ANP

Manual of Procedures for the Assignment of Contracts is updated and published by ANP

T&B Petroleum/Press Office ANP
27/04/2021 20:59
Manual of Procedures for the Assignment of Contracts is updated and published by ANP Imagem: Petrobras Agency Visualizações: 4125 (0) (0) (0) (0)

The ANP published yesterday (26/4) the update of the Manual of Procedures for Assignment. The new version aims to make the document more didactic and consolidate all information related to this process. The manual is available, click here!

 

The update of the manual includes improvements made from conversations with the market and contributions obtained during the Contract Assignment Workshop, held by the ANP recently (7/4). The virtual event brought together representatives of oil and natural gas exploration and production (E&P) companies with technicians from the Agency, who provided information and guidance on contract assignment processes.

 

Watch the recording of the workshop, click here!

 

See the presentations made during the workshop, click here!

 

What is the assignment of E&P contracts 

Assignment is the transfer, in whole or in part, of the ownership of rights and obligations arising from the E&P contract. It is permitted by Laws 9,478 / 1997 and 12,351 / 2010, provided that: the object and the contractual conditions are preserved; the assignee meets the technical, economic and legal requirements established by the ANP; and there is prior and express authorization from the Agency, in the case of concession contracts, or from the Union, in the case of production sharing contracts.

 

The assignment process, regulated by ANP Resolution No. 785/2019, is the administrative process designed to analyze the request and authorize: the assignment of an E&P contract; the change of concessionaire / contracted due to merger, spin-off and incorporation; the change of operator; and the replacement or exemption from the performance guarantee. The assignment can only be consummated with the signature of the addendum, after the prior and express approval of the ANP granted in the context of the assignment process.

 

Learn more about contract assignment, click here!

Most Read Today
see see
International
5th Congress of the Federation of Portuguese-Speaking La...
05/11/26
FIRJAN
Public-private partnership seen as vital to petrochemica...
05/11/26
Drilling
Norbe VIII, operated by Foresea, is ready to operate in ...
05/11/26
Refineries
TEM Boaventura Consortium completes lift of first reacto...
04/11/26
FIRJAN
Greater natural gas availability strengthens Rio de Jane...
03/11/26
Result
Oil and natural gas production hits a new record in Sept...
03/11/26
Pre-Salt
P-78 Platform (Búzios 6) reaches peak production of 180,...
03/11/26
Auction
Neoenergia wins Lots 1 and 7 in ANEEL Transmission Auction
30/10/26
WPC Energy
WPC Energy welcomes the Republic of Chad into membership
28/10/26
International
PortXL presents its 2026 cohort of 11 maritime startups ...
30/09/26
ADIPEC
ADIPEC 2026 set to welcome record Asian participation as...
29/09/26
ANP
Royalties: amounts referring to July production were dis...
29/09/26
25th WPC
Riyadh Takes Center Stage as Global Energy Heavyweights ...
28/09/26
ROG.e 2026
Petrobras president advocates active exploration and exp...
25/09/26
ROG.e 2026
Nikki Martin, president and CEO of EnerGeo Alliance, spo...
25/09/26
ROG.e 2026
Oil States Highlights Integration Between Engineering, M...
25/09/26
ROG.e 2026
Port of Açu and OceanPact sign agreement for expansion o...
25/09/26
ROG.e 2026
Lumina’s Role and the Impact of ROG.e 2026 on the Energy...
25/09/26
ROG.e 2026
Leaders Identify Brazil as a Pillar of Energy Security a...
24/09/26
ROG.e 2026
Firjan SENAI and Sebrae Rio Connect Small Businesses wit...
24/09/26
ROG.e 2026
PPSA Study Identifies Best Practices to Support Investme...
24/09/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.