Company News

Alstom completes Brazil’s first M-Upgrades on GT11N2 gas turbines at Enel´s Fortaleza power plant

Alstom
28/09/2015 16:39
Alstom completes Brazil’s first M-Upgrades on GT11N2 gas turbines at Enel´s Fortaleza power plant Imagem: Alstom Visualizações: 1927 (0) (0) (0) (0)

Alstom has completed the implementation of the first M-upgrades on two GT11N2 gas turbines installed in Central Geradora Termelétrica Fortaleza (CGTF), a combined-cycle power plant owned by Enel located in the northeast of Brazil. The upgrades were successfully implemented within the 30 days window of a regular major scheduled outage, part of a contract award to Alstom in 2013 for maintenance of gas turbines, including support on site and remote support for all types of inspections until 2023.

 

The M-upgrade is a product developed by Alstom that enhances power output, efficiency and availability of the gas turbine in a flexible way through extended intervals between outages. In the case of CGTF, the product increased the capacity by more than 8MW for each gas turbine.

 

“This is an important milestone for us since it is not only about the conclusion of another successful outage in Fortaleza, but also the first time that a company does this type of upgrade in Brazil. The completion of this task reinforces that our technology and technical support will ensure high availability of the plant with a safe and reliable operation”, commented Michael Rechsteiner, Senior Vice President of Alstom Thermal Services.

 

Alstom has a long contribution to the Brazilian market for power generation. In addition to CGTF (Enel) plant, Alstom has supplied similar equipment and services for other gas fired power plants such as UTE Leonel Brizola, UTE Fernando Gasparian and Celso Furtado (Petrobras) and for CSA Siderúrgica do Atlântico (ThyssenKrupp).

Most Read Today
see see
ADIPEC 2025
ADIPEC 2025 Day 3: Energy, finance and technology leader...
07/11/25
Results
Petrobras reaches net income of R$ 32.7 billion in the t...
07/11/25
Cop30
IBP Advocates Global Criteria for a Just Energy Transition
07/11/25
Offshore
Decommissioning Takes Center Stage
07/11/25
Natural Gas
ANP Approves Action Plan on Gas Pipeline Transportation ...
07/11/25
ADIPEC 2025
AI is no longer a side project: Technology leaders at AD...
05/11/25
Environment
ANP Holds Workshop on Methane Emissions in Partnership w...
05/11/25
International Event
International Energy Event Opens Registration for Activities
05/11/25
RD&I
Norway and Brazil Launch New Joint Research Funding Call...
05/11/25
Partnership
DeepOcean and Jana Marine enter Saudi Arabia subsea part...
04/11/25
ADIPEC 2025
ADIPEC 2025: Industry calls for policy pragmatism, embra...
04/11/25
ADIPEC 2025
Johnson Matthey: Leadership and Innovation Driving the G...
31/10/25
OTC Brasil 2025
OTC Brazil connects the Equatorial Margin’s potential to...
30/10/25
OTC Brasil 2025
New Version of ANP’s Greenhouse Gas Emissions Dynamic Da...
30/10/25
OTC Brasil 2025
Port of Açu and IKM Advance Partnership to Create Brazil...
30/10/25
OTC Brasil 2025
Port of Açu and SISTAC Sign Agreement to Provide Decommi...
29/10/25
Royalties
Royalties from August Production Distributed to States a...
29/10/25
OTC Brasil 2025
iUP Innovation Connections Links Innovation Strategy to ...
29/10/25
ANP
Permanent Production Sharing Offer: Registered Companies...
29/10/25
OTC Brasil 2025
Firjan Showcases Technology and Innovation Solutions for...
29/10/25
OTC Brasil 2025
O&G exploration is key to social development and a just ...
28/10/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.