Exploration

Noble Energy unveils offshore Israel expansion plans

First production targeted for late 2016.

Noble Energy
17/12/2013 20:22
Visualizações: 247 (0) (0) (0) (0)

 

Noble Energy says the onshore gas compression project at the Ashdod reception terminal on the Israeli coast is progressing. The facility is receiving supplies from the deepwater Tamar field in the Levantine basin.
By mid 2015, Noble aims to enhance deliverability at the plant to 1.2 bcf/d (34 MMcm/d), and increase to 1.5 bcf/d (42 MMcm/d) in 2016. Development of the recent Tamar Southwest discovery is to play a part in the expansion.
Noble’s next major deepwater Israeli development will be the 19-tcf (538-bcm) Leviathan field. It plans multiple phases of development with initial production in 2017.
The company sees further strong exploration potential on its acreage in the Eastern Mediterranean offshore, with around 3 Bbbl of gross unrisked oil potential in the deep Mesozoic play off both Cyprus and Israel, and 4 tcf (113 bcm) of natural gas potential off Cyprus.
Noble expects to resume exploration drilling in the region in late 2014 or early 2015.    
Offshore West Africa, the company’s production is currently 80 MMboe/d. The Alen gas condensate recycling and production facility offshore Equatorial Guinea has ramped up to 28,000 boe/d of condensate. Further enhancements at the field should lift production to 30-35 MMb/d by mid-2014.
The next planned major development project off Equatorial Guinea is the Diega area, with estimated resources of 70-200 MMboe. Recent appraisal drilling at the Diega field encountered significant oil volumes, with a flow test indicating potential deliverability of more than 10 MMb/d per well deliverability.
Noble expects the partners to sanction Diega in 2014 as a subsea tieback to the Aseng FPSO, with first production targeted for late 2016.

Noble Energy says the onshore gas compression project at the Ashdod reception terminal on the Israeli coast is progressing. The facility is receiving supplies from the deepwater Tamar field in the Levantine basin.
By mid 2015, Noble aims to enhance deliverability at the plant to 1.2 bcf/d (34 MMcm/d), and increase to 1.5 bcf/d (42 MMcm/d) in 2016. Development of the recent Tamar Southwest discovery is to play a part in the expansion.


Noble’s next major deepwater Israeli development will be the 19-tcf (538-bcm) Leviathan field. It plans multiple phases of development with initial production in 2017.


The company sees further strong exploration potential on its acreage in the Eastern Mediterranean offshore, with around 3 Bbbl of gross unrisked oil potential in the deep Mesozoic play off both Cyprus and Israel, and 4 tcf (113 bcm) of natural gas potential off Cyprus.


Noble expects to resume exploration drilling in the region in late 2014 or early 2015.    Offshore West Africa, the company’s production is currently 80 MMboe/d. The Alen gas condensate recycling and production facility offshore Equatorial Guinea has ramped up to 28,000 boe/d of condensate. Further enhancements at the field should lift production to 30-35 MMb/d by mid-2014.


The next planned major development project off Equatorial Guinea is the Diega area, with estimated resources of 70-200 MMboe. Recent appraisal drilling at the Diega field encountered significant oil volumes, with a flow test indicating potential deliverability of more than 10 MMb/d per well deliverability.


Noble expects the partners to sanction Diega in 2014 as a subsea tieback to the Aseng FPSO, with first production targeted for late 2016.

 

Most Read Today
see see
State of Ceará
Natural gas arrives in Cariri (CE) and strengthens econo...
16/07/26
Terminals
Vast announces contract extension with PETRONAS Brasil u...
15/07/26
International
War, oil and the dollar: how global fluctuations impact ...
13/07/26
ANP
Third-party access to natural gas flow pipelines and pro...
10/07/26
Agreement
ANP and Petrobras sign agreement to bring 335 offshore w...
07/07/26
Logistics
Vast Infraestrutura and Petrobras strengthen partnership...
07/07/26
IBP Positioning
Change of the instrument does not fix the illegalities o...
07/07/26
Energy Summit
Energy Summit 2026: Embrapii technologies strengthen Bra...
22/06/26
Energy Summit
Biodiesel and renewable fuels move to the center of the ...
22/06/26
Natural Gas
ANP extends public consultation on the calculation of th...
22/06/26
Rio de Janeiro
Firjan’s Oil Yearbook in Rio highlights that positive pr...
22/06/26
Biomethane
With a market five times larger since 2020, the biometha...
22/06/26
Petrobras
Petrobras approves investment in bio-jet fuel and renewa...
22/06/26
BOGE2026
Smart Control Gains Prominence at Bahia Oil & Gas Energy...
09/06/26
BOGE2026
Bahia Oil & Gas Energy Concludes Historic Edition and Se...
06/06/26
Branded Content
Boaventura Energy Complex drives Brazil’s energy future ...
06/06/26
BOGE2026
Mayekawa do Brasil present at Bahia Oil & Gas Energy
06/06/26
BOGE2026
Benel Marks Presence at Bahia Oil & Gas Energy and Annou...
02/06/26
BOGE2026
Bahiagás Highlights Bahia’s Leading Role in the Energy T...
30/05/26
Investments
Petrobras Announces Investments of More Than R$ 70 Billi...
30/05/26
BOGE2026
Oil States Reinforces Commitment to Innovation and Opera...
29/05/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2