most Read Today
see see
International Company News
OES Group Returns to Private Ownership Following Managem...
01/09/26
Products and Services
RiverTough Bearings and Seals
27/08/26
Pre-Salt
Petrobras platforms P-80 and P-82, which will operate in...
27/08/26
Royalties
Values related to June production were distributed to st...
27/08/26
People
bp appoints Felipe Arbelaez head of country for Brazil
27/08/26
ROG.e 2026
ROG.e 2026 brings global leaders together to discuss the...
26/08/26
Pre-Salt
Búzios field sets monthly and daily natural gas export r...
26/08/26
Navalshore
Firjan SENAI presents the Supplier Opportunities Network...
17/08/26
Equatorial Margin
Morpho Well: Petrobras discovers hydrocarbons in ultra-d...
15/08/26
Power Generation
Campo Grande hosts four days of debates on bioenergy and...
12/08/26
International
KPMG: fossil fuel consumption falls, despite oil's signi...
12/08/26
Fenasucro
Fenasucro & Agrocana opening highlights Brazil's leaders...
12/08/26
Event
IBP and BIP bring together leaders to discuss technology...
11/08/26
Event
Asset Management gains prominence in corporate strategy;...
11/08/26
Macaé
Foresea takes part in WSOP 2026 and reinforces that safe...
11/08/26
Sergipe-Alagoas Basin
Siemens Energy advances offshore expansion in Brazil wit...
10/08/26
Campos Basin
Raia Project Reaches New Milestones in One of Brazil’s M...
06/08/26
Permanent Offer
ANP Takes Part in Ceremony Marking the Signing of Contra...
05/08/26
SOG 2026
ABPIP Strengthens Territorial Development Agenda in Serg...
04/08/26
SOG 2026
SOG26 Surpasses the Previous Edition and Reinforces Serg...
03/08/26
People
Shell Brasil Begins a New Leadership Cycle with João San...
03/08/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2