FPSO

FPSO Cidade de Caraguatatuba MV27 Achieves First Oil

Commencement of Charter of the Fifth MODEC FPSO Delivered to the Pre-Salt Region Offshore Brazil

Press Release
29/12/2016 13:14
FPSO Cidade de Caraguatatuba MV27 Achieves First Oil Imagem: Divulgation Modec/FPSO Cidade de Caraguatatuba MV27 Visualizações: 3113 (0) (0) (0) (0)

MODEC announced today that the FPSO Cidade de Caraguatatuba MV27 (“the FPSO”), deployed for operation in the Lapa oil field (formerly Carioca oil field) in the “pre-salt” region of the Santos Basin off the coast of Brazil, has achieved the First Oil production on December 19, 2016.

 

The FPSO is leased on a 20 year charter contract to Guará B.V., an affiliate of Consortium BM-S-09 which is responsible for production development of the field – comprising leader and operator, Petróleo Brasileiro S.A. (“Petrobras”) and its partners. Moored about 300 kilometers south of Rio de Janeiro in water depths of 2,126 meters, the FPSO is capable of processing 100,000 barrels of oil and 177 MM standard cubic feet of gas per day and has a storage capacity of 1,600,000 barrels of crude oil.

 

This is the eleventh vessel (FPSO/FSO) MODEC has delivered to the Brazilian oil & gas sector and represents the fifth MODEC FPSO delivered to the pre-salt region – following on from FPSO Cidade de Angra dos Reis MV22, FPSO Cidade de São Paulo MV23, FPSO Cidade de Mangaratiba MV24 and FPSO Cidade de Itaguaí MV26.

 

The FPSO’s new-build hull was constructed by Mitsui Engineering & Shipbuilding Co., Ltd. in Chiba, Japan while its topsides process modules and related structures were constructed at a variety of locations in Asia – prior to installation, integration and commissioning in Singapore and Brazil.

 

Toshiro Miyazaki, President & CEO of MODEC said, “We are pleased to have safely achieved the First Oil production by this high quality new-build FPSO. This significant achievement was made possible by the strong working relationship and teamwork established between our Project Execution Team and Petrobras which we hope to replicate on future projects.”

Most Read
see see
PPSA
Federal Government receives R$ 917.32 million from Tupi ...
07/04/26
Study
Brazil increases dependence on thermal power, but lack o...
07/04/26
Permanent Offer
Permanent Production Sharing Offer (OPP): ANP publishes ...
07/04/26
Taxation
Infis Consultoria promotes the 4th Oil & Gas Taxation Se...
07/04/26
Green Hydrogen
Study at RCGI maps regions with the greatest potential f...
07/04/26
iBEM26
Goldwind advances in Bahia with factory in Camaçari and ...
27/03/26
iBEM26
Bahia showcases its bioenergy potential and reinforces i...
27/03/26
iBEM26
ESG practices in the renewable energy sector are highlig...
26/03/26
iBEM26
ABPIP highlights the role of independent producers in en...
26/03/26
iBEM26
Jerônimo Rodrigues highlights Bahia’s potential in the e...
26/03/26
Campos Basin
New oil discovery in the pre-salt of the Campos Basin
26/03/26
Royalties
Royalties: amounts related to January production for con...
26/03/26
iBEM26
iBEM 2026 begins in Salvador with debates on energy secu...
25/03/26
iBEM26
iBEM 2026 brings together specialists and discusses the ...
25/03/26
Petrobras
Museum of Petroleum and New Energies will operate in the...
19/03/26
Macaé Energy
Macaé Energy: debates focus on the strategic role of nat...
18/03/26
Macaé Energy
Macaé Energy 2026 strengthens the municipality’s positio...
17/03/26
Macaé Energy
With record-breaking attendance, the Macaé Energy trade ...
17/03/26
Offshore Technology & Subsea Engineering
Trendsetter Vulcan Offshore Customizes Tethered BOP Tech...
17/03/26
Macaé Energy
FIRJAN: Technical Conference is a Highlight of Macaé Ene...
16/03/26
Permanent Offer
Inclusion of 15 New Blocks in Permanent Offer (OPP) Bid ...
14/03/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.