Norwegian North Sea

Maersk takes delivery of ultra-harsh environment jackup drilling rig

Its a four-year contract with Total E&P Norge.

Maersk
11/04/2014 15:05
Visualizações: 228 (0) (0) (0) (0)

 

Maersk Drilling has taken delivery of its first ultra-harsh environment jackup, Maersk Intrepid, from Keppel FELS in Singapore.
The rig will head for the Norwegian North Sea on a four-year contract with Total E&P Norge.
The Maersk Intrepid will be drilling the demanding and complex wells on the Martin Linge field development in the Norwegian North Sea. The contract includes four one-year options. The estimated contract value for the firm contract is USD 550 million.
With a leg length of 206.8 m (678 ft) the rigs are the world’s largest jack-up rigs and are designed for year round operation in the North Sea, in water depths up to 150 m (492 ft). The rig features dual pipe handling so that while one string is in the well, a second string can be assembled/disassembled and stored in the set-back area for subsequent use.
Maersk Intrepid is the first in a series of four newbuild ultra harsh environment jackups to enter Maersk Drilling’s rig fleet in 2014-16. The four jackups represent a total investment of $2.6billion. The first three will be delivered from the Keppel FELS yard in 2014-2015, and the fourth will be delivered from the Daewoo Shipbuilding and Marine Engineering in South Korea in 2016.

Maersk Drilling has taken delivery of its first ultra-harsh environment jackup, Maersk Intrepid, from Keppel FELS in Singapore. The rig will head for the Norwegian North Sea on a four-year contract with Total E&P Norge.


The Maersk Intrepid will be drilling the demanding and complex wells on the Martin Linge field development in the Norwegian North Sea. The contract includes four one-year options. The estimated contract value for the firm contract is USD 550 million.With a leg length of 206.8 m (678 ft) the rigs are the world’s largest jack-up rigs and are designed for year round operation in the North Sea, in water depths up to 150 m (492 ft). The rig features dual pipe handling so that while one string is in the well, a second string can be assembled/disassembled and stored in the set-back area for subsequent use.


Maersk Intrepid is the first in a series of four newbuild ultra harsh environment jackups to enter Maersk Drilling’s rig fleet in 2014-16. The four jackups represent a total investment of $2.6billion. The first three will be delivered from the Keppel FELS yard in 2014-2015, and the fourth will be delivered from the Daewoo Shipbuilding and Marine Engineering in South Korea in 2016.

 

Most Read Today
see see
Macaé
Foresea takes part in WSOP 2026 and reinforces that safe...
11/08/26
Sergipe-Alagoas Basin
Siemens Energy advances offshore expansion in Brazil wit...
10/08/26
Campos Basin
Raia Project Reaches New Milestones in One of Brazil’s M...
06/08/26
Permanent Offer
ANP Takes Part in Ceremony Marking the Signing of Contra...
05/08/26
SOG 2026
ABPIP Strengthens Territorial Development Agenda in Serg...
04/08/26
SOG 2026
SOG26 Surpasses the Previous Edition and Reinforces Serg...
03/08/26
People
Shell Brasil Begins a New Leadership Cycle with João San...
03/08/26
Results
ANP Releases Consolidated Data on Oil and Gas Production...
03/08/26
SOG 2026
Banco do Nordeste Has R$ 504 Million for the Energy Sect...
03/08/26
PPSA
TotalEnergies and ExxonMobil Win Atapu and Bacalhau Cargoes
31/07/26
SOG 2026
Sebrae Sergipe Strengthens Small Businesses and Expands ...
31/07/26
PPSA
PPSA Expects to Hold the First Auction of the Union’s Na...
30/07/26
SOG 2026
Sergipe Oil & Gas 2026 Begins with a Focus on Investment...
30/07/26
SOG 2026
Petrobras Director Opens Sergipe Oil & Gas with Analysis...
30/07/26
FIRJAN
Agrega + Indústria brings together entities, companies, ...
29/07/26
SOG 2026
ABPIP brings to Sergipe Oil & Gas a debate on strengthen...
28/07/26
Event
BR Aviation presents its portfolio of customized solutio...
23/07/26
Royalties
Royalties: amounts referring to May production distribut...
23/07/26
Fuels
Fuel and lubricants sector registers 1.8% drop in June, ...
22/07/26
IBP
Studies point to redundancy of the export tax and extra ...
22/07/26
PPSA
7th Spot Auction: PPSA markets cargoes from Atapu and Ba...
20/07/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2