Brazil

Operational start-up at Petrobras' third LNG Regasification Terminal

The terminal involved an investment of R$ 1 billion.

Petrobras Agency
27/01/2014 11:43
Operational start-up at Petrobras' third LNG Regasification Terminal Imagem: Petrobras Agency Visualizações: 2675 (0) (0) (0) (0)

 

The Petrobras LNG Regasification Terminal in Bahia brings greater flexibility and assurances to natural gas supplies in Brazil, with regasification capacity now up to 41 million m³/day.
 
At precisely 1:13 pm on Friday (January 24, 2014), Petrobras added to the Brazilian gas pipeline network the first regasified LNG (Liquefied Natural Gas) from its new Regasification Terminal, located in Baía de Todos os Santos, Salvador, in the state of Bahia. The Bahia Regasification Terminal (TRBA) has a regasification capacity of 14 million m³/day of natural gas. With the new terminal now in operation, Petrobras' natural gas regasification capacity has risen from 27 million m³/day to 41 million m³/day, equivalent to almost one and half times the capacity to import gas from Bolivia. The company is already operating the regasification terminals at Pecém (Ceará state) and Guanabara Bay (Rio de Janeiro state) with their respective regasification capacities of 7 million m³/day and 20 million m³/day of natural gas.
 
The LNG is imported from various suppliers around the world in order to meet the domestic demand for natural gas, with a view to providing greater flexibility and guaranteeing supplies, thereby increasing the country’s energy security, which is essential to encourage new investment.
 
The TRBA involved an investment of around R$ 1 billion and is the country’s third LNG regasification terminal. An ingredient of the federal government’s Growth Acceleration Program (PAC), construction of the terminal was begun in 2012 and it was completed on time and generated 3,623 direct jobs in the region, while achieving a level of domestic content in its equipment and services of approximately 90%.

The Petrobras LNG Regasification Terminal in Bahia brings greater flexibility and assurances to natural gas supplies in Brazil, with regasification capacity now up to 41 million m³/day. 


At precisely 1:13 pm on Friday (January 24, 2014), Petrobras added to the Brazilian gas pipeline network the first regasified LNG (Liquefied Natural Gas) from its new Regasification Terminal, located in Baía de Todos os Santos, Salvador, in the state of Bahia. The Bahia Regasification Terminal (TRBA) has a regasification capacity of 14 million m³/day of natural gas. With the new terminal now in operation, Petrobras' natural gas regasification capacity has risen from 27 million m³/day to 41 million m³/day, equivalent to almost one and half times the capacity to import gas from Bolivia. The company is already operating the regasification terminals at Pecém (Ceará state) and Guanabara Bay (Rio de Janeiro state) with their respective regasification capacities of 7 million m³/day and 20 million m³/day of natural gas. 


The LNG is imported from various suppliers around the world in order to meet the domestic demand for natural gas, with a view to providing greater flexibility and guaranteeing supplies, thereby increasing the country’s energy security, which is essential to encourage new investment.


The TRBA involved an investment of around R$ 1 billion and is the country’s third LNG regasification terminal. An ingredient of the federal government’s Growth Acceleration Program (PAC), construction of the terminal was begun in 2012 and it was completed on time and generated 3,623 direct jobs in the region, while achieving a level of domestic content in its equipment and services of approximately 90%.

 

Most Read Today
see see
FIRJAN
Agrega + Indústria brings together entities, companies, ...
29/07/26
SOG 2026
ABPIP brings to Sergipe Oil & Gas a debate on strengthen...
28/07/26
Event
BR Aviation presents its portfolio of customized solutio...
23/07/26
Royalties
Royalties: amounts referring to May production distribut...
23/07/26
Fuels
Fuel and lubricants sector registers 1.8% drop in June, ...
22/07/26
IBP
Studies point to redundancy of the export tax and extra ...
22/07/26
PPSA
7th Spot Auction: PPSA markets cargoes from Atapu and Ba...
20/07/26
Results
Union oil production reaches 244 thousand barrels per da...
17/07/26
State of Ceará
Natural gas arrives in Cariri (CE) and strengthens econo...
16/07/26
Terminals
Vast announces contract extension with PETRONAS Brasil u...
15/07/26
International
War, oil and the dollar: how global fluctuations impact ...
13/07/26
ANP
Third-party access to natural gas flow pipelines and pro...
10/07/26
Agreement
ANP and Petrobras sign agreement to bring 335 offshore w...
07/07/26
Logistics
Vast Infraestrutura and Petrobras strengthen partnership...
07/07/26
IBP Positioning
Change of the instrument does not fix the illegalities o...
07/07/26
Energy Summit
Energy Summit 2026: Embrapii technologies strengthen Bra...
22/06/26
Energy Summit
Biodiesel and renewable fuels move to the center of the ...
22/06/26
Natural Gas
ANP extends public consultation on the calculation of th...
22/06/26
Rio de Janeiro
Firjan’s Oil Yearbook in Rio highlights that positive pr...
22/06/26
Biomethane
With a market five times larger since 2020, the biometha...
22/06/26
Petrobras
Petrobras approves investment in bio-jet fuel and renewa...
22/06/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.