Wind Energy

MME assesses reviews of physical energy guarantees from wind farms based on verified generation

The measure aims to assess the possible impacts arising from Aneel Normative Resolution No. 1,030/2022, which deals with the procedures and criteria for determining and payment of restriction of operation by constrained-off of wind farms, in the calculations of review of physical guarantees of energy of the Plants Wind based on verified generation

T&B Petroleum/Press Office MME
05/10/2022 10:50
MME assesses reviews of physical energy guarantees from wind farms based on verified generation Imagem: Divulgation Visualizações: 4244 (0) (0) (0) (0)

Ministry of Mines and Energy (MME) is evaluating the impacts arising from the Normative Resolution of the National Electric Energy Agency (Aneel) No. 1.030/2022, of July 26, 2022, on the procedures and methodologies for the calculation and annual review of the amounts of physical guarantees of energy from wind farms, based on verified electricity generation, established by MME Ordinance No. 416, of September 1, 2015.

The ordinance defines that, during the review of the physical guarantee based on the electricity generation verified, the MME may exclude from the calculations certain periods of unavailability resulting from systemic restrictions or third-party causes (constrained-off events) duly recognized by Aneel.

As part of this agency's attribution, Aneel Normative Resolution No. 1,030/2022 began to establish the procedures and criteria for determining and paying for operating restrictions due to constrained-off of wind farms. The resolution brings, among other things, the conceptual definition of constrained-off restrictions in wind farms, the classification of events, the scope regarding the modality of dispatch of the plants, the way of calculating the energy not supplied, the way of payment for the constrained-off events as well as payers.

In this way, the amounts of physical energy guarantees of wind farms based on verified electricity generation, which, pursuant to MME Ordinance No. 416/2015, must be published by September 30 of each year, they will exceptionally be published until November 2022, after evaluating the impacts arising from Aneel Normative Resolution No. 1030/2022 in the aforementioned Ordinance.

With this measure, the MME aims to ensure that MME Ordinance No. 416/2015 is in tune with the precepts of the Aneel Resolution, in order to strengthen the business environment, ensuring transparency, predictability and security in the electricity sector.

Physical guarantee of energy from solar and thermal biomass plants with zero CVU based on verified generation

The Ministry of Mines and Energy (MME) published in the Official Gazette (DOU), this Friday (30/09), the ordinances that define the calculation and annual review of the amounts of physical guarantees of energy of thermoelectric plants (UTEs). ) biomass with null Variable Unit Cost (CVU) based on verified electricity generation, in accordance with MME Ordinance No. 564, of October 17, 2014.

The ordinances that define the calculation and annual review of the amounts of physical energy guarantees of photovoltaic solar plants were also published based on verified electricity generation, in accordance with MME Ordinance No. 60, of February 21, 2020.

The publications are in line with the MME's premise of guaranteeing predictability in order to provide transparent signals to the market, strengthening the business environment.

Access the Ordinances that define the Physical Guarantee Amounts for photovoltaic solar plants and biomass thermal plants with zero CVU:

Ordinance No. 1672/SPE/MME, of September 29, 2022.

Ordinance No. 1673/SPE/MME, of September 29, 2022.

Most Read Today
see see
Investments
Petrobras and Transpetro announce R$ 2.8 billion in inve...
27/05/26
International Company News
Jumbo orders a new class of versatile heavy lift vessels
27/05/26
BOGE2026
The Largest Oil and Gas Event in the North and Northeast...
25/05/26
BOGE2026
With production on the rise, independent players lead di...
25/05/26
ANP
ANP Workshop Debates Boosting Oil and Gas Exploration in...
25/05/26
BOGE2026
ANP participates in Bahia Oil & Gas Energy 2026, in Salvador
25/05/26
Fenasucro
Future Fuel consolidates Brazilian pioneering role and b...
20/05/26
Partnership
Radix partners with Repsol Sinopec Brasil and PUCRS to c...
20/05/26
Communication
The behind-the-scenes story of communication and adverti...
20/05/26
Result
Total oil production under production-sharing regime hit...
20/05/26
BOGE2026
Global geopolitics’ impact on the local oil sector to be...
19/05/26
International Women's Day
IBP celebrates International Women at Sea Day and reinfo...
19/05/26
Pre-Salt
Mero Field in the Santos Basin Pre-Salt Receives Unprece...
14/05/26
Results
Petrobras reports net profit of R$ 32.7 billion in the f...
14/05/26
Partnership
Halliburton and Shape Digital establish strategic collab...
06/05/26
ROG.e
ROG.e 2026 will bring together CEOs from TotalEnergies, ...
06/05/26
International
At OTC Houston 2026, Firjan SENAI SESI expands its reach...
06/05/26
International
At OTC Houston 2026, Firjan SENAI holds international ed...
04/05/26
Recognition
BRAVA Energia receives top global industry award for Atl...
04/05/26
International
Brazil reaffirms technological leadership at OTC Houston...
04/05/26
Pre-Salt
PPSA closes 2025 with a net profit of R$ 30.1 million
04/05/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.