Pre-Salt

Installed in the Mero field, FPSO Guanabara reaches a maximum capacity of 180,000 bpd

T&B Petroleum/Petrobras Agency
16/01/2023 16:00
Installed in the Mero field, FPSO Guanabara reaches a maximum capacity of 180,000 bpd Imagem: Modec Visualizações: 11377 (0) (0) (0) (0)

Petrobras informs that the Guanabara platform vessel, installed in the Mero field, in the Santos Basin pre-salt, reached its maximum production capacity, with the mark of 180 thousand barrels of oil per day (bpd), about eight months after the unit started operating. Of the FPSO (floating production, storage, and oil transfer system) type, Guanabara achieved this result with four producing wells and three gas injectors. It is the first platform in a series of four definitive units scheduled for Mero, each capable of producing up to 180 thousand bpd of oil.

This performance is the result of the high productivity per well, the acceleration of the learning curve, and the use of state-of-the-art technologies in the field - such as the so-called loop configuration for the water and gas injection wells and the separation of carbon dioxide (CO2) by membranes. "The result shows a ramp-up of production at a consistent pace, indicating the field's high productivity and a sound development strategy, within the strictest operational safety standards," said Petrobras' Chief Exploration and Production Officer, Fernando Borges.

Reduction of CO2 emissions

The FPSO Guanabara incorporates one of the most robust Carbon Capture, Use and Geological Storage programs, the so-called CCUS, since the Mero field has a 45% content of this gas, enabling the reduction of CO2 emissions.

Furthermore, consortium is developing, for application in the field, the unprecedented subsea separation technology called HISEP® (High Pressure Separation). With it, it will be possible to separate, still on the seabed, the CO2-rich gas produced for reinjection into the reservoir.

The Mero field holds not only the FPSO Guanabara, but also the FPSO Pioneiro de Libra, which operates the Early Production System (SPA 2), currently producing 50 thousand bpd. SPA 2 is dedicated to the evaluation of the field's production behavior. With the two units in operation, the Mero field currently produces about 230 thousand bpd.   

Mero: Third largest field in the country

In the second half of this year, consortium plans to install the second definitive platform in Mero: the FPSO Sepetiba, also capable of producing up to 180 thousand bpd. By 2025, the company will put another two units into operation in the field, totaling five systems that, together, will correspond to 770 thousand bpd of the installed capacity in the country.  

Mero is Brazil's third largest field by volume of oil in place, behind only Tupi and Búzios, also located in the Santos Basin pre-salt.

The operation of the unitized Mero field are conducted by the Consortium operated by Petrobras (38.6%), in partnership with Shell Brasil Petróleo Ltda (19.3%), TotalEnergies EP Brasil Ltda (19.3%), CNODC Brasil Petróleo e Gás Ltda (9.65%), CNOOC Petroleum Brasil Ltda (9.65%) and Pré-Sal Petróleo S.A (PPSA) (3.5%), as the Brazilian Government's representative in the non-contracted area.

Most Read Today
see see
Memorandum of Understanding
Wärtsilä and Abu Dhabi Maritime Academy explore collabor...
12/02/26
Pre-Salt
Petrobras platform P-79 arrives at the Búzios field
12/02/26
Results
Petrobras’ oil and gas production rises 11% and reaches ...
12/02/26
Permanent Offer
Comprehensive and Unprecedented Joint Statement Speeds U...
12/02/26
PPSA
MME and MMA Clear Strategic Pre-Salt Areas, Enabling the...
12/02/26
Biomethane
Biomethane in Focus with Debate on Credit, Regulation, a...
12/02/26
People
Mario Ferreira is the New Commercial Manager at Wiz Corp...
11/02/26
Visas Agreement
Brazil implements electronic VISIT Visa for Chinese citizens
22/01/26
Biofuels
Sifaeg Highlights New Investment Cycle and the Consolida...
21/01/26
Drilling
Foresea’s Norbe IX Drillship Undergoes Scheduled Mainten...
21/01/26
State of Ceará
Companies from Ceará lead the H2MOVER-Pecém project, sel...
08/01/26
Maritime Support
Ambipar carries out more than 600 port and maritime emer...
07/01/26
Petrobras
Petrobras celebrates 20 years of the Santos Basin Unit
07/01/26
Pelotas Basin
TGS launches maritime safety application for operations ...
07/01/26
Diesel
Petrobras and Vale move forward with fuel supply partnership
07/01/26
ANP
In November, Brazil produced 4.921 million boe/d
07/01/26
Offshore Operations
Crew training and connectivity are the true enablers of ...
23/12/25
Recognition
IBP Wins the “Events Oscar” Once Again with ROG.e 2024
11/12/25
FIRJAN
Rio Could Generate 676,000 New Jobs by Stimulating Nine ...
11/12/25
Inland Navigation
Grease-Free Revolution in Latin America’s Workboat Sector
10/12/25
PPSA
Production-Sharing Contracts to Produce 2 Million Barrel...
10/12/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.