Thailand

Hallin Marine Completes Subsea Project

The project was managed from Hallin’s SOV Windermere.

Hallin Marine
28/02/2014 13:15
Visualizações: 249 (0) (0) (0) (0)

 

Hallin Marine, a Superior Energy Services company, disclosed Thursday that it has completed an urgent project at Bualuang oil field in B8/38 concession off the coast of Thailand following damage to subsea structures. The work centred on the inspection and repair of the mooring and riser system at a floating production, storage and offloading (FPSO) facility. The project was managed from Hallin’s SOV Windermere.
An initial third-party ROV (remotely operated vehicle) inspection in partnership with Rubicon Offshore International was commissioned by the client to determine the nature and extent of any damage, Hallin was then tasked to provide saturation diving services for further inspection and to stabilize the installation before conducting repairs. The work entailed the unraveling of flexible risers, control umbilical and mooring wire, the removal and subsequent replacement of the oil production riser assembly and other subsea structures, resulting in a safe and efficient return to production. The project commenced Jan. 6 and production resumed Feb. 13.
“I want to express our gratitude towards everyone involved in this project,” states Andre Vogel, operations director at Rubicon. “It was an excellent achievement in a six week time frame and would not have been possible if we did not have the level of commitment from the entire team during this time.”
“Hallin is particularly proud of the outcome of this challenging project,” says Phil Chamberlain, Hallin‘s director – Service Delivery. “The team worked closely with the client to assess the situation before planning and executing the work safely and effectively. All parties are very pleased with the outcome."

Hallin Marine, a Superior Energy Services company, disclosed Thursday that it has completed an urgent project at Bualuang oil field in B8/38 concession off the coast of Thailand following damage to subsea structures. The work centred on the inspection and repair of the mooring and riser system at a floating production, storage and offloading (FPSO) facility. The project was managed from Hallin’s SOV Windermere.


An initial third-party ROV (remotely operated vehicle) inspection in partnership with Rubicon Offshore International was commissioned by the client to determine the nature and extent of any damage, Hallin was then tasked to provide saturation diving services for further inspection and to stabilize the installation before conducting repairs. The work entailed the unraveling of flexible risers, control umbilical and mooring wire, the removal and subsequent replacement of the oil production riser assembly and other subsea structures, resulting in a safe and efficient return to production. The project commenced Jan. 6 and production resumed Feb. 13.


“I want to express our gratitude towards everyone involved in this project,” states Andre Vogel, operations director at Rubicon. “It was an excellent achievement in a six week time frame and would not have been possible if we did not have the level of commitment from the entire team during this time.”


“Hallin is particularly proud of the outcome of this challenging project,” says Phil Chamberlain, Hallin‘s director – Service Delivery. “The team worked closely with the client to assess the situation before planning and executing the work safely and effectively. All parties are very pleased with the outcome."

 

Most Read Today
see see
International
PortXL presents its 2026 cohort of 11 maritime startups ...
30/09/26
ADIPEC
ADIPEC 2026 set to welcome record Asian participation as...
29/09/26
ANP
Royalties: amounts referring to July production were dis...
29/09/26
25th WPC
Riyadh Takes Center Stage as Global Energy Heavyweights ...
28/09/26
ROG.e 2026
Petrobras president advocates active exploration and exp...
25/09/26
ROG.e 2026
Nikki Martin, president and CEO of EnerGeo Alliance, spo...
25/09/26
ROG.e 2026
Oil States Highlights Integration Between Engineering, M...
25/09/26
ROG.e 2026
Port of Açu and OceanPact sign agreement for expansion o...
25/09/26
ROG.e 2026
Lumina’s Role and the Impact of ROG.e 2026 on the Energy...
25/09/26
ROG.e 2026
Leaders Identify Brazil as a Pillar of Energy Security a...
24/09/26
ROG.e 2026
Firjan SENAI and Sebrae Rio Connect Small Businesses wit...
24/09/26
ROG.e 2026
PPSA Study Identifies Best Practices to Support Investme...
24/09/26
ROG.e 2026
ROG.e 2026 Reinforces the DE&I Agenda in the Energy Sect...
24/09/26
ROG.e 2026
IBP Launches Publication on Energy Companies’ Socio-envi...
23/09/26
ROG.e 2026
Industry Giants and Independent Producers Accelerate Pro...
22/09/26
ROG.e 2026
Firjan Attends ROG.e 2026 Opening Ceremony and Signs Tec...
22/09/26
ROG.e 2026
ROG.e 2026 Opening Ceremony Highlights Just Energy Trans...
21/09/26
ROG.e 2026
Global Leaders Position Brazil as a Hub of Stability, At...
21/09/26
ROG.e 2026
Exclusive Interview: Pelagus targets Brazil to strengthe...
21/09/26
ROG.e 2026
At ROG.e, Firjan SENAI Holds the 30th Edition of the Sup...
21/09/26
ROG.e 2026
ROG.e 2026 kicks off next Monday (21) with global energy...
19/09/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2