Pre-Salt

Consortium approves working and investment plan for Libra in 2014

Capital for these activities is US$ 400 million.

Petrobras
24/01/2014 11:24
Consortium approves working and investment plan for Libra in 2014 Imagem: TB Petroleum Visualizações: 2908 (0) (0) (0) (0)

 

Petrobras announces that the consortium formed by Petrobras (40%), Shell (20%), Total (20%), CNOOC (10%) and CNPC (10%), along with Pré-Sal Petróleo S.A. (PPSA), has approved, on the Operational Committee meeting held on January 21st, the working and investment plan for Libra in 2014.  
The main activities included in the working plan are: seismic reprocessing in the whole area of the block; drilling of two wells starting on the 2nd half of 2014 with estimated conclusion on the 1st half of 2015; and studies for a new seismic acquisition using high-end technologies and for an extended well test forecasted for the end of 2016. The approved capital expenditure for these activities in 2014 is within a range of US$ 400 million and US$ 500 million.
The production share contract of Libra states that the exploration phase of the block will have duration of four years from the contract signature date, which happened on December 2nd, 2013. The minimum exploratory program, to be carried out during this period, includes 3D seismic acquisition for the whole block, two exploratory wells and one extended well test.
The Libra block is located in ultra deep waters of Santos Basin pre-salt and is considered a prospect of high potential. The total extension of the area is 1,547.76 km2 and was discovered by well 2-ANP-0002ARJS, drilled in 2010.

Petrobras announces that the consortium formed by Petrobras (40%), Shell (20%), Total (20%), CNOOC (10%) and CNPC (10%), along with Pré-Sal Petróleo S.A. (PPSA), has approved, on the Operational Committee meeting held on January 21st, the working and investment plan for Libra in 2014.  


The main activities included in the working plan are: seismic reprocessing in the whole area of the block; drilling of two wells starting on the 2nd half of 2014 with estimated conclusion on the 1st half of 2015; and studies for a new seismic acquisition using high-end technologies and for an extended well test forecasted for the end of 2016. The approved capital expenditure for these activities in 2014 is within a range of US$ 400 million and US$ 500 million.


The production share contract of Libra states that the exploration phase of the block will have duration of four years from the contract signature date, which happened on December 2nd, 2013. The minimum exploratory program, to be carried out during this period, includes 3D seismic acquisition for the whole block, two exploratory wells and one extended well test.


The Libra block is located in ultra deep waters of Santos Basin pre-salt and is considered a prospect of high potential. The total extension of the area is 1,547.76 km2 and was discovered by well 2-ANP-0002ARJS, drilled in 2010.

Most Read Today
see see
Navalshore
Firjan SENAI presents the Supplier Opportunities Network...
17/08/26
Equatorial Margin
Morpho Well: Petrobras discovers hydrocarbons in ultra-d...
15/08/26
Power Generation
Campo Grande hosts four days of debates on bioenergy and...
12/08/26
International
KPMG: fossil fuel consumption falls, despite oil's signi...
12/08/26
Fenasucro
Fenasucro & Agrocana opening highlights Brazil's leaders...
12/08/26
Event
IBP and BIP bring together leaders to discuss technology...
11/08/26
Event
Asset Management gains prominence in corporate strategy;...
11/08/26
Macaé
Foresea takes part in WSOP 2026 and reinforces that safe...
11/08/26
Sergipe-Alagoas Basin
Siemens Energy advances offshore expansion in Brazil wit...
10/08/26
Campos Basin
Raia Project Reaches New Milestones in One of Brazil’s M...
06/08/26
Permanent Offer
ANP Takes Part in Ceremony Marking the Signing of Contra...
05/08/26
SOG 2026
ABPIP Strengthens Territorial Development Agenda in Serg...
04/08/26
SOG 2026
SOG26 Surpasses the Previous Edition and Reinforces Serg...
03/08/26
People
Shell Brasil Begins a New Leadership Cycle with João San...
03/08/26
Results
ANP Releases Consolidated Data on Oil and Gas Production...
03/08/26
SOG 2026
Banco do Nordeste Has R$ 504 Million for the Energy Sect...
03/08/26
PPSA
TotalEnergies and ExxonMobil Win Atapu and Bacalhau Cargoes
31/07/26
SOG 2026
Sebrae Sergipe Strengthens Small Businesses and Expands ...
31/07/26
PPSA
PPSA Expects to Hold the First Auction of the Union’s Na...
30/07/26
SOG 2026
Sergipe Oil & Gas 2026 Begins with a Focus on Investment...
30/07/26
SOG 2026
Petrobras Director Opens Sergipe Oil & Gas with Analysis...
30/07/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.