International

Nigeria, Brazil sign MoU on N144bn 700MW power plant to be built in Bayelsa

The Federal Government of Nigeria has signed a N144bn MOU with a Brazilian-based company, Benco Energy Limited to construct a 700 megawatts power plant in the country.

Daily Post Nigeria
01/09/2014 14:41
Visualizações: 1875 (0) (0) (0) (0)

The Federal Government of Nigeria has signed a N144bn Memorandum of Understanding with a Brazilian-based company, Benco Energy Limited to construct a 700 megawatts power plant in the country.

 

The construction of the energy plant, which will be situated in Bayelsa State, is expected to last for a period of three years.

 

The President, Benco Energy Limited, Brazil, Mr. Rodrigo Badew, Friday said the plant will be gas and vapour fired.

 

 

According to him, “It is a 700MW plant although it can reduce to 688MW because this depends on location and environmental conditions. The investment is around $800 to $900m.

 

“Of course all these will be confirmed as soon as we have all the necessary investigations and have them more defined. The time schedule is supposed to be around three and half years for the construction of the project.

 

“The location is Bayelsa because it is a terrain which is close to gas supply, transmission line and a river. So we have all the right infrastructure that we need there and this location is perfect for our investment”.

 

According to Badew, the power plant would basically consist of two turbines that run on gas and two others that will run on vapour.

 

“That is the power module of the plant that we are going to be implementing”, he added.

 

Reacting after the signing of the MoU, the Minister of Power, Prof. Chinedu Nebo, said a couple of years ago, Electrobras of Brazil and the Nigerian government signed an MoU, which was aimed at bringing into Nigeria Electrobras to help the country develop as much as 10,000MW of power

 

He said, “What we are seeing today is the very first takeoff of the implementation of that MoU bringing Benco to work with the Federal Ministry of Power for their plant. We want to assure Benco that the terms of the MoU that we have signed today, we will do our best to implement them”, he said.

 

The minister also noted that Nigeria now generates and distributes an average of 4,500MW of power.

 

He said, “I am very sure that some of you, if not all of you, would have noticed that within the past few weeks, we have averaged about 4,500MW of power delivery and it has been stable.

 

“And that means that most of you are now getting better power supply than you have had in the recent past. Gas is now coming in and we are expecting even a lot more of gas. The transmission facilities are being beefed up to strengthen and make more reliable and stable the national grid to be able to wheel out more power”, he added.

 

Most Read
see see
Fenasucro
Brazil Holds Global Leadership in Renewable Cogeneration...
21/07/25
Results
Revap Achieves Historic Records in H1 with S10 Diesel an...
21/07/25
Solar Energy
Transpetro Inaugurates Solar Plant to Supply the Belém T...
21/07/25
Company News
Strohm completes successful field trials for Petrobras
16/07/25
Natural Gas
Gasmig: 39 Years of Energy, Innovation, and Commitment t...
16/07/25
Sustainability
Foresea earns Social Seal and reports significant result...
11/07/25
Results
Oil and Gas Sector Leads Dividend Distribution in 2024 w...
10/07/25
Natural Gas
Comgás Receives 41 Proposals in Public Call for Natural ...
10/07/25
People
Lucas Mota de Lima Appointed Executive Manager of ABPIP
10/07/25
Biomethane
Presidente Prudente (SP) Begins R$12 Million Biomethane ...
10/07/25
E&P
Hitachi Energy to evaluate electrification of offshore p...
10/07/25
Digitalization
TGS and Equinor Collaborate to Drive Digital Transformat...
10/07/25
People
Julia Cruz Appointed as New Secretary of Green Economy, ...
03/07/25
Sustainability
ABB among TIME’s World’s Most Sustainable Companies
03/07/25
Biofuels
Brazil Can Lead the Decarbonization of International Tra...
03/07/25
Pre-Salt
Oil States signs contracts to supply rigid jumpers for S...
03/07/25
Electric Energy
SMEs: Seven Tips for Joining the Free Energy Market
03/07/25
Energy Transition
CCEE Highlights Leadership in Energy Transition at EVEX ...
03/07/25
Award
WPC Energy Announces Vicki Hollub as Recipient of the Pr...
01/07/25
ANP
Final Results of the PRH-ANP 2025 Announced
01/07/25
Wind Energy
New Provisional Measure Will Not Be Enough to Counter Ha...
30/06/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.