Pre-Salt

P-66 leaves shipyard for Lula field

The floating platform will operate in the Santos Basin pre-salt and it will be the seventh unit deployed in Lula field

Petrobras Agency
07/02/2017 12:49
P-66 leaves shipyard for Lula field Imagem: Petrobras Agency/Gabriel Ribeiro Visualizações: 3896 (0) (0) (0) (0)

On Saturday (February 4), the floating production, storage and offloading vessel (FPSO) P-66 left the Brasfels shipyard in Angra dos Reis, Rio de Janeiro. It is now heading to the Lula Sul module in the Lula field, Santos Basin pre-salt, where it is expected to arrive in the next few days. The production system will come online after the vessel has been moored and the first production well has been connected.

 

P-66 is the Lula Consortium’s first FPSO to be deployed in the Santos Basin pre-salt. It was assembled at the Brasfels shipyard in Angra dos Reis, where the equipment and systems were also tested.

 

The FPSO will separate the oil from the gas and water during the production process, storing it in tanks, and finally transferring it into oil tankers, which will then transport it. P-66 will be connected to 10 production wells and 8 injector wells, and it will be able to process up to 150,000 barrels of oil per day and 6 million cubic meters of natural gas per day.

 

Lula field is located within the BM-S-11 concession area, operated by Petrobras (65%) in partnership with BG E&P Brasil (25%), a subsidiary of Royal Dutch Shell plc (25%), and Petrogal Brasil (10%).

 

P-66 details:


Oil processing: 150,000 barrels per day;

Gas treatment and compression: 6 million m³ per day

Injection water treatment: 181,100 barrels per day

Oil storage capacity: 1.67 million barrels

Mooring water depth: 2,200 meters

Total length: 288 meters

Width: 54 meters

Height: 31.5 meters

Most Read Today
see see
International
5th Congress of the Federation of Portuguese-Speaking La...
05/11/26
FIRJAN
Public-private partnership seen as vital to petrochemica...
05/11/26
Drilling
Norbe VIII, operated by Foresea, is ready to operate in ...
05/11/26
Refineries
TEM Boaventura Consortium completes lift of first reacto...
04/11/26
FIRJAN
Greater natural gas availability strengthens Rio de Jane...
03/11/26
Result
Oil and natural gas production hits a new record in Sept...
03/11/26
Pre-Salt
P-78 Platform (Búzios 6) reaches peak production of 180,...
03/11/26
Auction
Neoenergia wins Lots 1 and 7 in ANEEL Transmission Auction
30/10/26
WPC Energy
WPC Energy welcomes the Republic of Chad into membership
28/10/26
International
PortXL presents its 2026 cohort of 11 maritime startups ...
30/09/26
ADIPEC
ADIPEC 2026 set to welcome record Asian participation as...
29/09/26
ANP
Royalties: amounts referring to July production were dis...
29/09/26
25th WPC
Riyadh Takes Center Stage as Global Energy Heavyweights ...
28/09/26
ROG.e 2026
Petrobras president advocates active exploration and exp...
25/09/26
ROG.e 2026
Nikki Martin, president and CEO of EnerGeo Alliance, spo...
25/09/26
ROG.e 2026
Oil States Highlights Integration Between Engineering, M...
25/09/26
ROG.e 2026
Port of Açu and OceanPact sign agreement for expansion o...
25/09/26
ROG.e 2026
Lumina’s Role and the Impact of ROG.e 2026 on the Energy...
25/09/26
ROG.e 2026
Leaders Identify Brazil as a Pillar of Energy Security a...
24/09/26
ROG.e 2026
Firjan SENAI and Sebrae Rio Connect Small Businesses wit...
24/09/26
ROG.e 2026
PPSA Study Identifies Best Practices to Support Investme...
24/09/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.