Petrobras

Petrobras performs tests on the GasLub torch system in Itaboraí

T&B Petroleum/Petrobras Agency
27/11/2020 21:27
Petrobras performs tests on the GasLub torch system in Itaboraí Imagem: Petrobras Agency Visualizações: 3009 (0) (0) (0) (0)

The GasLub's torch pilot flare system in Itaboraí will be lit for the first time during tests between the 26th (yesterday) and the 29th of November, from 9am to 8pm. The equipment has the function of guaranteeing the burning of the residual gases when the UPGN - natural gas processing unit goes into operation, being, therefore, a plant safety system.

 

During the tests, it will eventually be possible to see a small flame at the top of the torch tower. The ignition test of the pilot torch flame system is part of the construction schedule and was authorized by the National Agency of Petroleum, Natural Gas and Biofuels, by the State Environmental Institute and by the Fire Department. The tests will be carried out with total safety, with no impact or risk to the surrounding communities.

 

The Integrated Route 3 Project, under construction in Itaboraí (RJ), will be the third route for the flow of natural gas production from Petrobras fields in the Santos Basin pre-salt and will have the capacity to process up to 21 million cubic meters of gas per day. The works for the Natural Gas Processing Unit (UPGN) are on schedule, as is the installation of the onshore gas pipeline that connects Maricá to the GasLub Pole in Itaboraí. The works are expected to be completed in 2021.

Most Read Today
see see
Partnership
Halliburton and Shape Digital establish strategic collab...
06/05/26
ROG.e
ROG.e 2026 will bring together CEOs from TotalEnergies, ...
06/05/26
International
At OTC Houston 2026, Firjan SENAI SESI expands its reach...
06/05/26
International
At OTC Houston 2026, Firjan SENAI holds international ed...
04/05/26
Recognition
BRAVA Energia receives top global industry award for Atl...
04/05/26
International
Brazil reaffirms technological leadership at OTC Houston...
04/05/26
Pre-Salt
PPSA closes 2025 with a net profit of R$ 30.1 million
04/05/26
Results
With 5.531 million boe/d, Brazil continues with record o...
04/05/26
International
Brazil reaffirms technological leadership at OTC Houston...
02/05/26
Environment
Brazil appears among world's largest methane emitters in...
30/04/26
PPSA
Federal Government receives R$ 917.32 million from Tupi ...
07/04/26
Study
Brazil increases dependence on thermal power, but lack o...
07/04/26
Permanent Offer
Permanent Production Sharing Offer (OPP): ANP publishes ...
07/04/26
Taxation
Infis Consultoria promotes the 4th Oil & Gas Taxation Se...
07/04/26
Green Hydrogen
Study at RCGI maps regions with the greatest potential f...
07/04/26
iBEM26
Goldwind advances in Bahia with factory in Camaçari and ...
27/03/26
iBEM26
Bahia showcases its bioenergy potential and reinforces i...
27/03/26
iBEM26
ESG practices in the renewable energy sector are highlig...
26/03/26
iBEM26
ABPIP highlights the role of independent producers in en...
26/03/26
iBEM26
Jerônimo Rodrigues highlights Bahia’s potential in the e...
26/03/26
Campos Basin
New oil discovery in the pre-salt of the Campos Basin
26/03/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.