Caspian Sea

BP starts oil production from West Chirag in Caspian Sea

The entire platform was fabricated in Azerbaijan.

BP
29/01/2014 19:25
Visualizações: 230 (0) (0) (0) (0)

 

BP says oil production has started from the new West Chirag platform in the Azeri sector of the Caspian Sea. The platform was commissioned for the $6-billion Chirag oil project in 2010 as part of the Azeri-Chirag-Gunashli (ACG) field development.
More than $4 billion was allocated to construction of facilities and the pre-drill program, and the remainder will be spent on platform development well drilling. The investment should help optimize recovery from the ACG field, BP adds. The entire platform was fabricated in Azerbaijan using local resources.
The West Chirag facility has been installed in around 170 m (558 ft) of water between the existing Chirag and Deepwater Gunashli platforms. Its oil-handling capacity is 183,000 b/d and its gas export capacity is 285 MMcf/d (8 MMcm/d).
Oil produced from the J05 well will be processed onboard and then exported to the Sangachal Terminal via a new infield pipeline linked to an existing 30-in. subsea export pipeline. Production will ramp up as the other pre-drilled wells are brought online.
Gordon Birrell, BP’s regional president for Azerbaijan, Georgia and Turkey, said: “West Chirag is the eighth world-class offshore platform that we have built and operated in a safe and efficient manner in the Caspian. To date the ACG field has produced over 2.3 Bbbl of oil and with future continual major investments in new technologies and facilities...it will continue to produce…for many decades.”
Partners in the ACG development are BP (operator – 35.8%), SOCAR (11.6%), Chevron (11.3%), INPEX (11%), Statoil (8.6%), ExxonMobil (8%), TPAO (6.8%), ITOCHU (4.3%), and ONGC Videsh (2.7%).

BP says oil production has started from the new West Chirag platform in the Azeri sector of the Caspian Sea. The platform was commissioned for the $6-billion Chirag oil project in 2010 as part of the Azeri-Chirag-Gunashli (ACG) field development.


More than $4 billion was allocated to construction of facilities and the pre-drill program, and the remainder will be spent on platform development well drilling. The investment should help optimize recovery from the ACG field, BP adds. The entire platform was fabricated in Azerbaijan using local resources.


The West Chirag facility has been installed in around 170 m (558 ft) of water between the existing Chirag and Deepwater Gunashli platforms. Its oil-handling capacity is 183,000 b/d and its gas export capacity is 285 MMcf/d (8 MMcm/d).


Oil produced from the J05 well will be processed onboard and then exported to the Sangachal Terminal via a new infield pipeline linked to an existing 30-in. subsea export pipeline. Production will ramp up as the other pre-drilled wells are brought online.


Gordon Birrell, BP’s regional president for Azerbaijan, Georgia and Turkey, said: “West Chirag is the eighth world-class offshore platform that we have built and operated in a safe and efficient manner in the Caspian. To date the ACG field has produced over 2.3 Bbbl of oil and with future continual major investments in new technologies and facilities...it will continue to produce…for many decades.”


Partners in the ACG development are BP (operator – 35.8%), SOCAR (11.6%), Chevron (11.3%), INPEX (11%), Statoil (8.6%), ExxonMobil (8%), TPAO (6.8%), ITOCHU (4.3%), and ONGC Videsh (2.7%).

 

Most Read Today
see see
ROG.e 2026
Petrobras president advocates active exploration and exp...
25/09/26
ROG.e 2026
Nikki Martin, president and CEO of EnerGeo Alliance, spo...
25/09/26
ROG.e 2026
Oil States Highlights Integration Between Engineering, M...
25/09/26
ROG.e 2026
Port of Açu and OceanPact sign agreement for expansion o...
25/09/26
ROG.e 2026
Lumina’s Role and the Impact of ROG.e 2026 on the Energy...
25/09/26
ROG.e 2026
Leaders Identify Brazil as a Pillar of Energy Security a...
24/09/26
ROG.e 2026
Firjan SENAI and Sebrae Rio Connect Small Businesses wit...
24/09/26
ROG.e 2026
PPSA Study Identifies Best Practices to Support Investme...
24/09/26
ROG.e 2026
ROG.e 2026 Reinforces the DE&I Agenda in the Energy Sect...
24/09/26
ROG.e 2026
IBP Launches Publication on Energy Companies’ Socio-envi...
23/09/26
ROG.e 2026
Industry Giants and Independent Producers Accelerate Pro...
22/09/26
ROG.e 2026
Firjan Attends ROG.e 2026 Opening Ceremony and Signs Tec...
22/09/26
ROG.e 2026
ROG.e 2026 Opening Ceremony Highlights Just Energy Trans...
21/09/26
ROG.e 2026
Global Leaders Position Brazil as a Hub of Stability, At...
21/09/26
ROG.e 2026
Exclusive Interview: Pelagus targets Brazil to strengthe...
21/09/26
ROG.e 2026
At ROG.e, Firjan SENAI Holds the 30th Edition of the Sup...
21/09/26
ROG.e 2026
ROG.e 2026 kicks off next Monday (21) with global energy...
19/09/26
ROG.e 2026
Camorim invests R$ 250 million in 2026 to expand fleet a...
18/09/26
ROG.e 2026
Firjan SENAI SESI Presents New Technologies at ROG.e Dev...
18/09/26
ADIPEC 2026
ADIPEC 2026 to mobilise investment in resilient, intelli...
18/09/26
Acquisition
CoreMarine takes a decisive step to expand its offshore ...
17/09/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2