Business

Noreco receives permission to drill Norwegian Sea Wildcat

The production licence consists of parts of block 6608/10.

Noreco Norway AS
04/02/2014 13:41
Visualizações: 2498 (0) (0) (0) (0)

 

Noreco receives permission to drill Norwegian Sea Wildcat
The Norwegian Petroleum Directorate has granted Noreco Norway AS a drilling permit for a well located in the Norwegian Sea.
The 6608/10-16 wellbore will be drilled from the Bredford Dolphin drilling facility at position 66º08`38.09″ N and 08º04´00.71″ E.
The drilling programme for wellbore 6608/10-16 relates to drilling of a wildcat well in production licence 484. Noreco Norway AS is the operator with an ownership interest of (30 per cent) and the licensees are Dana Petroleum Norway AS with (30 per cent), Explora Petroleum AS with (30 per cent) and E.ON E&P Norge AS with (10 per cent).
The production licence consists of parts of block 6608/10. The production licence was awarded in APA 2007.
Wildcat well 6608/10-16 is the first exploration well in production licence 484.
The drilling permit is contingent upon the operator securing all other permits and consents required by other authorities prior to starting drilling activities.

The Norwegian Petroleum Directorate has granted Noreco Norway AS a drilling permit for a well located in the Norwegian Sea.


The 6608/10-16 wellbore will be drilled from the Bredford Dolphin drilling facility at position 66º08`38.09″ N and 08º04´00.71″ E.


The drilling programme for wellbore 6608/10-16 relates to drilling of a wildcat well in production licence 484. Noreco Norway AS is the operator with an ownership interest of (30 per cent) and the licensees are Dana Petroleum Norway AS with (30 per cent), Explora Petroleum AS with (30 per cent) and E.ON E&P Norge AS with (10 per cent).


The production licence consists of parts of block 6608/10. The production licence was awarded in APA 2007.


Wildcat well 6608/10-16 is the first exploration well in production licence 484.The drilling permit is contingent upon the operator securing all other permits and consents required by other authorities prior to starting drilling activities.

 

Most Read Today
see see
Drilling
Foresea’s Norbe IX Drillship Undergoes Scheduled Mainten...
21/01/26
State of Ceará
Companies from Ceará lead the H2MOVER-Pecém project, sel...
08/01/26
Maritime Support
Ambipar carries out more than 600 port and maritime emer...
07/01/26
Petrobras
Petrobras celebrates 20 years of the Santos Basin Unit
07/01/26
Pelotas Basin
TGS launches maritime safety application for operations ...
07/01/26
Diesel
Petrobras and Vale move forward with fuel supply partnership
07/01/26
ANP
In November, Brazil produced 4.921 million boe/d
07/01/26
Offshore Operations
Crew training and connectivity are the true enablers of ...
23/12/25
Recognition
IBP Wins the “Events Oscar” Once Again with ROG.e 2024
11/12/25
FIRJAN
Rio Could Generate 676,000 New Jobs by Stimulating Nine ...
11/12/25
Inland Navigation
Grease-Free Revolution in Latin America’s Workboat Sector
10/12/25
PPSA
Production-Sharing Contracts to Produce 2 Million Barrel...
10/12/25
Recognition
National Public Transparency Program Grants Transpetro I...
10/12/25
Logistics
Transpetro expands its logistics operations with the int...
09/12/25
Auction
PPSA raises around R$ 8.8 billion from the sale of the F...
08/12/25
PPSA
Petrobras announces results of PPSA’s Non-Contracted Are...
08/12/25
Niterói
Niterói concludes second edition of Tomorrow Blue Econom...
02/12/25
Recognition
ABS Consulting Earns Third Elev8 GovCon Honor for Excell...
22/11/25
Award
Aed Energy Wins at the 2025 Energy Storage Awards
22/11/25
Mossoró Oil & Gas Energy 2025
PetroSupply Meeting to Boost Business at Mossoró Oil & G...
21/11/25
Results
Union’s Oil Production Reached 174 Thousand Barrels per ...
21/11/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.