North Sea

Two more rigs mobilizing to Ekofisk area offshore Norway

The 2/7 S platform has 40 well slots.

ConocoPhillips
10/03/2014 15:27
Visualizações: 2823 (0) (0) (0) (0)

 

ConocoPhillips Norge plans an intensive drilling program at the Greater Ekofisk Area in the southern Norwegian North Sea.
The new wells are designed to sustain production from the Ekofisk and Eldfisk fields for several more decades.
This spring the newbuild West Linus will arrive at the Ekofisk Complex to start a multi-year drilling program at the Ekofisk 2/4 Z wellhead platform.
When the campaign is completed, 2/4 Z will have 35 production wells and one well for reinjection of drill cuttings.
On the neighboring wellhead platform Ekofisk 2/4M, the Rowan Norway will perform slot recovery on seven wells.
Mærsk Innovator is currently completing wells on the Ekofisk 2/4 V B seabed installation. This facility has eight water injection wells to maintain pressure in the reservoir. The same rig will start drilling production wells on Eldfisk 2/7 S later this year.
The 2/7 S platform has 40 well slots. So far the Maersk Gallant has drilled four production wells and one well for reinjection of drill cuttings.
Rowan Gorilla VI will also arrive in the spring to plug wells on Ekofisk 2/4 A, which was shut down last September following 39 years of oil production. In total, 23 wells will be plugged on the platform.
In addition, ConocoPhillips anticipates a busy activity period for two of the permanent platform drilling rigs, Ekofisk 2/4 X and 2/4 K.

ConocoPhillips Norge plans an intensive drilling program at the Greater Ekofisk Area in the southern Norwegian North Sea.

 

The new wells are designed to sustain production from the Ekofisk and Eldfisk fields for several more decades.

 

This spring the newbuild West Linus will arrive at the Ekofisk Complex to start a multi-year drilling program at the Ekofisk 2/4 Z wellhead platform.

 

When the campaign is completed, 2/4 Z will have 35 production wells and one well for reinjection of drill cuttings.

 

On the neighboring wellhead platform Ekofisk 2/4M, the Rowan Norway will perform slot recovery on seven wells.

 

Mærsk Innovator is currently completing wells on the Ekofisk 2/4 V B seabed installation. This facility has eight water injection wells to maintain pressure in the reservoir. The same rig will start drilling production wells on Eldfisk 2/7 S later this year.

 

The 2/7 S platform has 40 well slots. So far the Maersk Gallant has drilled four production wells and one well for reinjection of drill cuttings.

 

Rowan Gorilla VI will also arrive in the spring to plug wells on Ekofisk 2/4 A, which was shut down last September following 39 years of oil production. In total, 23 wells will be plugged on the platform.

 

In addition, ConocoPhillips anticipates a busy activity period for two of the permanent platform drilling rigs, Ekofisk 2/4 X and 2/4 K.

 

Most Read Today
see see
International
5th Congress of the Federation of Portuguese-Speaking La...
05/11/26
FIRJAN
Public-private partnership seen as vital to petrochemica...
05/11/26
Drilling
Norbe VIII, operated by Foresea, is ready to operate in ...
05/11/26
Refineries
TEM Boaventura Consortium completes lift of first reacto...
04/11/26
FIRJAN
Greater natural gas availability strengthens Rio de Jane...
03/11/26
Result
Oil and natural gas production hits a new record in Sept...
03/11/26
Pre-Salt
P-78 Platform (Búzios 6) reaches peak production of 180,...
03/11/26
Auction
Neoenergia wins Lots 1 and 7 in ANEEL Transmission Auction
30/10/26
WPC Energy
WPC Energy welcomes the Republic of Chad into membership
28/10/26
International
PortXL presents its 2026 cohort of 11 maritime startups ...
30/09/26
ADIPEC
ADIPEC 2026 set to welcome record Asian participation as...
29/09/26
ANP
Royalties: amounts referring to July production were dis...
29/09/26
25th WPC
Riyadh Takes Center Stage as Global Energy Heavyweights ...
28/09/26
ROG.e 2026
Petrobras president advocates active exploration and exp...
25/09/26
ROG.e 2026
Nikki Martin, president and CEO of EnerGeo Alliance, spo...
25/09/26
ROG.e 2026
Oil States Highlights Integration Between Engineering, M...
25/09/26
ROG.e 2026
Port of Açu and OceanPact sign agreement for expansion o...
25/09/26
ROG.e 2026
Lumina’s Role and the Impact of ROG.e 2026 on the Energy...
25/09/26
ROG.e 2026
Leaders Identify Brazil as a Pillar of Energy Security a...
24/09/26
ROG.e 2026
Firjan SENAI and Sebrae Rio Connect Small Businesses wit...
24/09/26
ROG.e 2026
PPSA Study Identifies Best Practices to Support Investme...
24/09/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.