Exploration

Dragon Oil expands offshore Turkmenistan drilling fleet

The Caspian Driller is expected to join the fleet later in 2014.

Dragon Oil
22/04/2014 19:36
Visualizações: 251 (0) (0) (0) (0)

 

Dragon Oil has three drilling rigs operating in the Cheleken Contract Area of the Turkmen sector of the Caspian Sea, with Land Rig 2 expected to start drilling before mid-year.
The Caspian Driller is expected to join the fleet later in 2014.
The water injection pilot project in the Dzheitune (Lam) 75 area is currently injecting around 3,600 b/d of water into the reservoir, with reservoir pressure in the area showing a sustained rising trend.
Dragon has started a tendering process for water injection facilities to be installed at the Dzheitune (Lam) 10 and 13 platforms in order to expand the waterflood program in the Dzheitune (Lam) main field. The overall goal is to maintain pressure, sustain production rates, and increase reserves recovery.
Tendering continues for jet pump systems for up to 14 more wells, all due to be installed from 2H 2014-1Q 2015. The objective is to increase production and enhance recovery.
In February, Dragon awarded a contract for construction and installation of a new wellhead and production platform Dzheitune (Lam) E and associated pipelines. The platform should be completed during the first half of 2016. It will have eight fitted slots with space for another four to be added later, suitable for use by a jackup.
Work will start soon to relocate the Dzhygalybeg (Zhdanov) B platform to the Dzheitune (Lam) field location Lam F. Modifications and subsequent installations are expected to be completed by the end of this year.
The company has started the tendering process for a contractor to lay another 30-in. subsea trunkline from the Dzheitune (Lam) field to the central processing facility. Construction is due to start two years after the contract is awarded.
Recently the company awarded a contract to dredge the harbor area and the Aladja export Jetty on the Turkmen coast. The two-year project is designed to increase offshore vessel handling capacity and to enhance crude oil loading.
Offshore the Philippines, the country’s Department of Energy is concluding approvals for Dragon to farm into 40% of Service Contract 63 in the NW Palawan basin from Nido Petroleum Philippines.
The partners plan to start drilling the Baragatan-1 well before mid-year.

Dragon Oil has three drilling rigs operating in the Cheleken Contract Area of the Turkmen sector of the Caspian Sea, with Land Rig 2 expected to start drilling before mid-year.

The Caspian Driller is expected to join the fleet later in 2014.


The water injection pilot project in the Dzheitune (Lam) 75 area is currently injecting around 3,600 b/d of water into the reservoir, with reservoir pressure in the area showing a sustained rising trend.


Dragon has started a tendering process for water injection facilities to be installed at the Dzheitune (Lam) 10 and 13 platforms in order to expand the waterflood program in the Dzheitune (Lam) main field. The overall goal is to maintain pressure, sustain production rates, and increase reserves recovery.


Tendering continues for jet pump systems for up to 14 more wells, all due to be installed from 2H 2014-1Q 2015. The objective is to increase production and enhance recovery.


In February, Dragon awarded a contract for construction and installation of a new wellhead and production platform Dzheitune (Lam) E and associated pipelines. The platform should be completed during the first half of 2016. It will have eight fitted slots with space for another four to be added later, suitable for use by a jackup.


Work will start soon to relocate the Dzhygalybeg (Zhdanov) B platform to the Dzheitune (Lam) field location Lam F. Modifications and subsequent installations are expected to be completed by the end of this year.


The company has started the tendering process for a contractor to lay another 30-in. subsea trunkline from the Dzheitune (Lam) field to the central processing facility. Construction is due to start two years after the contract is awarded.


Recently the company awarded a contract to dredge the harbor area and the Aladja export Jetty on the Turkmen coast. The two-year project is designed to increase offshore vessel handling capacity and to enhance crude oil loading.


Offshore the Philippines, the country’s Department of Energy is concluding approvals for Dragon to farm into 40% of Service Contract 63 in the NW Palawan basin from Nido Petroleum Philippines.


The partners plan to start drilling the Baragatan-1 well before mid-year.

Most Read Today
see see
Sergipe-Alagoas Basin
Siemens Energy advances offshore expansion in Brazil wit...
10/08/26
Campos Basin
Raia Project Reaches New Milestones in One of Brazil’s M...
06/08/26
Permanent Offer
ANP Takes Part in Ceremony Marking the Signing of Contra...
05/08/26
SOG 2026
ABPIP Strengthens Territorial Development Agenda in Serg...
04/08/26
SOG 2026
SOG26 Surpasses the Previous Edition and Reinforces Serg...
03/08/26
People
Shell Brasil Begins a New Leadership Cycle with João San...
03/08/26
Results
ANP Releases Consolidated Data on Oil and Gas Production...
03/08/26
SOG 2026
Banco do Nordeste Has R$ 504 Million for the Energy Sect...
03/08/26
PPSA
TotalEnergies and ExxonMobil Win Atapu and Bacalhau Cargoes
31/07/26
SOG 2026
Sebrae Sergipe Strengthens Small Businesses and Expands ...
31/07/26
PPSA
PPSA Expects to Hold the First Auction of the Union’s Na...
30/07/26
SOG 2026
Sergipe Oil & Gas 2026 Begins with a Focus on Investment...
30/07/26
SOG 2026
Petrobras Director Opens Sergipe Oil & Gas with Analysis...
30/07/26
FIRJAN
Agrega + Indústria brings together entities, companies, ...
29/07/26
SOG 2026
ABPIP brings to Sergipe Oil & Gas a debate on strengthen...
28/07/26
Event
BR Aviation presents its portfolio of customized solutio...
23/07/26
Royalties
Royalties: amounts referring to May production distribut...
23/07/26
Fuels
Fuel and lubricants sector registers 1.8% drop in June, ...
22/07/26
IBP
Studies point to redundancy of the export tax and extra ...
22/07/26
PPSA
7th Spot Auction: PPSA markets cargoes from Atapu and Ba...
20/07/26
Results
Union oil production reaches 244 thousand barrels per da...
17/07/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2