Petrobras

Petrobras on Route 3 Integrated Project

Petrobras Agency
27/03/2023 16:55
Petrobras on Route 3 Integrated Project Imagem: Petrobras Agency Visualizações: 4062 (0) (0) (0) (0)

Petrobras informs that it has signed a contract with the company Toyo Setal Empreendimentos Ltda. to conclude the works on the Natural Gas Processing Unit (UPGN) of the Itaboraí Gaslub Cluster, which had been halted since June 2022.

With the resumption of the UPGN works, the forecast for the start of gas processing operations in the GasLub Cluster is maintained to occur in 2024, in accordance with the Strategic Plan 2023-2027. The other units required to start these operations, such as the auxiliary units located at the GasLub Cluster, and the subsea and onshore pipelines, have already completed their scope, and are in the final commissioning or pre-operation phase.

The Integrated Route 3 Project, of which the UPGN is a part, is strategic for Petrobras and for the country as it will enable the flow and processing of up to 21 million m³/day of natural gas produced in the Santos Basin pre-salt area and increase the supply of natural gas to the Brazilian market, reducing dependence on LNG imports.

Most Read
see see
PPSA
Federal Government receives R$ 917.32 million from Tupi ...
07/04/26
Study
Brazil increases dependence on thermal power, but lack o...
07/04/26
Permanent Offer
Permanent Production Sharing Offer (OPP): ANP publishes ...
07/04/26
Taxation
Infis Consultoria promotes the 4th Oil & Gas Taxation Se...
07/04/26
Green Hydrogen
Study at RCGI maps regions with the greatest potential f...
07/04/26
iBEM26
Goldwind advances in Bahia with factory in Camaçari and ...
27/03/26
iBEM26
Bahia showcases its bioenergy potential and reinforces i...
27/03/26
iBEM26
ESG practices in the renewable energy sector are highlig...
26/03/26
iBEM26
ABPIP highlights the role of independent producers in en...
26/03/26
iBEM26
Jerônimo Rodrigues highlights Bahia’s potential in the e...
26/03/26
Campos Basin
New oil discovery in the pre-salt of the Campos Basin
26/03/26
Royalties
Royalties: amounts related to January production for con...
26/03/26
iBEM26
iBEM 2026 begins in Salvador with debates on energy secu...
25/03/26
iBEM26
iBEM 2026 brings together specialists and discusses the ...
25/03/26
Petrobras
Museum of Petroleum and New Energies will operate in the...
19/03/26
Macaé Energy
Macaé Energy: debates focus on the strategic role of nat...
18/03/26
Macaé Energy
Macaé Energy 2026 strengthens the municipality’s positio...
17/03/26
Macaé Energy
With record-breaking attendance, the Macaé Energy trade ...
17/03/26
Offshore Technology & Subsea Engineering
Trendsetter Vulcan Offshore Customizes Tethered BOP Tech...
17/03/26
Macaé Energy
FIRJAN: Technical Conference is a Highlight of Macaé Ene...
16/03/26
Permanent Offer
Inclusion of 15 New Blocks in Permanent Offer (OPP) Bid ...
14/03/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.