Business

SLB OneSubsea Signs Contract with Petrobras for Subsea Equipment Acquisition for the Roncador Field

T&B Petroleum/Petrobras Agency
20/08/2024 18:30
SLB OneSubsea Signs Contract with Petrobras for Subsea Equipment Acquisition for the Roncador Field Imagem: Image SLB OneSubsea Visualizações: 3203 (0) (0) (0) (0)

Last Friday (16th), Petrobras signed a contract for the acquisition of subsea equipment for the Roncador field in the Campos Basin. The contract is expected to generate approximately 500 direct and indirect jobs.

The agreement with the SLB OneSubsea group includes the supply of 2 Subsea Production Manifolds (SPM), 1 Electro-Hydraulic Distribution Unit (EHDU), and spare parts. The service provision includes installation, commissioning, intervention, maintenance, and preservation of the equipment.

The contract sets a minimum requirement of 40% local content for goods and services demands. However, it is expected to reach a percentage of 65%, contributing to the strengthening of the national economy.

The manufacturing of the SPM and EHDU will take place at SLB OneSubsea facilities in Taubaté (SP) and Curitiba (PR), with the production process scheduled to begin in the first quarter of 2025. The service demands will be met by factories in Macaé (RJ) and Rio das Ostras (RJ).

These subsea equipment components are essential for offshore oil and gas production projects. The Subsea Production Manifold (SPM) consolidates the production from two or more wells before directing it to the Floating Production Storage and Offloading Unit (FPSO). The Electro-Hydraulic Distribution Units (EHDU) provide the necessary hydraulic fluid for connecting subsea umbilicals between the wells and the FPSO.

About the Roncador Field

The P-52 (Mod 1A), P-54 (Mod 2), P-55 (Mod 3), and P-62 (Mod 4) platforms produce oil and gas from the Roncador field, which is a strategic partnership with Equinor. Petrobras holds a 75% stake in the Roncador field, while Equinor holds 25%.

While the P-54 and P-62 are FPSO units (Floating Production Storage and Offloading), the P-52 and P-55 are SS-type stationary production units (semi-submersible stationary units), having been installed in the years 2007, 2007, 2013, and 2014, respectively. They are installed at water depths between 1400m and 1840m.

 

 

 

 

Most Read Today
see see
FIRJAN
By 2035+, Rio de Janeiro State’s Energy Potential Could ...
23/10/25
Pre-Salt
PPSA to auction in December the first share of governmen...
23/10/25
Auction
Petrobras wins auction and leases RDJ07 terminal at the ...
23/10/25
Permanent Offer
Equinor acquires two new blocks in the Campos Basin duri...
23/10/25
OTC Brasil 2025
OTC Brasil 2025 Kicks Off in One Week with a Packed Prog...
22/10/25
Agreement
Wärtsilä Lifecycle agreement renewed to maintain safe, r...
22/10/25
Petrobras
Petrobras receives operating license for deepwater explo...
20/10/25
Equatorial Margin
License Grant for Drilling in the Equatorial Margin Is P...
20/10/25
Equatorial Margin
ABESPetro Statement on the Licensing of the Equatorial M...
20/10/25
Energy Transition
BNDES, Petrobras, and Finep select Valetec to manage the...
20/10/25
Pre-Salt
Petrobras and PPSA sign equalization agreement for Jubar...
20/10/25
WPC Energy Youth Forum
Kuwait to Host 8th WPC Energy Youth Forum in October 2025
20/10/25
Exports
Petrobras signs contract to sell six million barrels of ...
20/10/25
Petrobras
Petrobras puts the Harpia supercomputer into operation
10/10/25
PPSA
PPSA Publishes Notice for the Non-Contracted Areas Auction
10/10/25
ROG.e
IBP Launches the New ROG.e: The World’s Largest Energy F...
10/10/25
Pre-Salt
CNPE Sets Minimum Value of BRL 10.2 Billion for the Unio...
08/10/25
Natural Gas
Petrobras Carries Out First Natural Gas Import from Arge...
08/10/25
Agreement
Seagems renews Wärtsilä Lifecycle Agreement to support t...
07/10/25
Pre-Salt
Petrobras begins contracting for the construction of FPS...
03/10/25
International Company News
Alkhorayef Petroleum Company acquires GRC Technologies, ...
01/10/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2