Companies

Technip wins Jangkrik subsea package

Its unique subsea vertical integration and strong presence in Asia.

Technip
06/03/2014 12:58
Visualizações: 791 (0) (0) (0) (0)

 

Technip wins Jangkrik subsea package in Indonesia Leveraging its unique subsea vertical integration and strong presence in Asia
Technip has been awarded a major subsea contract by Eni Muara Bakau B.V. (Eni) the Operator of the Muara Bakau PSC, for the Jangkrik project located in the Muara Bakau PSC working area, approximately 70 kilometers off the coast of Makassar Strait, Indonesia, at water depth ranging from 200 to 430 meters.
The contract covers the engineering, procurement, commissioning and installation of:
• 36 kilometers of flexible risers and flowlines with diameters ranging from 4" to 14", • 195 kilometers of pipeline with diameter ranging from 4" to 24", • subsea equipment which includes mid-water arch and flowline end termination.
Technip will also carry out the installation of 51 kilometers of umbilicals, five manifolds and seven SSIV(2) subsea structures and associated flying leads. Finally, the project also includes the engineering, procurement and construction of an onshore receiving facility including pig traps, metering systems and utilities.
The project is scheduled to be completed in the first quarter of 2017.
The flexible pipes will be manufactured at Technip’s Asiaflex Products plant in Tanjung Langsat, Johor, Malaysia. Technip’s S-Lay and heavy-lift vessel, G1201 and its multipurpose installation and construction vessel, the Deep Orient, will be used for the installation.
Lim Kwee Keong, Senior Vice President of Technip in Asia Pacific stated: "We are delighted to support Eni in bringing the Jangkrik project onstream. This contract is an excellent example of Technip’s capability to propose competitive solutions for large and complex projects which combine onshore and subsea scopes. It confirms the relevance of our strategy of vertical integration to provide best-in-class solutions to our clients' projects.”

Technip has been awarded a major subsea contract by Eni Muara Bakau B.V. (Eni) the Operator of the Muara Bakau PSC, for the Jangkrik project located in the Muara Bakau PSC working area, approximately 70 kilometers off the coast of Makassar Strait, Indonesia, at water depth ranging from 200 to 430 meters.


The contract covers the engineering, procurement, commissioning and installation of:


• 36 kilometers of flexible risers and flowlines with diameters ranging from 4" to 14", • 195 kilometers of pipeline with diameter ranging from 4" to 24", • subsea equipment which includes mid-water arch and flowline end termination.Technip will also carry out the installation of 51 kilometers of umbilicals, five manifolds and seven SSIV(2) subsea structures and associated flying leads. Finally, the project also includes the engineering, procurement and construction of an onshore receiving facility including pig traps, metering systems and utilities.


The project is scheduled to be completed in the first quarter of 2017.


The flexible pipes will be manufactured at Technip’s Asiaflex Products plant in Tanjung Langsat, Johor, Malaysia. Technip’s S-Lay and heavy-lift vessel, G1201 and its multipurpose installation and construction vessel, the Deep Orient, will be used for the installation.


Lim Kwee Keong, Senior Vice President of Technip in Asia Pacific stated: "We are delighted to support Eni in bringing the Jangkrik project onstream. This contract is an excellent example of Technip’s capability to propose competitive solutions for large and complex projects which combine onshore and subsea scopes. It confirms the relevance of our strategy of vertical integration to provide best-in-class solutions to our clients' projects.”

 

Most Read Today
see see
FIRJAN
Despite Tariff Hikes, Oil Drives Rio's Trade Flow Up 9% ...
27/02/26
Royalties
December Production Royalty Payments Distributed to Stat...
26/02/26
Award
BRAVA Energia Wins Top Honor at OTC Houston for Atlanta ...
26/02/26
Strategic Agenda
ABPIP Presents 2026 Strategic Agenda to Chairman of the ...
26/02/26
People
TVO Enhances Project Management Expertise
26/02/26
Memorandum of Understanding
Wärtsilä and Abu Dhabi Maritime Academy explore collabor...
12/02/26
Pre-Salt
Petrobras platform P-79 arrives at the Búzios field
12/02/26
Results
Petrobras’ oil and gas production rises 11% and reaches ...
12/02/26
Permanent Offer
Comprehensive and Unprecedented Joint Statement Speeds U...
12/02/26
PPSA
MME and MMA Clear Strategic Pre-Salt Areas, Enabling the...
12/02/26
Biomethane
Biomethane in Focus with Debate on Credit, Regulation, a...
12/02/26
People
Mario Ferreira is the New Commercial Manager at Wiz Corp...
11/02/26
Visas Agreement
Brazil implements electronic VISIT Visa for Chinese citizens
22/01/26
Biofuels
Sifaeg Highlights New Investment Cycle and the Consolida...
21/01/26
Drilling
Foresea’s Norbe IX Drillship Undergoes Scheduled Mainten...
21/01/26
State of Ceará
Companies from Ceará lead the H2MOVER-Pecém project, sel...
08/01/26
Maritime Support
Ambipar carries out more than 600 port and maritime emer...
07/01/26
Petrobras
Petrobras celebrates 20 years of the Santos Basin Unit
07/01/26
Pelotas Basin
TGS launches maritime safety application for operations ...
07/01/26
Diesel
Petrobras and Vale move forward with fuel supply partnership
07/01/26
ANP
In November, Brazil produced 4.921 million boe/d
07/01/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.