Electricity

ONS announces 2020 Energy Operation Plan, with forecasts until 2024

T&B Petroleum/Press Office ONS
04/08/2020 12:45
ONS announces 2020 Energy Operation Plan, with forecasts until 2024 Imagem: Divulgation Visualizações: 2281 (0) (0) (0) (0)

The National Electricity System Operator released today, July 31, the digital magazine - Executive Summary of the Energy Operation Plan (PEN 2020), horizon 2020-2024. The document presents the assessments of the conditions for supplying the expected electricity market of the National Interconnected System (SIN) for the next five years.

 

In the five-year period, the SIN's energy load is expected to grow by an average of 3.9% on the horizon, reaching 76,612 MWmed in 2024, considering an increase in GDP of 1.2% on average during the study period.

 

In the supply of electricity, there is an increase of approximately 11.5 GW of installed capacity, totaling 175.5 GW at the end of the planning period, with most of the expansion taking place through wind and thermal plants using natural gas. . Hydroelectricity remains the main source of generation, however it loses share in the electric matrix, falling from 62.9% in 2020 to 58.1% in 2024.

 

The storage capacity of the SIN is one of the largest in the world, with about 291 GWmonth. However, without forecasting the construction of new hydroelectric plants with reservoirs, the degree of regularization will continue to decrease in the coming years, increasing the dependence on rainy periods for the level of reservoirs to rise each year.

 

This and other information can be accessed in the digital magazine of PEN 2020. Click on the link and check out:

http://www.ons.org.br/AcervoDigitalDocumentosEPublicacoes/ONS_PEN2020_24_final%20%285%29.pdf

 

About PEN 

With an annual periodicity and bringing analyzes considering a horizon of five years in the electric sector, the Energy Operation Plan (PEN) aims to present the evaluations of the conditions of service of the National Interconnected System (SIN), in the short and medium terms. The document serves as a reference for the Ministry of Mines and Energy, through the Electricity Sector Monitoring Committee (CMSE), and the Energy Research Company (EPE) to define their priorities and the appropriate strategies to meet consumption in the period, with quality and safety. The study is divided into two scenarios: the first, which encompasses the first two years, presents the conjunctural, deterministic and probabilistic analyzes and the second, in a more distant scenario, three years ahead, indicates trends and has a more structural approach, that is, less dependent on recent hydrological trends and current storage levels.

 

Most Read
see see
Visas Agreement
Brazil implements electronic VISIT Visa for Chinese citizens
22/01/26
Biofuels
Sifaeg Highlights New Investment Cycle and the Consolida...
21/01/26
Drilling
Foresea’s Norbe IX Drillship Undergoes Scheduled Mainten...
21/01/26
State of Ceará
Companies from Ceará lead the H2MOVER-Pecém project, sel...
08/01/26
Maritime Support
Ambipar carries out more than 600 port and maritime emer...
07/01/26
Petrobras
Petrobras celebrates 20 years of the Santos Basin Unit
07/01/26
Pelotas Basin
TGS launches maritime safety application for operations ...
07/01/26
Diesel
Petrobras and Vale move forward with fuel supply partnership
07/01/26
ANP
In November, Brazil produced 4.921 million boe/d
07/01/26
Offshore Operations
Crew training and connectivity are the true enablers of ...
23/12/25
Recognition
IBP Wins the “Events Oscar” Once Again with ROG.e 2024
11/12/25
FIRJAN
Rio Could Generate 676,000 New Jobs by Stimulating Nine ...
11/12/25
Inland Navigation
Grease-Free Revolution in Latin America’s Workboat Sector
10/12/25
PPSA
Production-Sharing Contracts to Produce 2 Million Barrel...
10/12/25
Recognition
National Public Transparency Program Grants Transpetro I...
10/12/25
Logistics
Transpetro expands its logistics operations with the int...
09/12/25
Auction
PPSA raises around R$ 8.8 billion from the sale of the F...
08/12/25
PPSA
Petrobras announces results of PPSA’s Non-Contracted Are...
08/12/25
Niterói
Niterói concludes second edition of Tomorrow Blue Econom...
02/12/25
Recognition
ABS Consulting Earns Third Elev8 GovCon Honor for Excell...
22/11/25
Award
Aed Energy Wins at the 2025 Energy Storage Awards
22/11/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.