MEO Australia Limited disclosed that at 06:00 Darwin time Friday Dec. 6, the jackup Ensco 104 (400' ILC)  was preparing to commence the wireline logging program having drilled the Blackwood-2 well in Permit NT/P68 offshore Australia's Northern Territory to total depth at 11,236 feet (3,425 meters) measured depth below rotary table (MDRT).
Operational progress since the previous report is summarized in the table below.
PROGRESS SUMMARY
Progress since last report:
Drilled 8.5 inch (216 millimeters) hole from 10,334 feet (3,150 meters) MDRT to 10,538 feet (3,226 meters) MDRT
Cut core from 10,538 feet (3,226 meters) to 10,771 feet (3,283 meters) MDRT (recovered 196 feet or 60 meters)
Drilled 8.5 inch (216 millimeters) hole from 10,771 feet (3,283 meters) MDRT to 11,236 feet (3,425 meters) MDRT (Total Depth)
Prepared to commence wireline logging program
Present Operation (at 06:00 Darwin time, Dec. 6):
Preparing to conduct wireline logging program
Outlook:
Production test (if warranted)
Plug and abandon well
BACKGROUND
The Blackwood-2 appraisal well is located approximately 4.9 miles (8 kilometers) from the Blackwood-1 discovery well. Further information regarding the NT/P68 Exploration Permit is available on the MEO website.
The drilling of Blackwood-2 is an obligation under the NT/P68 Farm-in Agreement (FIA) dated May 17, 2011 between Eni Australia Limited (Eni) and MEO. Under the FIA and subsequent amendment, MEO’s 50 percent participating interest share of the costs of the well will be carried.

MEO Australia Limited disclosed that at 06:00 Darwin time Friday Dec. 6, the jackup Ensco 104 (400' ILC)  was preparing to commence the wireline logging program having drilled the Blackwood-2 well in Permit NT/P68 offshore Australia's Northern Territory to total depth at 11,236 feet (3,425 meters) measured depth below rotary table (MDRT).

 

Operational progress since the previous report is summarized in the table below.

 

Progress Sumary

 

Progress since last report:

 

Drilled 8.5 inch (216 millimeters) hole from 10,334 feet (3,150 meters) MDRT to 10,538 feet (3,226 meters) MDRTCut core from 10,538 feet (3,226 meters) to 10,771 feet (3,283 meters) MDRT (recovered 196 feet or 60 meters)Drilled 8.5 inch (216 millimeters) hole from 10,771 feet (3,283 meters) MDRT to 11,236 feet (3,425 meters) MDRT (Total Depth)Prepared to commence wireline logging program Present.

 

Operation (at 06:00 Darwin time, Dec. 6):

 

Preparing to conduct wireline logging program

 

Outlook:

 

Production test (if warranted)Plug and abandon wellBACKGROUNDThe Blackwood-2 appraisal well is located approximately 4.9 miles (8 kilometers) from the Blackwood-1 discovery well. Further information regarding the NT/P68 Exploration Permit is available on the MEO website.

 

The drilling of Blackwood-2 is an obligation under the NT/P68 Farm-in Agreement (FIA) dated May 17, 2011 between Eni Australia Limited (Eni) and MEO. Under the FIA and subsequent amendment, MEO’s 50 percent participating interest share of the costs of the well will be carried.

Most Read Today
see see
International
PortXL presents its 2026 cohort of 11 maritime startups ...
30/09/26
ADIPEC
ADIPEC 2026 set to welcome record Asian participation as...
29/09/26
ANP
Royalties: amounts referring to July production were dis...
29/09/26
25th WPC
Riyadh Takes Center Stage as Global Energy Heavyweights ...
28/09/26
ROG.e 2026
Petrobras president advocates active exploration and exp...
25/09/26
ROG.e 2026
Nikki Martin, president and CEO of EnerGeo Alliance, spo...
25/09/26
ROG.e 2026
Oil States Highlights Integration Between Engineering, M...
25/09/26
ROG.e 2026
Port of Açu and OceanPact sign agreement for expansion o...
25/09/26
ROG.e 2026
Lumina’s Role and the Impact of ROG.e 2026 on the Energy...
25/09/26
ROG.e 2026
Leaders Identify Brazil as a Pillar of Energy Security a...
24/09/26
ROG.e 2026
Firjan SENAI and Sebrae Rio Connect Small Businesses wit...
24/09/26
ROG.e 2026
PPSA Study Identifies Best Practices to Support Investme...
24/09/26
ROG.e 2026
ROG.e 2026 Reinforces the DE&I Agenda in the Energy Sect...
24/09/26
ROG.e 2026
IBP Launches Publication on Energy Companies’ Socio-envi...
23/09/26
ROG.e 2026
Industry Giants and Independent Producers Accelerate Pro...
22/09/26
ROG.e 2026
Firjan Attends ROG.e 2026 Opening Ceremony and Signs Tec...
22/09/26
ROG.e 2026
ROG.e 2026 Opening Ceremony Highlights Just Energy Trans...
21/09/26
ROG.e 2026
Global Leaders Position Brazil as a Hub of Stability, At...
21/09/26
ROG.e 2026
Exclusive Interview: Pelagus targets Brazil to strengthe...
21/09/26
ROG.e 2026
At ROG.e, Firjan SENAI Holds the 30th Edition of the Sup...
21/09/26
ROG.e 2026
ROG.e 2026 kicks off next Monday (21) with global energy...
19/09/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2