Wind Energy

MME assesses reviews of physical energy guarantees from wind farms based on verified generation

The measure aims to assess the possible impacts arising from Aneel Normative Resolution No. 1,030/2022, which deals with the procedures and criteria for determining and payment of restriction of operation by constrained-off of wind farms, in the calculations of review of physical guarantees of energy of the Plants Wind based on verified generation

T&B Petroleum/Press Office MME
05/10/2022 10:50
MME assesses reviews of physical energy guarantees from wind farms based on verified generation Imagem: Divulgation Visualizações: 1843 (0) (0) (0) (0)

Ministry of Mines and Energy (MME) is evaluating the impacts arising from the Normative Resolution of the National Electric Energy Agency (Aneel) No. 1.030/2022, of July 26, 2022, on the procedures and methodologies for the calculation and annual review of the amounts of physical guarantees of energy from wind farms, based on verified electricity generation, established by MME Ordinance No. 416, of September 1, 2015.

The ordinance defines that, during the review of the physical guarantee based on the electricity generation verified, the MME may exclude from the calculations certain periods of unavailability resulting from systemic restrictions or third-party causes (constrained-off events) duly recognized by Aneel.

As part of this agency's attribution, Aneel Normative Resolution No. 1,030/2022 began to establish the procedures and criteria for determining and paying for operating restrictions due to constrained-off of wind farms. The resolution brings, among other things, the conceptual definition of constrained-off restrictions in wind farms, the classification of events, the scope regarding the modality of dispatch of the plants, the way of calculating the energy not supplied, the way of payment for the constrained-off events as well as payers.

In this way, the amounts of physical energy guarantees of wind farms based on verified electricity generation, which, pursuant to MME Ordinance No. 416/2015, must be published by September 30 of each year, they will exceptionally be published until November 2022, after evaluating the impacts arising from Aneel Normative Resolution No. 1030/2022 in the aforementioned Ordinance.

With this measure, the MME aims to ensure that MME Ordinance No. 416/2015 is in tune with the precepts of the Aneel Resolution, in order to strengthen the business environment, ensuring transparency, predictability and security in the electricity sector.

Physical guarantee of energy from solar and thermal biomass plants with zero CVU based on verified generation

The Ministry of Mines and Energy (MME) published in the Official Gazette (DOU), this Friday (30/09), the ordinances that define the calculation and annual review of the amounts of physical guarantees of energy of thermoelectric plants (UTEs). ) biomass with null Variable Unit Cost (CVU) based on verified electricity generation, in accordance with MME Ordinance No. 564, of October 17, 2014.

The ordinances that define the calculation and annual review of the amounts of physical energy guarantees of photovoltaic solar plants were also published based on verified electricity generation, in accordance with MME Ordinance No. 60, of February 21, 2020.

The publications are in line with the MME's premise of guaranteeing predictability in order to provide transparent signals to the market, strengthening the business environment.

Access the Ordinances that define the Physical Guarantee Amounts for photovoltaic solar plants and biomass thermal plants with zero CVU:

Ordinance No. 1672/SPE/MME, of September 29, 2022.

Ordinance No. 1673/SPE/MME, of September 29, 2022.

Most Read Today
see see
Pre-Salt
Petrobras informs about new oil discovery in the Santos ...
09/05/25
OTC Houston 2025
ABEMI reinforces strategic presence at OTC 2025
09/05/25
OTC Houston 2025
Oil States stands out at OTC Houston 2025 with award-win...
09/05/25
Natural Gas
Petrobras and Portobello establish unprecedented partner...
09/05/25
OTC Houston 2025
Offshore Technology Conference 2025: Waves of Innovation...
09/05/25
OTC Houston 2025
At OTC Houston 2025, Firjan takes part in MoU signing be...
09/05/25
Santos Basin
Karoon completes acquisition of FPSO Cidade de Itajaí
08/05/25
OTC Houston 2025
Brazilian company gains recognition at OTC with pioneeri...
08/05/25
OTC Houston 2025
Technology from Brazilian company Vidya is being used in...
08/05/25
OTC Houston 2025
Tenenge and Enseada are present at OTC 2025 in Houston
08/05/25
Selic Rate
Selic Rate Hike to 14.75% Signals Risks to Industry and ...
08/05/25
OTC Houston 2025
A Sergipe delegation at the fair in the USA met with Pet...
07/05/25
RD&I
ouronova and Equinor develop robots to operate in FPSO tanks
07/05/25
OTC Houston 2025
Petrobras, IBP, Sinaval, and ApexBrasil promote new busi...
07/05/25
Offshore
Decommissioning of Fixed Platforms in Shallow Waters Att...
07/05/25
OTC Houston 2025
Vesper, a leader in industrial EX Fans and Exhausters, m...
07/05/25
Sergipe Oil & Gas 2025
SOG25 to Highlight Sergipe’s Oil and Gas Production Pote...
07/05/25
OTC Houston 2025
EPE destaca oportunidades de investimento no setor energ...
07/05/25
OTC Houston 2025
PPSA announces revision of the volume to be offered in t...
06/05/25
OTC Houston 2025
Fábio Mitidieri attends the opening of the Brazil Pavili...
06/05/25
Logistics
Vast completes 1,000th oil transshipment operation
06/05/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.