Wind Energy

MME assesses reviews of physical energy guarantees from wind farms based on verified generation

The measure aims to assess the possible impacts arising from Aneel Normative Resolution No. 1,030/2022, which deals with the procedures and criteria for determining and payment of restriction of operation by constrained-off of wind farms, in the calculations of review of physical guarantees of energy of the Plants Wind based on verified generation

T&B Petroleum/Press Office MME
05/10/2022 10:50
MME assesses reviews of physical energy guarantees from wind farms based on verified generation Imagem: Divulgation Visualizações: 4460 (0) (0) (0) (0)

Ministry of Mines and Energy (MME) is evaluating the impacts arising from the Normative Resolution of the National Electric Energy Agency (Aneel) No. 1.030/2022, of July 26, 2022, on the procedures and methodologies for the calculation and annual review of the amounts of physical guarantees of energy from wind farms, based on verified electricity generation, established by MME Ordinance No. 416, of September 1, 2015.

The ordinance defines that, during the review of the physical guarantee based on the electricity generation verified, the MME may exclude from the calculations certain periods of unavailability resulting from systemic restrictions or third-party causes (constrained-off events) duly recognized by Aneel.

As part of this agency's attribution, Aneel Normative Resolution No. 1,030/2022 began to establish the procedures and criteria for determining and paying for operating restrictions due to constrained-off of wind farms. The resolution brings, among other things, the conceptual definition of constrained-off restrictions in wind farms, the classification of events, the scope regarding the modality of dispatch of the plants, the way of calculating the energy not supplied, the way of payment for the constrained-off events as well as payers.

In this way, the amounts of physical energy guarantees of wind farms based on verified electricity generation, which, pursuant to MME Ordinance No. 416/2015, must be published by September 30 of each year, they will exceptionally be published until November 2022, after evaluating the impacts arising from Aneel Normative Resolution No. 1030/2022 in the aforementioned Ordinance.

With this measure, the MME aims to ensure that MME Ordinance No. 416/2015 is in tune with the precepts of the Aneel Resolution, in order to strengthen the business environment, ensuring transparency, predictability and security in the electricity sector.

Physical guarantee of energy from solar and thermal biomass plants with zero CVU based on verified generation

The Ministry of Mines and Energy (MME) published in the Official Gazette (DOU), this Friday (30/09), the ordinances that define the calculation and annual review of the amounts of physical guarantees of energy of thermoelectric plants (UTEs). ) biomass with null Variable Unit Cost (CVU) based on verified electricity generation, in accordance with MME Ordinance No. 564, of October 17, 2014.

The ordinances that define the calculation and annual review of the amounts of physical energy guarantees of photovoltaic solar plants were also published based on verified electricity generation, in accordance with MME Ordinance No. 60, of February 21, 2020.

The publications are in line with the MME's premise of guaranteeing predictability in order to provide transparent signals to the market, strengthening the business environment.

Access the Ordinances that define the Physical Guarantee Amounts for photovoltaic solar plants and biomass thermal plants with zero CVU:

Ordinance No. 1672/SPE/MME, of September 29, 2022.

Ordinance No. 1673/SPE/MME, of September 29, 2022.

Most Read Today
see see
Campos Basin
Raia Project Reaches New Milestones in One of Brazil’s M...
06/08/26
Permanent Offer
ANP Takes Part in Ceremony Marking the Signing of Contra...
05/08/26
SOG 2026
ABPIP Strengthens Territorial Development Agenda in Serg...
04/08/26
SOG 2026
SOG26 Surpasses the Previous Edition and Reinforces Serg...
03/08/26
People
Shell Brasil Begins a New Leadership Cycle with João San...
03/08/26
Results
ANP Releases Consolidated Data on Oil and Gas Production...
03/08/26
SOG 2026
Banco do Nordeste Has R$ 504 Million for the Energy Sect...
03/08/26
PPSA
TotalEnergies and ExxonMobil Win Atapu and Bacalhau Cargoes
31/07/26
SOG 2026
Sebrae Sergipe Strengthens Small Businesses and Expands ...
31/07/26
PPSA
PPSA Expects to Hold the First Auction of the Union’s Na...
30/07/26
SOG 2026
Sergipe Oil & Gas 2026 Begins with a Focus on Investment...
30/07/26
SOG 2026
Petrobras Director Opens Sergipe Oil & Gas with Analysis...
30/07/26
FIRJAN
Agrega + Indústria brings together entities, companies, ...
29/07/26
SOG 2026
ABPIP brings to Sergipe Oil & Gas a debate on strengthen...
28/07/26
Event
BR Aviation presents its portfolio of customized solutio...
23/07/26
Royalties
Royalties: amounts referring to May production distribut...
23/07/26
Fuels
Fuel and lubricants sector registers 1.8% drop in June, ...
22/07/26
IBP
Studies point to redundancy of the export tax and extra ...
22/07/26
PPSA
7th Spot Auction: PPSA markets cargoes from Atapu and Ba...
20/07/26
Results
Union oil production reaches 244 thousand barrels per da...
17/07/26
State of Ceará
Natural gas arrives in Cariri (CE) and strengthens econo...
16/07/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.