Offshore

Lundin searches for more oil in North Sea fields

Wells are on the Storm prospect.

Lundin
07/02/2014 19:23
Visualizações: 2484 (0) (0) (0) (0)

 

Lundin Oil will drill an appraisal well during the current quarter on the southeastern part of the Edvard Grieg reservoir in the central Norwegian North Sea.
It hopes to prove more reserves and optimize the location of wells for the ongoing Edvard Grieg development.
In the same area, the company is looking to drill a second appraisal well on its Luno II discovery in license PL359 (Luno II North) and an exploration well on the 23 MMboe Fignon Miocene prospect.
Lundin’s Barents Sea plans this year include an appraisal well on last year’s Gohta discovery and an exploration well on the Alta prospect on PL609.
In the northern Norwegian North Sea, Lundin is lining up wells on the Storm prospect in PL555 and on Vollgrav in PL631, between the Statfjord and Gullfaks fields.
Farther north, the company plans exploration drilling on the Lindarormen structure in PL584 in the Norwegian Sea (south of the Åsgard field and southwest of the Draugen field); and in the Barents Sea, an appraisal well on last year’s Gohta discovery and an exploration well on the Alta prospect in PL609.
At the Marathon-operated Alvheim development in the North Sea, Lundin says three infill wells will be drilled during 2014-2015. However, drilling of the North Kameleon exploration prospect north of Alvheim will probably be deferred until 2015 due to delays in the semisubmersible Transocean Winner’s schedule.
For the same reason, first oil from the Bøyla field has been revised to 1Q 2015, with Transocean Winner starting work on development drilling later this year. Two production wells and one water injection well will be tied back 28 km (17.4 mi) to the Alvheim FPSO via subsea facilities. Fabrication of the subsea structures is under way.
Lundin expects the BG-operated Gaupe field, which has performed below expectations, to cease production later this year.
 

Lundin Oil will drill an appraisal well during the current quarter on the southeastern part of the Edvard Grieg reservoir in the central Norwegian North Sea. It hopes to prove more reserves and optimize the location of wells for the ongoing Edvard Grieg development.


In the same area, the company is looking to drill a second appraisal well on its Luno II discovery in license PL359 (Luno II North) and an exploration well on the 23 MMboe Fignon Miocene prospect. Lundin’s Barents Sea plans this year include an appraisal well on last year’s Gohta discovery and an exploration well on the Alta prospect on PL609.


In the northern Norwegian North Sea, Lundin is lining up wells on the Storm prospect in PL555 and on Vollgrav in PL631, between the Statfjord and Gullfaks fields.


Farther north, the company plans exploration drilling on the Lindarormen structure in PL584 in the Norwegian Sea (south of the Åsgard field and southwest of the Draugen field); and in the Barents Sea, an appraisal well on last year’s Gohta discovery and an exploration well on the Alta prospect in PL609.


At the Marathon-operated Alvheim development in the North Sea, Lundin says three infill wells will be drilled during 2014-2015. However, drilling of the North Kameleon exploration prospect north of Alvheim will probably be deferred until 2015 due to delays in the semisubmersible Transocean Winner’s schedule.


For the same reason, first oil from the Bøyla field has been revised to 1Q 2015, with Transocean Winner starting work on development drilling later this year. Two production wells and one water injection well will be tied back 28 km (17.4 mi) to the Alvheim FPSO via subsea facilities. Fabrication of the subsea structures is under way.


Lundin expects the BG-operated Gaupe field, which has performed below expectations, to cease production later this year. 

Most Read
see see
Visas Agreement
Brazil implements electronic VISIT Visa for Chinese citizens
22/01/26
Biofuels
Sifaeg Highlights New Investment Cycle and the Consolida...
21/01/26
Drilling
Foresea’s Norbe IX Drillship Undergoes Scheduled Mainten...
21/01/26
State of Ceará
Companies from Ceará lead the H2MOVER-Pecém project, sel...
08/01/26
Maritime Support
Ambipar carries out more than 600 port and maritime emer...
07/01/26
Petrobras
Petrobras celebrates 20 years of the Santos Basin Unit
07/01/26
Pelotas Basin
TGS launches maritime safety application for operations ...
07/01/26
Diesel
Petrobras and Vale move forward with fuel supply partnership
07/01/26
ANP
In November, Brazil produced 4.921 million boe/d
07/01/26
Offshore Operations
Crew training and connectivity are the true enablers of ...
23/12/25
Recognition
IBP Wins the “Events Oscar” Once Again with ROG.e 2024
11/12/25
FIRJAN
Rio Could Generate 676,000 New Jobs by Stimulating Nine ...
11/12/25
Inland Navigation
Grease-Free Revolution in Latin America’s Workboat Sector
10/12/25
PPSA
Production-Sharing Contracts to Produce 2 Million Barrel...
10/12/25
Recognition
National Public Transparency Program Grants Transpetro I...
10/12/25
Logistics
Transpetro expands its logistics operations with the int...
09/12/25
Auction
PPSA raises around R$ 8.8 billion from the sale of the F...
08/12/25
PPSA
Petrobras announces results of PPSA’s Non-Contracted Are...
08/12/25
Niterói
Niterói concludes second edition of Tomorrow Blue Econom...
02/12/25
Recognition
ABS Consulting Earns Third Elev8 GovCon Honor for Excell...
22/11/25
Award
Aed Energy Wins at the 2025 Energy Storage Awards
22/11/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.