Brazil

Operational start-up at Petrobras' third LNG Regasification Terminal

The terminal involved an investment of R$ 1 billion.

Petrobras Agency
27/01/2014 11:43
Operational start-up at Petrobras' third LNG Regasification Terminal Imagem: Petrobras Agency Visualizações: 1689 (0) (0) (0) (0)

 

The Petrobras LNG Regasification Terminal in Bahia brings greater flexibility and assurances to natural gas supplies in Brazil, with regasification capacity now up to 41 million m³/day.
 
At precisely 1:13 pm on Friday (January 24, 2014), Petrobras added to the Brazilian gas pipeline network the first regasified LNG (Liquefied Natural Gas) from its new Regasification Terminal, located in Baía de Todos os Santos, Salvador, in the state of Bahia. The Bahia Regasification Terminal (TRBA) has a regasification capacity of 14 million m³/day of natural gas. With the new terminal now in operation, Petrobras' natural gas regasification capacity has risen from 27 million m³/day to 41 million m³/day, equivalent to almost one and half times the capacity to import gas from Bolivia. The company is already operating the regasification terminals at Pecém (Ceará state) and Guanabara Bay (Rio de Janeiro state) with their respective regasification capacities of 7 million m³/day and 20 million m³/day of natural gas.
 
The LNG is imported from various suppliers around the world in order to meet the domestic demand for natural gas, with a view to providing greater flexibility and guaranteeing supplies, thereby increasing the country’s energy security, which is essential to encourage new investment.
 
The TRBA involved an investment of around R$ 1 billion and is the country’s third LNG regasification terminal. An ingredient of the federal government’s Growth Acceleration Program (PAC), construction of the terminal was begun in 2012 and it was completed on time and generated 3,623 direct jobs in the region, while achieving a level of domestic content in its equipment and services of approximately 90%.

The Petrobras LNG Regasification Terminal in Bahia brings greater flexibility and assurances to natural gas supplies in Brazil, with regasification capacity now up to 41 million m³/day. 


At precisely 1:13 pm on Friday (January 24, 2014), Petrobras added to the Brazilian gas pipeline network the first regasified LNG (Liquefied Natural Gas) from its new Regasification Terminal, located in Baía de Todos os Santos, Salvador, in the state of Bahia. The Bahia Regasification Terminal (TRBA) has a regasification capacity of 14 million m³/day of natural gas. With the new terminal now in operation, Petrobras' natural gas regasification capacity has risen from 27 million m³/day to 41 million m³/day, equivalent to almost one and half times the capacity to import gas from Bolivia. The company is already operating the regasification terminals at Pecém (Ceará state) and Guanabara Bay (Rio de Janeiro state) with their respective regasification capacities of 7 million m³/day and 20 million m³/day of natural gas. 


The LNG is imported from various suppliers around the world in order to meet the domestic demand for natural gas, with a view to providing greater flexibility and guaranteeing supplies, thereby increasing the country’s energy security, which is essential to encourage new investment.


The TRBA involved an investment of around R$ 1 billion and is the country’s third LNG regasification terminal. An ingredient of the federal government’s Growth Acceleration Program (PAC), construction of the terminal was begun in 2012 and it was completed on time and generated 3,623 direct jobs in the region, while achieving a level of domestic content in its equipment and services of approximately 90%.

 

Most Read Today
see see
Petrobras
Petrobras receives operating license for deepwater explo...
20/10/25
Equatorial Margin
License Grant for Drilling in the Equatorial Margin Is P...
20/10/25
Equatorial Margin
ABESPetro Statement on the Licensing of the Equatorial M...
20/10/25
Energy Transition
BNDES, Petrobras, and Finep select Valetec to manage the...
20/10/25
Pre-Salt
Petrobras and PPSA sign equalization agreement for Jubar...
20/10/25
WPC Energy Youth Forum
Kuwait to Host 8th WPC Energy Youth Forum in October 2025
20/10/25
Exports
Petrobras signs contract to sell six million barrels of ...
20/10/25
Petrobras
Petrobras puts the Harpia supercomputer into operation
10/10/25
PPSA
PPSA Publishes Notice for the Non-Contracted Areas Auction
10/10/25
ROG.e
IBP Launches the New ROG.e: The World’s Largest Energy F...
10/10/25
Pre-Salt
CNPE Sets Minimum Value of BRL 10.2 Billion for the Unio...
08/10/25
Natural Gas
Petrobras Carries Out First Natural Gas Import from Arge...
08/10/25
Agreement
Seagems renews Wärtsilä Lifecycle Agreement to support t...
07/10/25
Pre-Salt
Petrobras begins contracting for the construction of FPS...
03/10/25
International Company News
Alkhorayef Petroleum Company acquires GRC Technologies, ...
01/10/25
Pre-Salt
FPSO P-78 arrives at the Búzios Field
01/10/25
RD&I
Brazil Has the Capacity to Develop Its Own Technology fo...
01/10/25
Equatorial Margin
Ibama Approves Pre-Operational Assessment (APO) Conducte...
26/09/25
Sustainable Aviation
Embraer Advances SAF Studies Following Acquisition of Bi...
26/09/25
International Company News
ExxonMobil Guyana Expands Capacity With Seventh Offshore...
24/09/25
International Company News
More LNG for Europe
24/09/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2