Technology

GE Announces Global Wind Turbine Repair Innovation Lab

It marks GE´s presence in the Capital region.

GE
26/02/2014 20:11
Visualizações: 1981 (0) (0) (0) (0)

 

GE today announced the opening of its Global Wind Turbine Drivetrain Repair Innovation Lab at the site of GE's Power Generation Repair Technology Center in Albany, N.Y. The center marks an investment in GE's presence in the Capital Region and expansion of the local renewable energy team's facilities. 
The facility is equipped with advanced technologies to support fast development and innovation for repairs to the wind turbine's gearbox and rotor, creating a lab environment to simulate and solve problems that previously had to be worked on more than 100 meters in the air and at remote sites. 
Technical capabilities of the Innovation Lab include:
Rapid prototyping tools such as 3D printers and computer numerical control machines.
Robotic welding and advanced machining tools.
Repair of various gearbox models.
Turbine generator repair.
Andy Holt, general manager of global wind projects and services, said: "This is the first facility of its kind dedicated to developing repair technologies and capabilities that reduce the life cycle cost of wind turbines. Albany was an ideal location for the facility with its close proximity to GE's renewable energy headquarters, the GE Energy Learning Center as well as the existing Repair Technologies Center. It is uniquely positioned for collaboration with the field, design engineering, training and product service teams."
The Innovation Lab aligns GE with customer needs by helping reduce maintenance and operating costs. GE engineers will have the space and resources to rapidly prototype and develop new technologies to apply to field service repairs. The team will focus on innovative approaches while fully vetting tooling and processes, keeping in mind safety, cost and the ability to address multi-unit configurations. With proximity to GE's renewable energy headquarters in Schenectady, the team at the Innovation Lab also will work closely with product engineering to improve serviceability.

GE today announced the opening of its Global Wind Turbine Drivetrain Repair Innovation Lab at the site of GE's Power Generation Repair Technology Center in Albany, N.Y. The center marks an investment in GE's presence in the Capital Region and expansion of the local renewable energy team's facilities. 

The facility is equipped with advanced technologies to support fast development and innovation for repairs to the wind turbine's gearbox and rotor, creating a lab environment to simulate and solve problems that previously had to be worked on more than 100 meters in the air and at remote sites. 

Technical capabilities of the Innovation Lab include:

Rapid prototyping tools such as 3D printers and computer numerical control machines.

Robotic welding and advanced machining tools.

Repair of various gearbox models.

Turbine generator repair.

Andy Holt, general manager of global wind projects and services, said: "This is the first facility of its kind dedicated to developing repair technologies and capabilities that reduce the life cycle cost of wind turbines. Albany was an ideal location for the facility with its close proximity to GE's renewable energy headquarters, the GE Energy Learning Center as well as the existing Repair Technologies Center. It is uniquely positioned for collaboration with the field, design engineering, training and product service teams."

The Innovation Lab aligns GE with customer needs by helping reduce maintenance and operating costs. GE engineers will have the space and resources to rapidly prototype and develop new technologies to apply to field service repairs. The team will focus on innovative approaches while fully vetting tooling and processes, keeping in mind safety, cost and the ability to address multi-unit configurations. With proximity to GE's renewable energy headquarters in Schenectady, the team at the Innovation Lab also will work closely with product engineering to improve serviceability.

 

Most Read
see see
PPSA
PPSA Publishes Notice for the Non-Contracted Areas Auction
10/10/25
ROG.e
IBP Launches the New ROG.e: The World’s Largest Energy F...
10/10/25
Pre-Salt
CNPE Sets Minimum Value of BRL 10.2 Billion for the Unio...
08/10/25
Natural Gas
Petrobras Carries Out First Natural Gas Import from Arge...
08/10/25
Agreement
Seagems renews Wärtsilä Lifecycle Agreement to support t...
07/10/25
Pre-Salt
Petrobras begins contracting for the construction of FPS...
03/10/25
International Company News
Alkhorayef Petroleum Company acquires GRC Technologies, ...
01/10/25
Pre-Salt
FPSO P-78 arrives at the Búzios Field
01/10/25
RD&I
Brazil Has the Capacity to Develop Its Own Technology fo...
01/10/25
Equatorial Margin
Ibama Approves Pre-Operational Assessment (APO) Conducte...
26/09/25
Sustainable Aviation
Embraer Advances SAF Studies Following Acquisition of Bi...
26/09/25
International Company News
ExxonMobil Guyana Expands Capacity With Seventh Offshore...
24/09/25
International Company News
More LNG for Europe
24/09/25
International Company News
Viking Completes Milestone Delivery to African Energy Pr...
24/09/25
Company News
CHC Helicopter Opens Hangar at Farol de São Tomé Helipor...
22/09/25
International Company News
“Sercel supplies sensors and trucks for major North Afri...
22/09/25
Geological Studies
R&D Clause Enables Project to Strengthen Critical Minera...
15/09/25
Fuels
ANP Approves Pilot Project with New Fuel Inspection Equi...
15/09/25
RD&I
Sensor Developed by Unicamp and UnB Advances in Internat...
15/09/25
Event
ABPIP Hosts SMS Oil & Gas Meeting Focused on Leadership,...
15/09/25
International
Petrobras announces participation in exploratory block i...
15/09/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.