Brazil

Operational start-up at Petrobras' third LNG Regasification Terminal

The terminal involved an investment of R$ 1 billion.

Petrobras Agency
27/01/2014 11:43
Operational start-up at Petrobras' third LNG Regasification Terminal Imagem: Petrobras Agency Visualizações: 1693 (0) (0) (0) (0)

 

The Petrobras LNG Regasification Terminal in Bahia brings greater flexibility and assurances to natural gas supplies in Brazil, with regasification capacity now up to 41 million m³/day.
 
At precisely 1:13 pm on Friday (January 24, 2014), Petrobras added to the Brazilian gas pipeline network the first regasified LNG (Liquefied Natural Gas) from its new Regasification Terminal, located in Baía de Todos os Santos, Salvador, in the state of Bahia. The Bahia Regasification Terminal (TRBA) has a regasification capacity of 14 million m³/day of natural gas. With the new terminal now in operation, Petrobras' natural gas regasification capacity has risen from 27 million m³/day to 41 million m³/day, equivalent to almost one and half times the capacity to import gas from Bolivia. The company is already operating the regasification terminals at Pecém (Ceará state) and Guanabara Bay (Rio de Janeiro state) with their respective regasification capacities of 7 million m³/day and 20 million m³/day of natural gas.
 
The LNG is imported from various suppliers around the world in order to meet the domestic demand for natural gas, with a view to providing greater flexibility and guaranteeing supplies, thereby increasing the country’s energy security, which is essential to encourage new investment.
 
The TRBA involved an investment of around R$ 1 billion and is the country’s third LNG regasification terminal. An ingredient of the federal government’s Growth Acceleration Program (PAC), construction of the terminal was begun in 2012 and it was completed on time and generated 3,623 direct jobs in the region, while achieving a level of domestic content in its equipment and services of approximately 90%.

The Petrobras LNG Regasification Terminal in Bahia brings greater flexibility and assurances to natural gas supplies in Brazil, with regasification capacity now up to 41 million m³/day. 


At precisely 1:13 pm on Friday (January 24, 2014), Petrobras added to the Brazilian gas pipeline network the first regasified LNG (Liquefied Natural Gas) from its new Regasification Terminal, located in Baía de Todos os Santos, Salvador, in the state of Bahia. The Bahia Regasification Terminal (TRBA) has a regasification capacity of 14 million m³/day of natural gas. With the new terminal now in operation, Petrobras' natural gas regasification capacity has risen from 27 million m³/day to 41 million m³/day, equivalent to almost one and half times the capacity to import gas from Bolivia. The company is already operating the regasification terminals at Pecém (Ceará state) and Guanabara Bay (Rio de Janeiro state) with their respective regasification capacities of 7 million m³/day and 20 million m³/day of natural gas. 


The LNG is imported from various suppliers around the world in order to meet the domestic demand for natural gas, with a view to providing greater flexibility and guaranteeing supplies, thereby increasing the country’s energy security, which is essential to encourage new investment.


The TRBA involved an investment of around R$ 1 billion and is the country’s third LNG regasification terminal. An ingredient of the federal government’s Growth Acceleration Program (PAC), construction of the terminal was begun in 2012 and it was completed on time and generated 3,623 direct jobs in the region, while achieving a level of domestic content in its equipment and services of approximately 90%.

 

Most Read Today
see see
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 Opens with Stronger Integr...
09/09/25
Rio Pipeline & Logistics 2025
At Transpetro, Social Responsibility Initiatives Support...
09/09/25
Rio Pipeline & Logistics 2025
DNV participates in Rio Pipeline & Logistics 2025
09/09/25
Rio Pipeline & Logistics 2025
Construtora Elevação Brings Innovation, Efficiency, and ...
09/09/25
ANP
A\Sense wins ANP technology challenge with advanced opti...
09/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 kicks off today, September 9
09/09/25
Minas Gerais
With R$ 314 million investment, pioneering macaúba biofu...
03/09/25
Recognition
Supergasbras earns Gold Seal in the Brazilian GHG Protoc...
03/09/25
FIRJAN
Brazilian industry records four consecutive months witho...
03/09/25
Copel
EPE President presents future outlook for the power sector
03/09/25
FIRJAN
Together with CNI, Firjan launches business mission in t...
03/09/25
Gulf of America
C-Innovation completes successful decommissioning projec...
28/08/25
Equatorial Margin
Rig chartered by Petrobras arrives in Amapá to take part...
19/08/25
FIRJAN
Rio gains Firjan SENAI Metalworking Reference Center
19/08/25
RD&I
CEPETRO develops for Petrobras a tool that integrates mu...
19/08/25
Pre-Salt
Búzios Field surpasses the record level of 900 thousand ...
19/08/25
Logistics
PetroReconcavo and Dislub build an unprecedented oil out...
19/08/25
IBP
NAVE Program advances with 21 energy sector startups
19/08/25
International Event
The 3rd Annual World ReAM Show Returns to Dubai, Bridgin...
13/08/25
Sustainability
ATPI Expands Global Sustainability Portfolio with Brazil...
06/08/25
Results
ANP releases consolidated 2024 data in English for the r...
29/07/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2