Investment

Petronas opens O&G training facility

Company invested $76.4 million.

Petronas
28/03/2014 14:15
Visualizações: 2223 (0) (0) (0) (0)

 

Petronas has launched its new training facility known as Institut Teknologi Petroleum Petronas (Instep) Integrated Oil and Gas Training Centre, an industry-scale facility located within the Instep in Batu Rakit, Terengganu on 27 March 2014. The launch of the facility, which is part of Petronas’ continuous efforts to further develop Malaysia’s human capital, was officiated by Terengganu Menteri Besar Datuk Seri Ahmad Said at Instep.
He was accompanied by Youth and Sports Minister Encik Khairy Jamaluddin and Petronas’ President & Group CEO Tan Sri Dato’ Shamsul Azhar Abbas. The IIOGTC comprises replicate of the actual upstream and downstream facilities, and was developed at an estimated cost of RM250 million ($76.4 M).
Besides the upstream and downstream training plants, it also includes a drilling rig, a drilling simulator and an engineering workshop.
The region’s first-of-its-kind training facility was developed with the objective of equipping Instep’s trainees and Petronas’ workforce with necessary knowledge and skills in the oil and gas industry through industrial training conducted in a realistic and safe plant environment.
The IIOGTC will be used by Instep’s Petroleum Technology Programme trainees where they will undergo their on-the-job training at the facility to expose them to real processes and operations in upstream and downstream sectors of the industry. In addition, the training facility is also open to other industry players, either local or international, who want to upskill their engineers and technicians.
Speaking at the event, Tan Sri Dato’ Shamsul Azhar said: “The launch of IIOGTC is a significant accomplishment for Instep throughout its 33-year endeavour in developing Malaysia’s human capital.”
“The development of IIOGTC is one of Petronas’ significant investments in the area of human capital development which aims at creating highly-skilled and qualified manpower to meet the rapidly-growing oil and gas sector in Malaysia,” he added.
Also present at the ceremony were Petronas’ Chief Operating Officer and Executive Vice-President of Downstream Business, Datuk Wan Zulkiflee Wan Ariffin; and Petronas’ Executive Vice-President of Exploration and Production Business, Dato’ Wee Yiaw Hin.
The facility is expected to increase Instep’s training capacity by two-fold to 1,700 trainees per year. Apart from Instep, Petronas has also established several educational institutions namely Universiti Teknologi Petronas (UTP); Akademi Laut Malaysia (ALAM) and Petronas Leadership Centre (PLC).

Petronas has launched its new training facility known as Institut Teknologi Petroleum Petronas (Instep) Integrated Oil and Gas Training Centre, an industry-scale facility located within the Instep in Batu Rakit, Terengganu on 27 March 2014. The launch of the facility, which is part of Petronas’ continuous efforts to further develop Malaysia’s human capital, was officiated by Terengganu Menteri Besar Datuk Seri Ahmad Said at Instep.

He was accompanied by Youth and Sports Minister Encik Khairy Jamaluddin and Petronas’ President & Group CEO Tan Sri Dato’ Shamsul Azhar Abbas. The IIOGTC comprises replicate of the actual upstream and downstream facilities, and was developed at an estimated cost of RM250 million ($76.4 M).

Besides the upstream and downstream training plants, it also includes a drilling rig, a drilling simulator and an engineering workshop.The region’s first-of-its-kind training facility was developed with the objective of equipping Instep’s trainees and Petronas’ workforce with necessary knowledge and skills in the oil and gas industry through industrial training conducted in a realistic and safe plant environment.

The IIOGTC will be used by Instep’s Petroleum Technology Programme trainees where they will undergo their on-the-job training at the facility to expose them to real processes and operations in upstream and downstream sectors of the industry. In addition, the training facility is also open to other industry players, either local or international, who want to upskill their engineers and technicians.

Speaking at the event, Tan Sri Dato’ Shamsul Azhar said: “The launch of IIOGTC is a significant accomplishment for Instep throughout its 33-year endeavour in developing Malaysia’s human capital.”

“The development of IIOGTC is one of Petronas’ significant investments in the area of human capital development which aims at creating highly-skilled and qualified manpower to meet the rapidly-growing oil and gas sector in Malaysia,” he added.

Also present at the ceremony were Petronas’ Chief Operating Officer and Executive Vice-President of Downstream Business, Datuk Wan Zulkiflee Wan Ariffin; and Petronas’ Executive Vice-President of Exploration and Production Business, Dato’ Wee Yiaw Hin.

The facility is expected to increase Instep’s training capacity by two-fold to 1,700 trainees per year. Apart from Instep, Petronas has also established several educational institutions namely Universiti Teknologi Petronas (UTP); Akademi Laut Malaysia (ALAM) and Petronas Leadership Centre (PLC).

 

Most Read Today
see see
FIRJAN
Despite Tariff Hikes, Oil Drives Rio's Trade Flow Up 9% ...
27/02/26
Royalties
December Production Royalty Payments Distributed to Stat...
26/02/26
Award
BRAVA Energia Wins Top Honor at OTC Houston for Atlanta ...
26/02/26
Strategic Agenda
ABPIP Presents 2026 Strategic Agenda to Chairman of the ...
26/02/26
People
TVO Enhances Project Management Expertise
26/02/26
Memorandum of Understanding
Wärtsilä and Abu Dhabi Maritime Academy explore collabor...
12/02/26
Pre-Salt
Petrobras platform P-79 arrives at the Búzios field
12/02/26
Results
Petrobras’ oil and gas production rises 11% and reaches ...
12/02/26
Permanent Offer
Comprehensive and Unprecedented Joint Statement Speeds U...
12/02/26
PPSA
MME and MMA Clear Strategic Pre-Salt Areas, Enabling the...
12/02/26
Biomethane
Biomethane in Focus with Debate on Credit, Regulation, a...
12/02/26
People
Mario Ferreira is the New Commercial Manager at Wiz Corp...
11/02/26
Visas Agreement
Brazil implements electronic VISIT Visa for Chinese citizens
22/01/26
Biofuels
Sifaeg Highlights New Investment Cycle and the Consolida...
21/01/26
Drilling
Foresea’s Norbe IX Drillship Undergoes Scheduled Mainten...
21/01/26
State of Ceará
Companies from Ceará lead the H2MOVER-Pecém project, sel...
08/01/26
Maritime Support
Ambipar carries out more than 600 port and maritime emer...
07/01/26
Petrobras
Petrobras celebrates 20 years of the Santos Basin Unit
07/01/26
Pelotas Basin
TGS launches maritime safety application for operations ...
07/01/26
Diesel
Petrobras and Vale move forward with fuel supply partnership
07/01/26
ANP
In November, Brazil produced 4.921 million boe/d
07/01/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.