Production

P-61 starts production in Rio de Janeiro's Papa Terra field

Petrobras has started production on platform P-61 in Papa Terra field

Petrobras Agency
17/03/2015 16:42
P-61 starts production in Rio de Janeiro's Papa Terra field Imagem: Petrobras Agency Visualizações: 1918 (0) (0) (0) (0)

Petrobras has started production on platform P-61 in Papa Terra field, located near the southern perimeter of the Campos Basin (State of Rio de Janeiro), 110 km off the coast of Brazil and with a water column of 400 to 1,400 m.

Moored in waters 1,200 m deep, the P-61 completes the production system for the Papa Terra field, operating alongside the P-63 FPSO (floating production storage and offloading), commissioned on November 11, 2013.

Thirteen production wells will be connected to the P-61, and the well currently in operation is the PPT-16. Five production and six injection wells are interconnected to the P-63, and a further five injection wells will be added.

Output from P-61 is transferred via flexible lines to FPSO P-63, capable of processing 140 thousand barrels per day (bpd) and 1 million cubic meters (m³) of gas, and injecting 340,000 barrels of water. Shuttle tankers transport the oil from the field and surplus gas not consumed on the platforms is injected into a nearby reservoir.

The P-61 Tension Leg Wellhead Platform (TLWP) is connected to a Tender Assisted Drilling Platform and is equipped with a drilling and well completion rig. This is the first time a platform of this type has been used in Brazil. P-61 is connected to dry completion wells, which means that the well control valves are onboard the platform and not on the seabed.

Wells are connected to the P-63 via subsea flexible pipes with electric heating, a system know as an Integrated Production Bundle, and the field’s 18 production wells feature subsea centrifuge pumps.

The topside of P-61 was built at the Keppel Felds shipyard in Singapore. The hull and mating operation (joining hull and topside) were completed at the Brasfels shipyard in Angra dos Reis (Rio de Janeiro State).

With reservoirs containing 14 to 17 API crude at considerable water depth, developing the Papa-Terra field has been a challenging project for Petrobras, requiring many different innovative solutions.

Papa Terra field is operated by Petrobras (62.5%) in partnership with Chevron (37.5%). Chevron’s participation in developing this field has been an important factor, given its experience with projects of this nature.

Most Read Today
see see
Rio Pipeline & Logistics 2025
ITP Brasil showcases high-performance engineering soluti...
10/09/25
Rio Pipeline & Logistics 2025
Overview of investments in pipeline and logistics infras...
10/09/25
Rio Pipeline & Logistics 2025
Young talents present innovative solutions at the Young ...
10/09/25
Rio Pipeline & Logistics 2025
Ministry of Ports and Airports aims to expand the role o...
10/09/25
Auction
PPSA makes available access to the Hybrid Data Package f...
10/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 Opens with Stronger Integr...
09/09/25
Rio Pipeline & Logistics 2025
At Transpetro, Social Responsibility Initiatives Support...
09/09/25
Rio Pipeline & Logistics 2025
DNV participates in Rio Pipeline & Logistics 2025
09/09/25
Rio Pipeline & Logistics 2025
Construtora Elevação Brings Innovation, Efficiency, and ...
09/09/25
ANP
A\Sense wins ANP technology challenge with advanced opti...
09/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 kicks off today, September 9
09/09/25
Minas Gerais
With R$ 314 million investment, pioneering macaúba biofu...
03/09/25
Recognition
Supergasbras earns Gold Seal in the Brazilian GHG Protoc...
03/09/25
FIRJAN
Brazilian industry records four consecutive months witho...
03/09/25
Copel
EPE President presents future outlook for the power sector
03/09/25
FIRJAN
Together with CNI, Firjan launches business mission in t...
03/09/25
Gulf of America
C-Innovation completes successful decommissioning projec...
28/08/25
Equatorial Margin
Rig chartered by Petrobras arrives in Amapá to take part...
19/08/25
FIRJAN
Rio gains Firjan SENAI Metalworking Reference Center
19/08/25
RD&I
CEPETRO develops for Petrobras a tool that integrates mu...
19/08/25
Pre-Salt
Búzios Field surpasses the record level of 900 thousand ...
19/08/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2