Technology

Schlumberger Launches Degradable Alloy Technology to Optimize Well Productivity

The alloy balls degrade predictably in a wide range of downhole conditions.

Schlumberger
27/02/2014 18:09
Visualizações: 2234 (0) (0) (0) (0)

 

Schlumberger announced today the introduction of the ELEMENTAL* degradable alloy balls for multistage stimulation treatments. The technology demonstrates predictable and complete degradation of the alloy balls ensuring maximum well productivity.
“The ELEMENTAL degradable alloy technology enables high-stage-count jobs to be carried out in both cemented and uncemented wells by eliminating the risk of stuck balls and the need to mill them out,” said Mike Garding, president, Completions, Schlumberger. “This technology provides our customers with a step-change increase in operation efficiency, bringing production online faster in conventional and unconventional reservoirs.”
The alloy balls degrade predictably in a wide range of downhole conditions, well depths, temperatures, pressures and well fluids. Controlled degradation takes place without the need for chemical additives, low pH environment, retrieval operations or milling after fracturing.
The ELEMENTAL degradable alloy technology can be used with Schlumberger multistage stimulation systems. The technology has been deployed with the Falcon* multistage stimulation system for uncemented wells in formations representing a significant challenge to degradation times, such as Gold Creek, Slave Point, Glauconite, Cardium, Montney and Lower Montney with bottom hole temperatures as low as 30 degC (86 degF).
The ELEMENTAL alloy technology has also been used in the Bakken basin, where formation temperatures are around 127 degC (260 degF). One customer used the technology to complete and fracture a multi-lateral wellbore containing 42 Falcon stages, 21 per lateral. After each lateral was fractured, the well was allowed to flow back without any of the alloy balls being recovered at surface, validating the swift degradation behavior of the technology.

Schlumberger announced today the introduction of the ELEMENTAL* degradable alloy balls for multistage stimulation treatments. The technology demonstrates predictable and complete degradation of the alloy balls ensuring maximum well productivity.


“The ELEMENTAL degradable alloy technology enables high-stage-count jobs to be carried out in both cemented and uncemented wells by eliminating the risk of stuck balls and the need to mill them out,” said Mike Garding, president, Completions, Schlumberger. “This technology provides our customers with a step-change increase in operation efficiency, bringing production online faster in conventional and unconventional reservoirs.”


The alloy balls degrade predictably in a wide range of downhole conditions, well depths, temperatures, pressures and well fluids. Controlled degradation takes place without the need for chemical additives, low pH environment, retrieval operations or milling after fracturing.


The ELEMENTAL degradable alloy technology can be used with Schlumberger multistage stimulation systems. The technology has been deployed with the Falcon* multistage stimulation system for uncemented wells in formations representing a significant challenge to degradation times, such as Gold Creek, Slave Point, Glauconite, Cardium, Montney and Lower Montney with bottom hole temperatures as low as 30 degC (86 degF).


The ELEMENTAL alloy technology has also been used in the Bakken basin, where formation temperatures are around 127 degC (260 degF). One customer used the technology to complete and fracture a multi-lateral wellbore containing 42 Falcon stages, 21 per lateral. After each lateral was fractured, the well was allowed to flow back without any of the alloy balls being recovered at surface, validating the swift degradation behavior of the technology.

 

Most Read
see see
PPSA
PPSA Publishes Notice for the Non-Contracted Areas Auction
10/10/25
ROG.e
IBP Launches the New ROG.e: The World’s Largest Energy F...
10/10/25
Pre-Salt
CNPE Sets Minimum Value of BRL 10.2 Billion for the Unio...
08/10/25
Natural Gas
Petrobras Carries Out First Natural Gas Import from Arge...
08/10/25
Agreement
Seagems renews Wärtsilä Lifecycle Agreement to support t...
07/10/25
Pre-Salt
Petrobras begins contracting for the construction of FPS...
03/10/25
International Company News
Alkhorayef Petroleum Company acquires GRC Technologies, ...
01/10/25
Pre-Salt
FPSO P-78 arrives at the Búzios Field
01/10/25
RD&I
Brazil Has the Capacity to Develop Its Own Technology fo...
01/10/25
Equatorial Margin
Ibama Approves Pre-Operational Assessment (APO) Conducte...
26/09/25
Sustainable Aviation
Embraer Advances SAF Studies Following Acquisition of Bi...
26/09/25
International Company News
ExxonMobil Guyana Expands Capacity With Seventh Offshore...
24/09/25
International Company News
More LNG for Europe
24/09/25
International Company News
Viking Completes Milestone Delivery to African Energy Pr...
24/09/25
Company News
CHC Helicopter Opens Hangar at Farol de São Tomé Helipor...
22/09/25
International Company News
“Sercel supplies sensors and trucks for major North Afri...
22/09/25
Geological Studies
R&D Clause Enables Project to Strengthen Critical Minera...
15/09/25
Fuels
ANP Approves Pilot Project with New Fuel Inspection Equi...
15/09/25
RD&I
Sensor Developed by Unicamp and UnB Advances in Internat...
15/09/25
Event
ABPIP Hosts SMS Oil & Gas Meeting Focused on Leadership,...
15/09/25
International
Petrobras announces participation in exploratory block i...
15/09/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.