Campos Basin

The revitalization of the Barracuda and Caratinga fields (BC) will have a new FPSO.

The new unit will have a production capacity of 100,000 barrels of oil per day.

T&B Petroleum/Petrobras Agency
04/08/2023 20:55
The revitalization of the Barracuda and Caratinga fields (BC) will have a new FPSO. Imagem: Divulgation Visualizações: 3891 (0) (0) (0) (0)

Petrobras has started the hiring process for the FPSO (Floating Production Storage and Offloading) vessel for the Barracuda and Caratinga Fields Revitalization Project, another significant milestone in the revitalization plan for the Campos Basin. The bidding process was published on the Petronect portal this Friday (04/08).

The new FPSO will have the capacity to produce up to 100,000 barrels of oil per day (bpd) and process up to 6 million m3 of gas daily, increasing the recovery factor in adherence to Petrobras' commitment to reducing atmospheric emissions. The project specifications include technologies to reduce greenhouse gas emissions, such as a closed flare gas recovery system (FGRS), equipment with fugitive emissions reduction requirements, as well as the possibility of adopting cogeneration by combined cycle and all-electric concepts. This is another major revitalization project by Petrobras, whose value adds significant benefits to society and the environment.

"In addition to its relevance to the revitalization plan for mature fields in the Campos Basin, the hiring of this new FPSO is important because the unit's project features align with Petrobras' emissions reduction strategy. It will be a platform that produces in a more optimized and sustainable way," explains Carlos Travassos (pictured), Director of Engineering, Technology, and Innovation at Petrobras.

The revitalization of the Campos Basin is part of the largest project for the recovery of mature assets in the global offshore industry. The Marlim and Voador fields will have the FPSOs Anita Garibaldi (with production expected to start in the coming weeks) and Anna Nery (already in production), with a combined capacity to produce up to 150,000 bpd. To implement the new production projects, Petrobras will drill 14 new wells and relocate another 61, and with the effort of reservoir revitalization, the forecast is to increase production gains for the field.

As an international offshore technology hub and the birthplace of deepwater production in Brazil, the Campos Basin has been a pioneer in innovation and will continue to be so for both decommissioning projects and the revitalization of mature concessions.

Most Read Today
see see
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 Opens with Stronger Integr...
09/09/25
Rio Pipeline & Logistics 2025
At Transpetro, Social Responsibility Initiatives Support...
09/09/25
Rio Pipeline & Logistics 2025
DNV participates in Rio Pipeline & Logistics 2025
09/09/25
Rio Pipeline & Logistics 2025
Construtora Elevação Brings Innovation, Efficiency, and ...
09/09/25
ANP
A\Sense wins ANP technology challenge with advanced opti...
09/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 kicks off today, September 9
09/09/25
Minas Gerais
With R$ 314 million investment, pioneering macaúba biofu...
03/09/25
Recognition
Supergasbras earns Gold Seal in the Brazilian GHG Protoc...
03/09/25
FIRJAN
Brazilian industry records four consecutive months witho...
03/09/25
Copel
EPE President presents future outlook for the power sector
03/09/25
FIRJAN
Together with CNI, Firjan launches business mission in t...
03/09/25
Gulf of America
C-Innovation completes successful decommissioning projec...
28/08/25
Equatorial Margin
Rig chartered by Petrobras arrives in Amapá to take part...
19/08/25
FIRJAN
Rio gains Firjan SENAI Metalworking Reference Center
19/08/25
RD&I
CEPETRO develops for Petrobras a tool that integrates mu...
19/08/25
Pre-Salt
Búzios Field surpasses the record level of 900 thousand ...
19/08/25
Logistics
PetroReconcavo and Dislub build an unprecedented oil out...
19/08/25
IBP
NAVE Program advances with 21 energy sector startups
19/08/25
International Event
The 3rd Annual World ReAM Show Returns to Dubai, Bridgin...
13/08/25
Sustainability
ATPI Expands Global Sustainability Portfolio with Brazil...
06/08/25
Results
ANP releases consolidated 2024 data in English for the r...
29/07/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2