Brazil

Operational start-up at Petrobras' third LNG Regasification Terminal

The terminal involved an investment of R$ 1 billion.

Petrobras Agency
27/01/2014 11:43
Operational start-up at Petrobras' third LNG Regasification Terminal Imagem: Petrobras Agency Visualizações: 1033 (0) (0) (0) (0)

 

The Petrobras LNG Regasification Terminal in Bahia brings greater flexibility and assurances to natural gas supplies in Brazil, with regasification capacity now up to 41 million m³/day.
 
At precisely 1:13 pm on Friday (January 24, 2014), Petrobras added to the Brazilian gas pipeline network the first regasified LNG (Liquefied Natural Gas) from its new Regasification Terminal, located in Baía de Todos os Santos, Salvador, in the state of Bahia. The Bahia Regasification Terminal (TRBA) has a regasification capacity of 14 million m³/day of natural gas. With the new terminal now in operation, Petrobras' natural gas regasification capacity has risen from 27 million m³/day to 41 million m³/day, equivalent to almost one and half times the capacity to import gas from Bolivia. The company is already operating the regasification terminals at Pecém (Ceará state) and Guanabara Bay (Rio de Janeiro state) with their respective regasification capacities of 7 million m³/day and 20 million m³/day of natural gas.
 
The LNG is imported from various suppliers around the world in order to meet the domestic demand for natural gas, with a view to providing greater flexibility and guaranteeing supplies, thereby increasing the country’s energy security, which is essential to encourage new investment.
 
The TRBA involved an investment of around R$ 1 billion and is the country’s third LNG regasification terminal. An ingredient of the federal government’s Growth Acceleration Program (PAC), construction of the terminal was begun in 2012 and it was completed on time and generated 3,623 direct jobs in the region, while achieving a level of domestic content in its equipment and services of approximately 90%.

The Petrobras LNG Regasification Terminal in Bahia brings greater flexibility and assurances to natural gas supplies in Brazil, with regasification capacity now up to 41 million m³/day. 


At precisely 1:13 pm on Friday (January 24, 2014), Petrobras added to the Brazilian gas pipeline network the first regasified LNG (Liquefied Natural Gas) from its new Regasification Terminal, located in Baía de Todos os Santos, Salvador, in the state of Bahia. The Bahia Regasification Terminal (TRBA) has a regasification capacity of 14 million m³/day of natural gas. With the new terminal now in operation, Petrobras' natural gas regasification capacity has risen from 27 million m³/day to 41 million m³/day, equivalent to almost one and half times the capacity to import gas from Bolivia. The company is already operating the regasification terminals at Pecém (Ceará state) and Guanabara Bay (Rio de Janeiro state) with their respective regasification capacities of 7 million m³/day and 20 million m³/day of natural gas. 


The LNG is imported from various suppliers around the world in order to meet the domestic demand for natural gas, with a view to providing greater flexibility and guaranteeing supplies, thereby increasing the country’s energy security, which is essential to encourage new investment.


The TRBA involved an investment of around R$ 1 billion and is the country’s third LNG regasification terminal. An ingredient of the federal government’s Growth Acceleration Program (PAC), construction of the terminal was begun in 2012 and it was completed on time and generated 3,623 direct jobs in the region, while achieving a level of domestic content in its equipment and services of approximately 90%.

 

Most Read Today
see see
Opportunity
IBP President advocates for professional training to fil...
10/04/25
Vitória Petroshow 2025
Anchors' Night celebrates the success of Vitória Petrosh...
10/04/25
Bahia Oil & Gas Energy 2025
Bahia Oil & Gas Energy 2025 is now open for registration
10/04/25
Vitória Petroshow 2025
Vitória PetroShow Generates Nearly R$ 1 Billion in Busin...
09/04/25
Vitória Petroshow 2025
First Day of Vitória PetroShow 2025: Petrobras Announces...
09/04/25
Business
SBM Offshore signs US$400 million Sale and Leaseback agr...
09/04/25
Vitória Petroshow 2025
Vitória PetroShow 2025 reinforces Espírito Santo’s leade...
08/04/25
Vitória Petroshow 2025
Exploration of New Blocks Could Triple Reserves and Doub...
08/04/25
Event
Espírito Santo Unveils New Yearbook Highlighting the Fut...
08/04/25
Vitória Petroshow 2025
Entrepreneurship and Energy Sector Leaders Invite You to...
07/04/25
Vitória Petroshow 2025
Márcio Felix Highlights the Strategic Importance of Vitó...
07/04/25
Vitória Petroshow 2025
Vitória Petroshow highlights Espírito Santo as a nationa...
07/04/25
OTC Houston 2025
OTC Recognizes 2025 Spotlight on New Technology® Award W...
04/04/25
Agreement
Petrobras and Braskem Sign Agreement for Carbon Capture ...
04/04/25
Energy Transition
Oil and Gas Sector Reinforces Its Commitment to Energy T...
04/04/25
Onshore
Oil and gas production in onshore fields is expected to ...
03/04/25
ANP
Proven oil reserves in Brazil increased by 5.92% in 2024.
03/04/25
E&P
Investments in exploration could reach up to US$ 2.3 bil...
03/04/25
International
Sebrae Rio: Registrations for the Technical Mission to O...
02/04/25
Company News
Global Reach Inspires OMMICA to Significant Sales Increase
31/03/25
Local Content
The National Agency of Petroleum, Natural Gas, and Biofu...
28/03/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.