FPSO

P-66 hull on its way for integration in Angra dos Reis

On Monday, December 8, Petrobras began transporting the hull of P-66, the first platform in a series of eight “replicant” FPSOs being constructed to meet oil production demands in Brazil.

Petrobras Agency
10/12/2014 17:16
P-66 hull on its way for integration in Angra dos Reis Imagem: Petrobras Agency Visualizações: 1430 (0) (0) (0) (0)

On Monday, December 8, Petrobras began transporting the hull of P-66, the first platform in a series of eight “replicant” FPSOs (floating production, storage and offloading units) being constructed to meet oil production demands in Brazil. This is the first FPSO hull completely built in the country.

 

Having left the Rio Grande 1 shipyard, located in the city of Rio Grande, state of Rio Grande do Sul, the first replicant hull is now on its way to the Brasfels shipyard, in Angra dos Reis, Rio de Janeiro, where it is expected to arrive on December 18. At Brasfels, the modules will be installed on the hull, and equipment and systems will be integrated, interconnected and tested.

 

P-66 will be deployed in the Lula field, on the Lula South module, in the pre-salt layer of Santos Basin, operated by Petrobras (65%) in partnership with BG E&P Brasil (25%) and Petrogal Brasil (10%).

 

Details of P-66 hull:

Width of hull: 54 m

Depth (from centerline to full height of hull): 31.5 m

Maximum draft: 23.1 m

Total weight: 353,500 metric tons

Weight of steel: 42,800 metric tons

 

Details of complete FPSO:

To be moored at a water depth of 2,200 m

Total length: 288 m

living quarters: 110 people

Oil storage: 1,670,000 barrels

Power generation: four 25 MW turbo-generators

Processing capacity: 150,000 barrels per day of oil, and 6 million m³ per day of natural gas (maximum)

Most Read Today
see see
FIRJAN
Together with CNI, Firjan launches business mission in t...
03/09/25
Gulf of America
C-Innovation completes successful decommissioning projec...
28/08/25
Equatorial Margin
Rig chartered by Petrobras arrives in Amapá to take part...
19/08/25
FIRJAN
Rio gains Firjan SENAI Metalworking Reference Center
19/08/25
RD&I
CEPETRO develops for Petrobras a tool that integrates mu...
19/08/25
Pre-Salt
Búzios Field surpasses the record level of 900 thousand ...
19/08/25
Logistics
PetroReconcavo and Dislub build an unprecedented oil out...
19/08/25
IBP
NAVE Program advances with 21 energy sector startups
19/08/25
International Event
The 3rd Annual World ReAM Show Returns to Dubai, Bridgin...
13/08/25
Sustainability
ATPI Expands Global Sustainability Portfolio with Brazil...
06/08/25
Results
ANP releases consolidated 2024 data in English for the r...
29/07/25
Sergipe Oil & Gas 2025
SOG25 Surpasses Expectations in Its 4th Edition and Sets...
28/07/25
Sergipe
Government of Sergipe and Petrobras Strengthen Partnersh...
28/07/25
Sergipe Oil & Gas 2025
Sergipe Oil & Gas 2025 Highlights the Competitiveness of...
25/07/25
Sergipe Oil & Gas 2025
Márcio Félix, President of ABPIP, Sees a Promising Futur...
25/07/25
Sergipe Oil & Gas 2025
Sergas Highlights Progress and Expansion of Natural Gas ...
25/07/25
Permanent Offer
ANP Approves Studies for the Calcita Project, Potentiall...
25/07/25
Sergipe Oil & Gas 2025
Natural Gas Market Takes Center Stage on Second Day of S...
25/07/25
People
New Interim Director to Take Office on 7/25 at ANP’s Dir...
24/07/25
Sergipe Oil & Gas 2025
Sebrae Participates in the Opening of Sergipe Oil & Gas 2025
24/07/25
Royalties
Royalties: May Production Revenues for Concession and Tr...
24/07/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2