International Companies

Kongsberg Bags $53M Contracts from Chinese, South Korean Shipbuilders

Norway's Kongsberg Maritime bagged contracts, valued at $53.3 million (NOK 330 million), to provide its "Full Picture" solution to Chinese and South Korean shipbuilders for 13 advanced newbuild offshore vessels.

Rigzone
23/07/2014 18:23
Visualizações: 1104 (0) (0) (0) (0)

Norway's Kongsberg Maritime bagged contracts, valued at $53.3 million (NOK 330 million), to provide its "Full Picture" solution to Chinese and South Korean shipbuilders for 13 advanced newbuild offshore vessels.

 

Chinese shipyards that awarded the contracts to Kongsberg included Dalian Shipbuilding Industry Offshore Co. (DSIC), CIMC Raffles (CIMC), Cosco Shipyard (COSCO) and Hudong Zhonghua Shipyard (HDZ), while Samsung Heavy Industries (SHI) and Hyundai Heavy Industries (HHI) were the South Korean shipbuilders that have selected the Norwegian firm's "Full Picture" technology.

 

Under the contract, Kongsberg Maritime will provide sophisticated integrated Dynamic Positioning (DP), Automation, Navigation and Hydroacoustic positioning, while riser management solutions will be supplied by sister company Kongsberg Oil & Gas Technologies. The delivery is for four advanced offshore drilling units, two advanced accommodation units, six liquefied natural gas (LNG) vessels and one LNG floating storage regasification unit (FSRU) with Integrated Automation System.

 

One of the contracts with DSIC is for an advanced semisubmersible drilling rig of Agility Group A5000 design which is being built for China Oilfield Services Limited (COSL).

 

"These new contracts for 2014 build on an excellent 2013 performance in China and Korea, where Kongsberg was chosen for numerous advanced vessel newbuildings by major yards and owners. We truly appreciate the confidence shown by both the shipyards and the vessel owners when selecting Kongsberg as a partner for key technology on these prestigious projects," Morten Stanger, regional manager Offshore Asia, Kongsberg Maritime said in the press release.

 

Most Read
see see
International
5th Congress of the Federation of Portuguese-Speaking La...
05/11/26
FIRJAN
Public-private partnership seen as vital to petrochemica...
05/11/26
Drilling
Norbe VIII, operated by Foresea, is ready to operate in ...
05/11/26
Refineries
TEM Boaventura Consortium completes lift of first reacto...
04/11/26
FIRJAN
Greater natural gas availability strengthens Rio de Jane...
03/11/26
Result
Oil and natural gas production hits a new record in Sept...
03/11/26
Pre-Salt
P-78 Platform (Búzios 6) reaches peak production of 180,...
03/11/26
Auction
Neoenergia wins Lots 1 and 7 in ANEEL Transmission Auction
30/10/26
WPC Energy
WPC Energy welcomes the Republic of Chad into membership
28/10/26
International
PortXL presents its 2026 cohort of 11 maritime startups ...
30/09/26
ADIPEC
ADIPEC 2026 set to welcome record Asian participation as...
29/09/26
ANP
Royalties: amounts referring to July production were dis...
29/09/26
25th WPC
Riyadh Takes Center Stage as Global Energy Heavyweights ...
28/09/26
ROG.e 2026
Petrobras president advocates active exploration and exp...
25/09/26
ROG.e 2026
Nikki Martin, president and CEO of EnerGeo Alliance, spo...
25/09/26
ROG.e 2026
Oil States Highlights Integration Between Engineering, M...
25/09/26
ROG.e 2026
Port of Açu and OceanPact sign agreement for expansion o...
25/09/26
ROG.e 2026
Lumina’s Role and the Impact of ROG.e 2026 on the Energy...
25/09/26
ROG.e 2026
Leaders Identify Brazil as a Pillar of Energy Security a...
24/09/26
ROG.e 2026
Firjan SENAI and Sebrae Rio Connect Small Businesses wit...
24/09/26
ROG.e 2026
PPSA Study Identifies Best Practices to Support Investme...
24/09/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.