Press Release/T&B Petroleum
Oceânica informs that during the last July, two massive Brazilian FPSO projects achieved an important milestone. The P-74 and P-76 hulls left the Inhauma yard and were towed to each integration site for the final phase of the projects.
Since the beginning of the Cessão Onerosa (P-74, P-75, P-76 e P-77) and Replicantes (P-66, P-67, P-68, P-69, P-70, P-71) FPSOs, Oceânica has performed several engineering and field activities for these units, such as:
• Stability analyses and booklets
• Topside modules load-out engineering and coordination
• Rigging plans and coordination
• Weight control and modules weighing
• Vessel ballasting plans and coordination
• Motion analyses
• Tow masters and marine personnel
• Structural analyses for topsides, hull and auxiliary systems
• Towing plans, procedures and simulation for all maneuvers from hull conversion yard to integration sites*
• Mooring plans, procedures and supervision, among others