Company News

Alstom completes Brazil’s first M-Upgrades on GT11N2 gas turbines at Enel´s Fortaleza power plant

Alstom
28/09/2015 16:39
Alstom completes Brazil’s first M-Upgrades on GT11N2 gas turbines at Enel´s Fortaleza power plant Imagem: Alstom Visualizações: 2749 (0) (0) (0) (0)

Alstom has completed the implementation of the first M-upgrades on two GT11N2 gas turbines installed in Central Geradora Termelétrica Fortaleza (CGTF), a combined-cycle power plant owned by Enel located in the northeast of Brazil. The upgrades were successfully implemented within the 30 days window of a regular major scheduled outage, part of a contract award to Alstom in 2013 for maintenance of gas turbines, including support on site and remote support for all types of inspections until 2023.

 

The M-upgrade is a product developed by Alstom that enhances power output, efficiency and availability of the gas turbine in a flexible way through extended intervals between outages. In the case of CGTF, the product increased the capacity by more than 8MW for each gas turbine.

 

“This is an important milestone for us since it is not only about the conclusion of another successful outage in Fortaleza, but also the first time that a company does this type of upgrade in Brazil. The completion of this task reinforces that our technology and technical support will ensure high availability of the plant with a safe and reliable operation”, commented Michael Rechsteiner, Senior Vice President of Alstom Thermal Services.

 

Alstom has a long contribution to the Brazilian market for power generation. In addition to CGTF (Enel) plant, Alstom has supplied similar equipment and services for other gas fired power plants such as UTE Leonel Brizola, UTE Fernando Gasparian and Celso Furtado (Petrobras) and for CSA Siderúrgica do Atlântico (ThyssenKrupp).

Most Read Today
see see
Royalties
Royalties: amounts related to January production for con...
26/03/26
iBEM26
iBEM 2026 begins in Salvador with debates on energy secu...
25/03/26
iBEM26
iBEM 2026 brings together specialists and discusses the ...
25/03/26
Petrobras
Museum of Petroleum and New Energies will operate in the...
19/03/26
Macaé Energy
Macaé Energy: debates focus on the strategic role of nat...
18/03/26
Macaé Energy
Macaé Energy 2026 strengthens the municipality’s positio...
17/03/26
Macaé Energy
With record-breaking attendance, the Macaé Energy trade ...
17/03/26
Offshore Technology & Subsea Engineering
Trendsetter Vulcan Offshore Customizes Tethered BOP Tech...
17/03/26
Macaé Energy
FIRJAN: Technical Conference is a Highlight of Macaé Ene...
16/03/26
Permanent Offer
Inclusion of 15 New Blocks in Permanent Offer (OPP) Bid ...
14/03/26
Rio de Janeiro
Rio City Hall Signs Agreement to Transfer Automóvel Club...
13/03/26
Result
Porto do Açu Sets Historic Record in Cargo Handling
13/03/26
Environment
Following COP30, IBP Organizes Meeting to Debate Brazil'...
13/03/26
Jet Fuel
Resolution Approved to Revise Aviation Kerosene Quality ...
13/03/26
Biofuels
ANP to Participate in Research Project on Increasing Bio...
13/03/26
Results
Petrobras Paid R$ 277.6 Billion in Taxes and Government ...
13/03/26
North Sea
Two new discoveries in the North Sea
11/03/26
Macaé Energy
At Macaé Energy 2026, FIRJAN Promotes Special Edition of...
09/03/26
iBEM26
Innovation, ESG, and Sustainability
06/03/26
iBEM26
Artificial Intelligence drives increased demand for elec...
02/03/26
FIRJAN
Despite Tariff Hikes, Oil Drives Rio's Trade Flow Up 9% ...
27/02/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.