North Sea

Two more rigs mobilizing to Ekofisk area offshore Norway

The 2/7 S platform has 40 well slots.

ConocoPhillips
10/03/2014 15:27
Visualizações: 1803 (0) (0) (0) (0)

 

ConocoPhillips Norge plans an intensive drilling program at the Greater Ekofisk Area in the southern Norwegian North Sea.
The new wells are designed to sustain production from the Ekofisk and Eldfisk fields for several more decades.
This spring the newbuild West Linus will arrive at the Ekofisk Complex to start a multi-year drilling program at the Ekofisk 2/4 Z wellhead platform.
When the campaign is completed, 2/4 Z will have 35 production wells and one well for reinjection of drill cuttings.
On the neighboring wellhead platform Ekofisk 2/4M, the Rowan Norway will perform slot recovery on seven wells.
Mærsk Innovator is currently completing wells on the Ekofisk 2/4 V B seabed installation. This facility has eight water injection wells to maintain pressure in the reservoir. The same rig will start drilling production wells on Eldfisk 2/7 S later this year.
The 2/7 S platform has 40 well slots. So far the Maersk Gallant has drilled four production wells and one well for reinjection of drill cuttings.
Rowan Gorilla VI will also arrive in the spring to plug wells on Ekofisk 2/4 A, which was shut down last September following 39 years of oil production. In total, 23 wells will be plugged on the platform.
In addition, ConocoPhillips anticipates a busy activity period for two of the permanent platform drilling rigs, Ekofisk 2/4 X and 2/4 K.

ConocoPhillips Norge plans an intensive drilling program at the Greater Ekofisk Area in the southern Norwegian North Sea.

 

The new wells are designed to sustain production from the Ekofisk and Eldfisk fields for several more decades.

 

This spring the newbuild West Linus will arrive at the Ekofisk Complex to start a multi-year drilling program at the Ekofisk 2/4 Z wellhead platform.

 

When the campaign is completed, 2/4 Z will have 35 production wells and one well for reinjection of drill cuttings.

 

On the neighboring wellhead platform Ekofisk 2/4M, the Rowan Norway will perform slot recovery on seven wells.

 

Mærsk Innovator is currently completing wells on the Ekofisk 2/4 V B seabed installation. This facility has eight water injection wells to maintain pressure in the reservoir. The same rig will start drilling production wells on Eldfisk 2/7 S later this year.

 

The 2/7 S platform has 40 well slots. So far the Maersk Gallant has drilled four production wells and one well for reinjection of drill cuttings.

 

Rowan Gorilla VI will also arrive in the spring to plug wells on Ekofisk 2/4 A, which was shut down last September following 39 years of oil production. In total, 23 wells will be plugged on the platform.

 

In addition, ConocoPhillips anticipates a busy activity period for two of the permanent platform drilling rigs, Ekofisk 2/4 X and 2/4 K.

 

Most Read
see see
PPSA
Federal Government receives R$ 917.32 million from Tupi ...
07/04/26
Study
Brazil increases dependence on thermal power, but lack o...
07/04/26
Permanent Offer
Permanent Production Sharing Offer (OPP): ANP publishes ...
07/04/26
Taxation
Infis Consultoria promotes the 4th Oil & Gas Taxation Se...
07/04/26
Green Hydrogen
Study at RCGI maps regions with the greatest potential f...
07/04/26
iBEM26
Goldwind advances in Bahia with factory in Camaçari and ...
27/03/26
iBEM26
Bahia showcases its bioenergy potential and reinforces i...
27/03/26
iBEM26
ESG practices in the renewable energy sector are highlig...
26/03/26
iBEM26
ABPIP highlights the role of independent producers in en...
26/03/26
iBEM26
Jerônimo Rodrigues highlights Bahia’s potential in the e...
26/03/26
Campos Basin
New oil discovery in the pre-salt of the Campos Basin
26/03/26
Royalties
Royalties: amounts related to January production for con...
26/03/26
iBEM26
iBEM 2026 begins in Salvador with debates on energy secu...
25/03/26
iBEM26
iBEM 2026 brings together specialists and discusses the ...
25/03/26
Petrobras
Museum of Petroleum and New Energies will operate in the...
19/03/26
Macaé Energy
Macaé Energy: debates focus on the strategic role of nat...
18/03/26
Macaé Energy
Macaé Energy 2026 strengthens the municipality’s positio...
17/03/26
Macaé Energy
With record-breaking attendance, the Macaé Energy trade ...
17/03/26
Offshore Technology & Subsea Engineering
Trendsetter Vulcan Offshore Customizes Tethered BOP Tech...
17/03/26
Macaé Energy
FIRJAN: Technical Conference is a Highlight of Macaé Ene...
16/03/26
Permanent Offer
Inclusion of 15 New Blocks in Permanent Offer (OPP) Bid ...
14/03/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.