Permanent Offer

Inclusion of 15 New Blocks in Permanent Offer (OPP) Bid Round Discussed in Public Hearing

With the addition, the bid round will now feature 23 available blocks, the highest number ever offered in the OPP.

T&B Petroleum/Press Office ANP
14/03/2026 18:00
Inclusion of 15 New Blocks in Permanent Offer (OPP) Bid Round Discussed in Public Hearing Imagem: Disclosure Visualizações: 64 (0) (0) (0) (0)

A public hearing was held on Friday, March 13, to discuss updates to the Permanent Production Sharing Offer (OPP) bid round, including the addition of 15 new exploratory blocks.The current bid round includes eight blocks (Jade, Ágata, Amazonita, Safira Leste, Safira Oeste, Larimar, Turmalina, and Ônix). With the inclusion of the new blocks (Cruzeiro do Sul, Rubi, Granada, Aragonita, Calcedônia, Cerussita, Malaquita, Opala, Quartzo, Rodocrosita, Siderita, Hematita, Magnetita, Calcita, and Azurita), the total will increase to 23 blocks on offer—the largest number ever made available under the OPP.

The draft bid round submitted for public hearing had already been approved by the Ministry of Mines and Energy (MME), and all included blocks have valid joint declarations from the Ministry of the Environment and Climate Change (MMA) and the MME.

Since the update involves only the inclusion of new blocks and adjustments to technical-economic parameters—without changes to the rules already established in the current bid round—the public consultation stage was waived to expedite the republication process. This allows for a new OPP cycle to be held, with a public session still in 2026. To initiate a new cycle, the Special Bidding Committee (CEL) must receive and approve a declaration of interest, accompanied by a bid guarantee, from one or more companies registered in the OPP.

In addition to the 15 blocks included in this update, three other blocks authorized by the National Energy Policy Council (CNPE)—Mogno, Dolomita, and Limonita—will be incorporated in a future revision of the bid round. The Mogno block, although it already has a valid joint declaration, is partially located beyond Brazil’s 200-nautical-mile territorial limit, requiring adjustments to the bid round rules to include specific provisions applicable to such areas.

Meanwhile, the Limonita and Dolomita blocks require boundary adjustments due to recommendations in Joint Declaration MMA/MME No. 01/2026, as well as an assessment of the impacts of these changes on the technical-economic feasibility of the areas. These procedures demand a broader bid round revision process, making it unfeasible to hold a new cycle in 2026.

Therefore, to ensure at least one annual cycle per contracting regime, the ANP opted for the immediate inclusion of the 15 eligible blocks, with the remaining blocks to be incorporated in future revisions.

Learn more about Public Hearing No. 2/2026.

What is the Permanent Offer?

The Permanent Offer is currently the main bidding model for oil and natural gas exploration and production in Brazil. Unlike traditional bid rounds, this model allows for the continuous offering of exploratory blocks and marginal accumulation areas, located in onshore or offshore basins.

This gives companies the flexibility to study technical data for the areas and submit bids when they deem most appropriate, without rigid deadlines or specific bidding cycles. This flexibility has made the Permanent Offer an essential tool for fostering competitiveness and attractiveness in Brazil’s energy sector.

Currently, there are two types of Permanent Offers:

To date, the ANP has conducted:

  • Five Permanent Offer cycles under the concession regime (2019, 2020, 2022, 2023, and 2025)
  • Three Permanent Offer cycles under the production-sharing regime (2022, 2023, and 2025)
Most Read Today
see see
PPSA
Petrobras announces results of PPSA’s Non-Contracted Are...
08/12/25
Niterói
Niterói concludes second edition of Tomorrow Blue Econom...
02/12/25
Recognition
ABS Consulting Earns Third Elev8 GovCon Honor for Excell...
22/11/25
Award
Aed Energy Wins at the 2025 Energy Storage Awards
22/11/25
Mossoró Oil & Gas Energy 2025
PetroSupply Meeting to Boost Business at Mossoró Oil & G...
21/11/25
Results
Union’s Oil Production Reached 174 Thousand Barrels per ...
21/11/25
International Company News
TGS Extends Agreement with the Government of the Federal...
21/11/25
Company News
Belga Marine and Global Maritime Announce Strategic Part...
21/11/25
Niterói
Tomorrow Blue Economy sets Niterói in motion in the coun...
13/11/25
Cop30
ANP Participates in the Event and Advances Measures for ...
13/11/25
FIRJAN
Enaex 2025 Discusses Reindustrialization, Brazil’s Compe...
13/11/25
Mossoró Oil & Gas Energy 2025
Mossoró Oil & Gas Energy to Feature Strategic Debates in...
13/11/25
Company News
Norsul becomes the first company in Latin America to ado...
11/11/25
ADIPEC 2025
From energy to intelligence to impact: ADIPEC 2025 sets ...
07/11/25
ADIPEC 2025
ADIPEC 2025 Day 3: Energy, finance and technology leader...
07/11/25
Results
Petrobras reaches net income of R$ 32.7 billion in the t...
07/11/25
Cop30
IBP Advocates Global Criteria for a Just Energy Transition
07/11/25
Offshore
Decommissioning Takes Center Stage
07/11/25
Natural Gas
ANP Approves Action Plan on Gas Pipeline Transportation ...
07/11/25
ADIPEC 2025
AI is no longer a side project: Technology leaders at AD...
05/11/25
Environment
ANP Holds Workshop on Methane Emissions in Partnership w...
05/11/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.