Enviroment

Duke Energy Begins Construction on 22.6-megawatt Cabarrus County, N.C., Solar Project

T&B Petroleum/3BL CSRwire
09/06/2021 19:36
Visualizações: 839 (0) (0) (0) (0)

Expanding its rapidly growing clean-energy portfolio, Duke Energy has begun construction on the 22.6-MW Speedway Solar power plant in Cabarrus County.

 

The project will be owned and operated by Duke Energy Sustainable Solutions, a new commercial brand that includes Duke Energy Renewables. The project was selected as part of the competitive bidding process established by 2017’s landmark solar legislation in North Carolina.

 

The power plant will contain about 77,000 Jinko bifacial modules with single-axis tracking. The plant will be located on 185 acres in Midland, N.C. – near the corner of Wallace Road and Bethel Avenue Extension. The facility will power the equivalent of 5,000 homes. It is targeting commercial operation by the end of 2021.

 

“Duke Energy is making an aggressive push to expand renewable energy, reduce carbon emissions and achieve a net-zero carbon goal for 2050,” said Stephen De May, Duke Energy’s North Carolina president. “An expansion of solar power will be a key element of that effort.”

 

Under North Carolina’s Competitive Procurement for Renewable Energy, proposed projects must be built where there is a need for energy capacity on the Duke Energy system in North Carolina or South Carolina. The bids can come from any company, including Duke Energy, and can be in the form of power purchase agreements (PPA), utility self-developed facilities or utility asset acquisitions.

 

“We’re pleased to be able to add more clean energy resources to the state. This facility will not only address the increasing clean energy needs of our communities but will also deliver significant economic benefits to Cabarrus County,” said Chris Fallon, president of Duke Energy Sustainable Solutions.

 

During peak construction, Speedway Solar will employ about 70 workers. Along with indirect economic benefits that accompany solar project development, such as increased local spending in the service and construction industries, Speedway Solar will also have a positive economic impact on the local community by providing local tax revenues to the county and local school districts, as well as meaningful payments to the participating landowners.

 

Duke Energy Sustainable Solutions also supports the communities where its facilities and team members are based through the efforts of the Duke Energy Foundation, which awarded a $5,000 grant to the Cabarrus County Education Foundation to increase internet connectivity for students in Midland and Mt. Pleasant, N.C.

 

The facility’s design, procurement of inverters, balance of plant systems and construction of the project will be performed by Swinerton. The solar power generated by Speedway Solar will be delivered through a 20-year power purchase agreement.

 

A leader in renewable energy 

Duke Energy maintains more than 3,700 MW of solar power on its energy grid in North Carolina, which could power about 700,000 homes and businesses at peak output. The company also operates more than 40 solar facilities in the state. North Carolina currently ranks No. 3 in the nation for overall solar power. With nuclear, hydro and renewable energy, more than half of North Carolina’s energy mix is carbon-free.

 

As one of the nation’s top renewable energy providers, Duke Energy’s plans to double its enterprise wide renewable portfolio from 8 gigawatts (GW) of capacity to 16 GW by the end of 2025.

 

Duke Energy Sustainable Solutions 

Duke Energy Sustainable Solutions is a nonregulated commercial brand of Duke Energy (NYSE: DUK) – a Fortune 150 company and one of the largest energy holding companies in the U.S. – headquartered in Charlotte, N.C.

 

Duke Energy Sustainable Solutions is a leader in sustainable energy, helping large enterprises reduce power costs, lower emissions and increase resiliency. The team provides wind, solar, resilient backup power and managed energy services to over 1,000 projects across the U.S., with a total electric capacity of more than 5,100 megawatts of nonregulated renewable energy. Visit Duke Energy Sustainable Solutions and follow on LinkedIn and YouTube for more information.

 

Duke Energy is executing an aggressive clean energy strategy to create a smarter energy future for its customers and communities – with goals of at least a 50 percent carbon reduction by 2030 and net-zero carbon emissions by 2050. The company is a top U.S. renewable energy provider, on track to operate or purchase 16,000 megawatts of renewable energy capacity by 2025. More information about the company is available at duke-energy.com. 

Most Read Today
see see
FIRJAN
Despite Tariff Hikes, Oil Drives Rio's Trade Flow Up 9% ...
27/02/26
Royalties
December Production Royalty Payments Distributed to Stat...
26/02/26
Award
BRAVA Energia Wins Top Honor at OTC Houston for Atlanta ...
26/02/26
Strategic Agenda
ABPIP Presents 2026 Strategic Agenda to Chairman of the ...
26/02/26
People
TVO Enhances Project Management Expertise
26/02/26
Memorandum of Understanding
Wärtsilä and Abu Dhabi Maritime Academy explore collabor...
12/02/26
Pre-Salt
Petrobras platform P-79 arrives at the Búzios field
12/02/26
Results
Petrobras’ oil and gas production rises 11% and reaches ...
12/02/26
Permanent Offer
Comprehensive and Unprecedented Joint Statement Speeds U...
12/02/26
PPSA
MME and MMA Clear Strategic Pre-Salt Areas, Enabling the...
12/02/26
Biomethane
Biomethane in Focus with Debate on Credit, Regulation, a...
12/02/26
People
Mario Ferreira is the New Commercial Manager at Wiz Corp...
11/02/26
Visas Agreement
Brazil implements electronic VISIT Visa for Chinese citizens
22/01/26
Biofuels
Sifaeg Highlights New Investment Cycle and the Consolida...
21/01/26
Drilling
Foresea’s Norbe IX Drillship Undergoes Scheduled Mainten...
21/01/26
State of Ceará
Companies from Ceará lead the H2MOVER-Pecém project, sel...
08/01/26
Maritime Support
Ambipar carries out more than 600 port and maritime emer...
07/01/26
Petrobras
Petrobras celebrates 20 years of the Santos Basin Unit
07/01/26
Pelotas Basin
TGS launches maritime safety application for operations ...
07/01/26
Diesel
Petrobras and Vale move forward with fuel supply partnership
07/01/26
ANP
In November, Brazil produced 4.921 million boe/d
07/01/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.