Wind Energy

MME assesses reviews of physical energy guarantees from wind farms based on verified generation

The measure aims to assess the possible impacts arising from Aneel Normative Resolution No. 1,030/2022, which deals with the procedures and criteria for determining and payment of restriction of operation by constrained-off of wind farms, in the calculations of review of physical guarantees of energy of the Plants Wind based on verified generation

T&B Petroleum/Press Office MME
05/10/2022 10:50
MME assesses reviews of physical energy guarantees from wind farms based on verified generation Imagem: Divulgation Visualizações: 2866 (0) (0) (0) (0)

Ministry of Mines and Energy (MME) is evaluating the impacts arising from the Normative Resolution of the National Electric Energy Agency (Aneel) No. 1.030/2022, of July 26, 2022, on the procedures and methodologies for the calculation and annual review of the amounts of physical guarantees of energy from wind farms, based on verified electricity generation, established by MME Ordinance No. 416, of September 1, 2015.

The ordinance defines that, during the review of the physical guarantee based on the electricity generation verified, the MME may exclude from the calculations certain periods of unavailability resulting from systemic restrictions or third-party causes (constrained-off events) duly recognized by Aneel.

As part of this agency's attribution, Aneel Normative Resolution No. 1,030/2022 began to establish the procedures and criteria for determining and paying for operating restrictions due to constrained-off of wind farms. The resolution brings, among other things, the conceptual definition of constrained-off restrictions in wind farms, the classification of events, the scope regarding the modality of dispatch of the plants, the way of calculating the energy not supplied, the way of payment for the constrained-off events as well as payers.

In this way, the amounts of physical energy guarantees of wind farms based on verified electricity generation, which, pursuant to MME Ordinance No. 416/2015, must be published by September 30 of each year, they will exceptionally be published until November 2022, after evaluating the impacts arising from Aneel Normative Resolution No. 1030/2022 in the aforementioned Ordinance.

With this measure, the MME aims to ensure that MME Ordinance No. 416/2015 is in tune with the precepts of the Aneel Resolution, in order to strengthen the business environment, ensuring transparency, predictability and security in the electricity sector.

Physical guarantee of energy from solar and thermal biomass plants with zero CVU based on verified generation

The Ministry of Mines and Energy (MME) published in the Official Gazette (DOU), this Friday (30/09), the ordinances that define the calculation and annual review of the amounts of physical guarantees of energy of thermoelectric plants (UTEs). ) biomass with null Variable Unit Cost (CVU) based on verified electricity generation, in accordance with MME Ordinance No. 564, of October 17, 2014.

The ordinances that define the calculation and annual review of the amounts of physical energy guarantees of photovoltaic solar plants were also published based on verified electricity generation, in accordance with MME Ordinance No. 60, of February 21, 2020.

The publications are in line with the MME's premise of guaranteeing predictability in order to provide transparent signals to the market, strengthening the business environment.

Access the Ordinances that define the Physical Guarantee Amounts for photovoltaic solar plants and biomass thermal plants with zero CVU:

Ordinance No. 1672/SPE/MME, of September 29, 2022.

Ordinance No. 1673/SPE/MME, of September 29, 2022.

Most Read Today
see see
Agreement
Wärtsilä Lifecycle agreement renewed to maintain safe, r...
22/10/25
Petrobras
Petrobras receives operating license for deepwater explo...
20/10/25
Equatorial Margin
License Grant for Drilling in the Equatorial Margin Is P...
20/10/25
Equatorial Margin
ABESPetro Statement on the Licensing of the Equatorial M...
20/10/25
Energy Transition
BNDES, Petrobras, and Finep select Valetec to manage the...
20/10/25
Pre-Salt
Petrobras and PPSA sign equalization agreement for Jubar...
20/10/25
WPC Energy Youth Forum
Kuwait to Host 8th WPC Energy Youth Forum in October 2025
20/10/25
Exports
Petrobras signs contract to sell six million barrels of ...
20/10/25
Petrobras
Petrobras puts the Harpia supercomputer into operation
10/10/25
PPSA
PPSA Publishes Notice for the Non-Contracted Areas Auction
10/10/25
ROG.e
IBP Launches the New ROG.e: The World’s Largest Energy F...
10/10/25
Pre-Salt
CNPE Sets Minimum Value of BRL 10.2 Billion for the Unio...
08/10/25
Natural Gas
Petrobras Carries Out First Natural Gas Import from Arge...
08/10/25
Agreement
Seagems renews Wärtsilä Lifecycle Agreement to support t...
07/10/25
Pre-Salt
Petrobras begins contracting for the construction of FPS...
03/10/25
International Company News
Alkhorayef Petroleum Company acquires GRC Technologies, ...
01/10/25
Pre-Salt
FPSO P-78 arrives at the Búzios Field
01/10/25
RD&I
Brazil Has the Capacity to Develop Its Own Technology fo...
01/10/25
Equatorial Margin
Ibama Approves Pre-Operational Assessment (APO) Conducte...
26/09/25
Sustainable Aviation
Embraer Advances SAF Studies Following Acquisition of Bi...
26/09/25
International Company News
ExxonMobil Guyana Expands Capacity With Seventh Offshore...
24/09/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.