Companies

Technip wins Jangkrik subsea package

Its unique subsea vertical integration and strong presence in Asia.

Technip
06/03/2014 12:58
Visualizações: 1090 (0) (0) (0) (0)

 

Technip wins Jangkrik subsea package in Indonesia Leveraging its unique subsea vertical integration and strong presence in Asia
Technip has been awarded a major subsea contract by Eni Muara Bakau B.V. (Eni) the Operator of the Muara Bakau PSC, for the Jangkrik project located in the Muara Bakau PSC working area, approximately 70 kilometers off the coast of Makassar Strait, Indonesia, at water depth ranging from 200 to 430 meters.
The contract covers the engineering, procurement, commissioning and installation of:
• 36 kilometers of flexible risers and flowlines with diameters ranging from 4" to 14", • 195 kilometers of pipeline with diameter ranging from 4" to 24", • subsea equipment which includes mid-water arch and flowline end termination.
Technip will also carry out the installation of 51 kilometers of umbilicals, five manifolds and seven SSIV(2) subsea structures and associated flying leads. Finally, the project also includes the engineering, procurement and construction of an onshore receiving facility including pig traps, metering systems and utilities.
The project is scheduled to be completed in the first quarter of 2017.
The flexible pipes will be manufactured at Technip’s Asiaflex Products plant in Tanjung Langsat, Johor, Malaysia. Technip’s S-Lay and heavy-lift vessel, G1201 and its multipurpose installation and construction vessel, the Deep Orient, will be used for the installation.
Lim Kwee Keong, Senior Vice President of Technip in Asia Pacific stated: "We are delighted to support Eni in bringing the Jangkrik project onstream. This contract is an excellent example of Technip’s capability to propose competitive solutions for large and complex projects which combine onshore and subsea scopes. It confirms the relevance of our strategy of vertical integration to provide best-in-class solutions to our clients' projects.”

Technip has been awarded a major subsea contract by Eni Muara Bakau B.V. (Eni) the Operator of the Muara Bakau PSC, for the Jangkrik project located in the Muara Bakau PSC working area, approximately 70 kilometers off the coast of Makassar Strait, Indonesia, at water depth ranging from 200 to 430 meters.


The contract covers the engineering, procurement, commissioning and installation of:


• 36 kilometers of flexible risers and flowlines with diameters ranging from 4" to 14", • 195 kilometers of pipeline with diameter ranging from 4" to 24", • subsea equipment which includes mid-water arch and flowline end termination.Technip will also carry out the installation of 51 kilometers of umbilicals, five manifolds and seven SSIV(2) subsea structures and associated flying leads. Finally, the project also includes the engineering, procurement and construction of an onshore receiving facility including pig traps, metering systems and utilities.


The project is scheduled to be completed in the first quarter of 2017.


The flexible pipes will be manufactured at Technip’s Asiaflex Products plant in Tanjung Langsat, Johor, Malaysia. Technip’s S-Lay and heavy-lift vessel, G1201 and its multipurpose installation and construction vessel, the Deep Orient, will be used for the installation.


Lim Kwee Keong, Senior Vice President of Technip in Asia Pacific stated: "We are delighted to support Eni in bringing the Jangkrik project onstream. This contract is an excellent example of Technip’s capability to propose competitive solutions for large and complex projects which combine onshore and subsea scopes. It confirms the relevance of our strategy of vertical integration to provide best-in-class solutions to our clients' projects.”

 

Most Read Today
see see
International
PortXL presents its 2026 cohort of 11 maritime startups ...
30/09/26
ADIPEC
ADIPEC 2026 set to welcome record Asian participation as...
29/09/26
ANP
Royalties: amounts referring to July production were dis...
29/09/26
25th WPC
Riyadh Takes Center Stage as Global Energy Heavyweights ...
28/09/26
ROG.e 2026
Petrobras president advocates active exploration and exp...
25/09/26
ROG.e 2026
Nikki Martin, president and CEO of EnerGeo Alliance, spo...
25/09/26
ROG.e 2026
Oil States Highlights Integration Between Engineering, M...
25/09/26
ROG.e 2026
Port of Açu and OceanPact sign agreement for expansion o...
25/09/26
ROG.e 2026
Lumina’s Role and the Impact of ROG.e 2026 on the Energy...
25/09/26
ROG.e 2026
Leaders Identify Brazil as a Pillar of Energy Security a...
24/09/26
ROG.e 2026
Firjan SENAI and Sebrae Rio Connect Small Businesses wit...
24/09/26
ROG.e 2026
PPSA Study Identifies Best Practices to Support Investme...
24/09/26
ROG.e 2026
ROG.e 2026 Reinforces the DE&I Agenda in the Energy Sect...
24/09/26
ROG.e 2026
IBP Launches Publication on Energy Companies’ Socio-envi...
23/09/26
ROG.e 2026
Industry Giants and Independent Producers Accelerate Pro...
22/09/26
ROG.e 2026
Firjan Attends ROG.e 2026 Opening Ceremony and Signs Tec...
22/09/26
ROG.e 2026
ROG.e 2026 Opening Ceremony Highlights Just Energy Trans...
21/09/26
ROG.e 2026
Global Leaders Position Brazil as a Hub of Stability, At...
21/09/26
ROG.e 2026
Exclusive Interview: Pelagus targets Brazil to strengthe...
21/09/26
ROG.e 2026
At ROG.e, Firjan SENAI Holds the 30th Edition of the Sup...
21/09/26
ROG.e 2026
ROG.e 2026 kicks off next Monday (21) with global energy...
19/09/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.