Tupi Field

Hiring of a commercial agent has a pre-public notice placed in public consultation by PPSA

T&B Petroleum/Press Office
18/12/2020 20:41
Visualizações: 849 (0) (0) (0) (0)

Today (18), Pré-Sal Petróleo (PPSA) starts a public consultation, for 30 days, on the international bidding notice (LI. PPSA.001 / 2020) for the hiring of a commercial agent for the production of Union oil in the Tupi Individualized Area.

 

Located in the Santos Basin, Tupi is the main oil and natural gas producing field in the pre-salt reservoirs, being operated by Petrobras (65%), with partners Shell (25%) and Petrogal (10%). As production progressed to a non-contracted area, in April 2019, a Production Individualization Agreement (AIP) was signed, which granted the Union a 0.551% stake in the shared deposit. According to initial estimates, such participation will be equivalent to approximately 3.5 million barrels of oil in five years, with an estimated value of US $ 140.5 million.

 

This is a pioneering bid in Brazil, for which PPSA developed a new business model with the objective of hiring a trading agent, an alternative provided for by law. For this contract, the Tupi commercial agent will be responsible, for a period of five years, for the entire commercialization process, including the identification of the buyer, the loading in the FPSO (floating production, storage and transfer unit), the transport to the transhipment or cabotage delivery point, the eventual long-haul transportation and the contracting of insurance, independent inspection and oil price protection operation (hedge).

 

The bidding provides for individual participation or in a consortium, which may be composed of foreign companies, but led by a national oil producer and exporter and already active in the pre-salt. The consortium is limited to three participants. The other members can be a trading company from the same economic group as the leading company and a logistics company.

 

The production of Campo de Tupi is carried out through seven FPSOs. To date, the Union's share is approximately 2,800 barrels of oil per day. Under the contract, the agent must schedule minimum loads of 500 thousand barrels in each of the seven FPSOs. The initial estimate is that the first charges will be formed in 2023 and the last in 2026.

 

After the end of the public consultation, PPSA will analyze the comments received and publish the final notice.

 

The Bidding will be governed by the Public Notice and by Law No. 13,303, of 7/1/2016.

 

The pre-public notice will be available for consultation at the electronic address: click here!

Most Read
see see
International
5th Congress of the Federation of Portuguese-Speaking La...
05/11/26
FIRJAN
Public-private partnership seen as vital to petrochemica...
05/11/26
Drilling
Norbe VIII, operated by Foresea, is ready to operate in ...
05/11/26
Refineries
TEM Boaventura Consortium completes lift of first reacto...
04/11/26
FIRJAN
Greater natural gas availability strengthens Rio de Jane...
03/11/26
Result
Oil and natural gas production hits a new record in Sept...
03/11/26
Pre-Salt
P-78 Platform (Búzios 6) reaches peak production of 180,...
03/11/26
Auction
Neoenergia wins Lots 1 and 7 in ANEEL Transmission Auction
30/10/26
WPC Energy
WPC Energy welcomes the Republic of Chad into membership
28/10/26
International
PortXL presents its 2026 cohort of 11 maritime startups ...
30/09/26
ADIPEC
ADIPEC 2026 set to welcome record Asian participation as...
29/09/26
ANP
Royalties: amounts referring to July production were dis...
29/09/26
25th WPC
Riyadh Takes Center Stage as Global Energy Heavyweights ...
28/09/26
ROG.e 2026
Petrobras president advocates active exploration and exp...
25/09/26
ROG.e 2026
Nikki Martin, president and CEO of EnerGeo Alliance, spo...
25/09/26
ROG.e 2026
Oil States Highlights Integration Between Engineering, M...
25/09/26
ROG.e 2026
Port of Açu and OceanPact sign agreement for expansion o...
25/09/26
ROG.e 2026
Lumina’s Role and the Impact of ROG.e 2026 on the Energy...
25/09/26
ROG.e 2026
Leaders Identify Brazil as a Pillar of Energy Security a...
24/09/26
ROG.e 2026
Firjan SENAI and Sebrae Rio Connect Small Businesses wit...
24/09/26
ROG.e 2026
PPSA Study Identifies Best Practices to Support Investme...
24/09/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.