Companies

Technip wins Jangkrik subsea package

Its unique subsea vertical integration and strong presence in Asia.

Technip
06/03/2014 12:58
Visualizações: 1021 (0) (0) (0) (0)

 

Technip wins Jangkrik subsea package in Indonesia Leveraging its unique subsea vertical integration and strong presence in Asia
Technip has been awarded a major subsea contract by Eni Muara Bakau B.V. (Eni) the Operator of the Muara Bakau PSC, for the Jangkrik project located in the Muara Bakau PSC working area, approximately 70 kilometers off the coast of Makassar Strait, Indonesia, at water depth ranging from 200 to 430 meters.
The contract covers the engineering, procurement, commissioning and installation of:
• 36 kilometers of flexible risers and flowlines with diameters ranging from 4" to 14", • 195 kilometers of pipeline with diameter ranging from 4" to 24", • subsea equipment which includes mid-water arch and flowline end termination.
Technip will also carry out the installation of 51 kilometers of umbilicals, five manifolds and seven SSIV(2) subsea structures and associated flying leads. Finally, the project also includes the engineering, procurement and construction of an onshore receiving facility including pig traps, metering systems and utilities.
The project is scheduled to be completed in the first quarter of 2017.
The flexible pipes will be manufactured at Technip’s Asiaflex Products plant in Tanjung Langsat, Johor, Malaysia. Technip’s S-Lay and heavy-lift vessel, G1201 and its multipurpose installation and construction vessel, the Deep Orient, will be used for the installation.
Lim Kwee Keong, Senior Vice President of Technip in Asia Pacific stated: "We are delighted to support Eni in bringing the Jangkrik project onstream. This contract is an excellent example of Technip’s capability to propose competitive solutions for large and complex projects which combine onshore and subsea scopes. It confirms the relevance of our strategy of vertical integration to provide best-in-class solutions to our clients' projects.”

Technip has been awarded a major subsea contract by Eni Muara Bakau B.V. (Eni) the Operator of the Muara Bakau PSC, for the Jangkrik project located in the Muara Bakau PSC working area, approximately 70 kilometers off the coast of Makassar Strait, Indonesia, at water depth ranging from 200 to 430 meters.


The contract covers the engineering, procurement, commissioning and installation of:


• 36 kilometers of flexible risers and flowlines with diameters ranging from 4" to 14", • 195 kilometers of pipeline with diameter ranging from 4" to 24", • subsea equipment which includes mid-water arch and flowline end termination.Technip will also carry out the installation of 51 kilometers of umbilicals, five manifolds and seven SSIV(2) subsea structures and associated flying leads. Finally, the project also includes the engineering, procurement and construction of an onshore receiving facility including pig traps, metering systems and utilities.


The project is scheduled to be completed in the first quarter of 2017.


The flexible pipes will be manufactured at Technip’s Asiaflex Products plant in Tanjung Langsat, Johor, Malaysia. Technip’s S-Lay and heavy-lift vessel, G1201 and its multipurpose installation and construction vessel, the Deep Orient, will be used for the installation.


Lim Kwee Keong, Senior Vice President of Technip in Asia Pacific stated: "We are delighted to support Eni in bringing the Jangkrik project onstream. This contract is an excellent example of Technip’s capability to propose competitive solutions for large and complex projects which combine onshore and subsea scopes. It confirms the relevance of our strategy of vertical integration to provide best-in-class solutions to our clients' projects.”

 

Most Read Today
see see
Navalshore
Firjan SENAI presents the Supplier Opportunities Network...
17/08/26
Equatorial Margin
Morpho Well: Petrobras discovers hydrocarbons in ultra-d...
15/08/26
Power Generation
Campo Grande hosts four days of debates on bioenergy and...
12/08/26
International
KPMG: fossil fuel consumption falls, despite oil's signi...
12/08/26
Fenasucro
Fenasucro & Agrocana opening highlights Brazil's leaders...
12/08/26
Event
IBP and BIP bring together leaders to discuss technology...
11/08/26
Event
Asset Management gains prominence in corporate strategy;...
11/08/26
Macaé
Foresea takes part in WSOP 2026 and reinforces that safe...
11/08/26
Sergipe-Alagoas Basin
Siemens Energy advances offshore expansion in Brazil wit...
10/08/26
Campos Basin
Raia Project Reaches New Milestones in One of Brazil’s M...
06/08/26
Permanent Offer
ANP Takes Part in Ceremony Marking the Signing of Contra...
05/08/26
SOG 2026
ABPIP Strengthens Territorial Development Agenda in Serg...
04/08/26
SOG 2026
SOG26 Surpasses the Previous Edition and Reinforces Serg...
03/08/26
People
Shell Brasil Begins a New Leadership Cycle with João San...
03/08/26
Results
ANP Releases Consolidated Data on Oil and Gas Production...
03/08/26
SOG 2026
Banco do Nordeste Has R$ 504 Million for the Energy Sect...
03/08/26
PPSA
TotalEnergies and ExxonMobil Win Atapu and Bacalhau Cargoes
31/07/26
SOG 2026
Sebrae Sergipe Strengthens Small Businesses and Expands ...
31/07/26
PPSA
PPSA Expects to Hold the First Auction of the Union’s Na...
30/07/26
SOG 2026
Sergipe Oil & Gas 2026 Begins with a Focus on Investment...
30/07/26
SOG 2026
Petrobras Director Opens Sergipe Oil & Gas with Analysis...
30/07/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.