FPSO

P-66 hull on its way for integration in Angra dos Reis

On Monday, December 8, Petrobras began transporting the hull of P-66, the first platform in a series of eight “replicant” FPSOs being constructed to meet oil production demands in Brazil.

Petrobras Agency
10/12/2014 17:16
P-66 hull on its way for integration in Angra dos Reis Imagem: Petrobras Agency Visualizações: 2076 (0) (0) (0) (0)

On Monday, December 8, Petrobras began transporting the hull of P-66, the first platform in a series of eight “replicant” FPSOs (floating production, storage and offloading units) being constructed to meet oil production demands in Brazil. This is the first FPSO hull completely built in the country.

 

Having left the Rio Grande 1 shipyard, located in the city of Rio Grande, state of Rio Grande do Sul, the first replicant hull is now on its way to the Brasfels shipyard, in Angra dos Reis, Rio de Janeiro, where it is expected to arrive on December 18. At Brasfels, the modules will be installed on the hull, and equipment and systems will be integrated, interconnected and tested.

 

P-66 will be deployed in the Lula field, on the Lula South module, in the pre-salt layer of Santos Basin, operated by Petrobras (65%) in partnership with BG E&P Brasil (25%) and Petrogal Brasil (10%).

 

Details of P-66 hull:

Width of hull: 54 m

Depth (from centerline to full height of hull): 31.5 m

Maximum draft: 23.1 m

Total weight: 353,500 metric tons

Weight of steel: 42,800 metric tons

 

Details of complete FPSO:

To be moored at a water depth of 2,200 m

Total length: 288 m

living quarters: 110 people

Oil storage: 1,670,000 barrels

Power generation: four 25 MW turbo-generators

Processing capacity: 150,000 barrels per day of oil, and 6 million m³ per day of natural gas (maximum)

Most Read Today
see see
Memorandum of Understanding
Wärtsilä and Abu Dhabi Maritime Academy explore collabor...
12/02/26
Pre-Salt
Petrobras platform P-79 arrives at the Búzios field
12/02/26
Results
Petrobras’ oil and gas production rises 11% and reaches ...
12/02/26
Permanent Offer
Comprehensive and Unprecedented Joint Statement Speeds U...
12/02/26
PPSA
MME and MMA Clear Strategic Pre-Salt Areas, Enabling the...
12/02/26
Biomethane
Biomethane in Focus with Debate on Credit, Regulation, a...
12/02/26
People
Mario Ferreira is the New Commercial Manager at Wiz Corp...
11/02/26
Visas Agreement
Brazil implements electronic VISIT Visa for Chinese citizens
22/01/26
Biofuels
Sifaeg Highlights New Investment Cycle and the Consolida...
21/01/26
Drilling
Foresea’s Norbe IX Drillship Undergoes Scheduled Mainten...
21/01/26
State of Ceará
Companies from Ceará lead the H2MOVER-Pecém project, sel...
08/01/26
Maritime Support
Ambipar carries out more than 600 port and maritime emer...
07/01/26
Petrobras
Petrobras celebrates 20 years of the Santos Basin Unit
07/01/26
Pelotas Basin
TGS launches maritime safety application for operations ...
07/01/26
Diesel
Petrobras and Vale move forward with fuel supply partnership
07/01/26
ANP
In November, Brazil produced 4.921 million boe/d
07/01/26
Offshore Operations
Crew training and connectivity are the true enablers of ...
23/12/25
Recognition
IBP Wins the “Events Oscar” Once Again with ROG.e 2024
11/12/25
FIRJAN
Rio Could Generate 676,000 New Jobs by Stimulating Nine ...
11/12/25
Inland Navigation
Grease-Free Revolution in Latin America’s Workboat Sector
10/12/25
PPSA
Production-Sharing Contracts to Produce 2 Million Barrel...
10/12/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.