Pre-Salt

Consortium approves working and investment plan for Libra in 2014

Capital for these activities is US$ 400 million.

Petrobras
24/01/2014 11:24
Consortium approves working and investment plan for Libra in 2014 Imagem: TB Petroleum Visualizações: 2240 (0) (0) (0) (0)

 

Petrobras announces that the consortium formed by Petrobras (40%), Shell (20%), Total (20%), CNOOC (10%) and CNPC (10%), along with Pré-Sal Petróleo S.A. (PPSA), has approved, on the Operational Committee meeting held on January 21st, the working and investment plan for Libra in 2014.  
The main activities included in the working plan are: seismic reprocessing in the whole area of the block; drilling of two wells starting on the 2nd half of 2014 with estimated conclusion on the 1st half of 2015; and studies for a new seismic acquisition using high-end technologies and for an extended well test forecasted for the end of 2016. The approved capital expenditure for these activities in 2014 is within a range of US$ 400 million and US$ 500 million.
The production share contract of Libra states that the exploration phase of the block will have duration of four years from the contract signature date, which happened on December 2nd, 2013. The minimum exploratory program, to be carried out during this period, includes 3D seismic acquisition for the whole block, two exploratory wells and one extended well test.
The Libra block is located in ultra deep waters of Santos Basin pre-salt and is considered a prospect of high potential. The total extension of the area is 1,547.76 km2 and was discovered by well 2-ANP-0002ARJS, drilled in 2010.

Petrobras announces that the consortium formed by Petrobras (40%), Shell (20%), Total (20%), CNOOC (10%) and CNPC (10%), along with Pré-Sal Petróleo S.A. (PPSA), has approved, on the Operational Committee meeting held on January 21st, the working and investment plan for Libra in 2014.  


The main activities included in the working plan are: seismic reprocessing in the whole area of the block; drilling of two wells starting on the 2nd half of 2014 with estimated conclusion on the 1st half of 2015; and studies for a new seismic acquisition using high-end technologies and for an extended well test forecasted for the end of 2016. The approved capital expenditure for these activities in 2014 is within a range of US$ 400 million and US$ 500 million.


The production share contract of Libra states that the exploration phase of the block will have duration of four years from the contract signature date, which happened on December 2nd, 2013. The minimum exploratory program, to be carried out during this period, includes 3D seismic acquisition for the whole block, two exploratory wells and one extended well test.


The Libra block is located in ultra deep waters of Santos Basin pre-salt and is considered a prospect of high potential. The total extension of the area is 1,547.76 km2 and was discovered by well 2-ANP-0002ARJS, drilled in 2010.

Most Read Today
see see
Memorandum of Understanding
Wärtsilä and Abu Dhabi Maritime Academy explore collabor...
12/02/26
Pre-Salt
Petrobras platform P-79 arrives at the Búzios field
12/02/26
Results
Petrobras’ oil and gas production rises 11% and reaches ...
12/02/26
Permanent Offer
Comprehensive and Unprecedented Joint Statement Speeds U...
12/02/26
PPSA
MME and MMA Clear Strategic Pre-Salt Areas, Enabling the...
12/02/26
Biomethane
Biomethane in Focus with Debate on Credit, Regulation, a...
12/02/26
People
Mario Ferreira is the New Commercial Manager at Wiz Corp...
11/02/26
Visas Agreement
Brazil implements electronic VISIT Visa for Chinese citizens
22/01/26
Biofuels
Sifaeg Highlights New Investment Cycle and the Consolida...
21/01/26
Drilling
Foresea’s Norbe IX Drillship Undergoes Scheduled Mainten...
21/01/26
State of Ceará
Companies from Ceará lead the H2MOVER-Pecém project, sel...
08/01/26
Maritime Support
Ambipar carries out more than 600 port and maritime emer...
07/01/26
Petrobras
Petrobras celebrates 20 years of the Santos Basin Unit
07/01/26
Pelotas Basin
TGS launches maritime safety application for operations ...
07/01/26
Diesel
Petrobras and Vale move forward with fuel supply partnership
07/01/26
ANP
In November, Brazil produced 4.921 million boe/d
07/01/26
Offshore Operations
Crew training and connectivity are the true enablers of ...
23/12/25
Recognition
IBP Wins the “Events Oscar” Once Again with ROG.e 2024
11/12/25
FIRJAN
Rio Could Generate 676,000 New Jobs by Stimulating Nine ...
11/12/25
Inland Navigation
Grease-Free Revolution in Latin America’s Workboat Sector
10/12/25
PPSA
Production-Sharing Contracts to Produce 2 Million Barrel...
10/12/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.