Pre-Salt

P-66 leaves shipyard for Lula field

The floating platform will operate in the Santos Basin pre-salt and it will be the seventh unit deployed in Lula field

Petrobras Agency
07/02/2017 12:49
P-66 leaves shipyard for Lula field Imagem: Petrobras Agency/Gabriel Ribeiro Visualizações: 2083 (0) (0) (0) (0)

On Saturday (February 4), the floating production, storage and offloading vessel (FPSO) P-66 left the Brasfels shipyard in Angra dos Reis, Rio de Janeiro. It is now heading to the Lula Sul module in the Lula field, Santos Basin pre-salt, where it is expected to arrive in the next few days. The production system will come online after the vessel has been moored and the first production well has been connected.

 

P-66 is the Lula Consortium’s first FPSO to be deployed in the Santos Basin pre-salt. It was assembled at the Brasfels shipyard in Angra dos Reis, where the equipment and systems were also tested.

 

The FPSO will separate the oil from the gas and water during the production process, storing it in tanks, and finally transferring it into oil tankers, which will then transport it. P-66 will be connected to 10 production wells and 8 injector wells, and it will be able to process up to 150,000 barrels of oil per day and 6 million cubic meters of natural gas per day.

 

Lula field is located within the BM-S-11 concession area, operated by Petrobras (65%) in partnership with BG E&P Brasil (25%), a subsidiary of Royal Dutch Shell plc (25%), and Petrogal Brasil (10%).

 

P-66 details:


Oil processing: 150,000 barrels per day;

Gas treatment and compression: 6 million m³ per day

Injection water treatment: 181,100 barrels per day

Oil storage capacity: 1.67 million barrels

Mooring water depth: 2,200 meters

Total length: 288 meters

Width: 54 meters

Height: 31.5 meters

Most Read Today
see see
Petrobras
Petrobras produced 3.14 million barrels of oil equivalen...
27/10/25
FIRJAN
By 2035+, Rio de Janeiro State’s Energy Potential Could ...
23/10/25
Pre-Salt
PPSA to auction in December the first share of governmen...
23/10/25
Auction
Petrobras wins auction and leases RDJ07 terminal at the ...
23/10/25
Permanent Offer
Equinor acquires two new blocks in the Campos Basin duri...
23/10/25
OTC Brasil 2025
OTC Brasil 2025 Kicks Off in One Week with a Packed Prog...
22/10/25
Agreement
Wärtsilä Lifecycle agreement renewed to maintain safe, r...
22/10/25
Petrobras
Petrobras receives operating license for deepwater explo...
20/10/25
Equatorial Margin
License Grant for Drilling in the Equatorial Margin Is P...
20/10/25
Equatorial Margin
ABESPetro Statement on the Licensing of the Equatorial M...
20/10/25
Energy Transition
BNDES, Petrobras, and Finep select Valetec to manage the...
20/10/25
Pre-Salt
Petrobras and PPSA sign equalization agreement for Jubar...
20/10/25
WPC Energy Youth Forum
Kuwait to Host 8th WPC Energy Youth Forum in October 2025
20/10/25
Exports
Petrobras signs contract to sell six million barrels of ...
20/10/25
Petrobras
Petrobras puts the Harpia supercomputer into operation
10/10/25
PPSA
PPSA Publishes Notice for the Non-Contracted Areas Auction
10/10/25
ROG.e
IBP Launches the New ROG.e: The World’s Largest Energy F...
10/10/25
Pre-Salt
CNPE Sets Minimum Value of BRL 10.2 Billion for the Unio...
08/10/25
Natural Gas
Petrobras Carries Out First Natural Gas Import from Arge...
08/10/25
Agreement
Seagems renews Wärtsilä Lifecycle Agreement to support t...
07/10/25
Pre-Salt
Petrobras begins contracting for the construction of FPS...
03/10/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.