Production

Peregrino marks 100 million barrels produced

Statoil
04/08/2015 19:58
Peregrino marks 100 million barrels produced Imagem: Øyvind Hagen - Statoil ASA Visualizações: 2990 (0) (0) (0) (0)

The Peregrino field includes two fixed drilling platforms (WHP A and WHP B), and the floating production and storage unit FPSO Peregrino.

 

After just four years in production, the Peregrino field in the Campos basin offshore Brazil has passed a significant milestone, with 100 million barrels of oil produced since April 2011.

The field, jointly owned by Statoil and Chinese Sinochem, achieved the milestone on August 2.

 

"We are pleased to have reached a major milestone in our Peregrino operations,” says Pål Eitrheim, country manager of Statoil Brazil.

 

“Peregrino demonstrates the power of possible, and we are proud to operate a project that is both exciting and challenging. These results reflect the professionalism of our people, and the application of technology developed by Statoil, in Brazil and elsewhere. We are constantly learning and we look forward to reaching new milestones as we continue to develop this large field”, he says.

 

According to a report published by the Brazilian National Agency of Petroleum, Natural Gas and Biofuels (ANP) in March 2015, Peregrino is Brazil's eighth largest field, and has the second heaviest oil ever produced in Brazil.

 

It is also the largest field operated by Statoil outside Norway and accounts for about 12% of its international production (around 720 thousand barrels per day). The recoverable reserves are estimated between 300-600 million barrels.

 

The operation includes two fixed drilling platforms (WHP A and WHP B), and a floating production and storage unit (FPSO Peregrino), with a production capacity of 100,000 barrels per day. Statoil holds a 60% stake and is the operator of the field, while Sinochem holds the remaining 40%.

 

With an excellent track record, Peregrino has achieved all production, efficiency, cost and safety targets in 2014.

 

In January this year, the development plan of Peregrino Phase II was submitted to ANP. With total estimated investments of USD 3.5 billion, the project involves a new drilling platform (WHP C) and will add about 250 million barrels in recoverable reserves to the Peregrino field.

 

Phase II of the project will enable the extension of the economic life of Peregrino and is an important and strategic part of Statoil’s ambition to consolidate a strong position in Brazil.

Most Read Today
see see
Fenasucro
Future Fuel consolidates Brazilian pioneering role and b...
20/05/26
Partnership
Radix partners with Repsol Sinopec Brasil and PUCRS to c...
20/05/26
Communication
The behind-the-scenes story of communication and adverti...
20/05/26
Result
Total oil production under production-sharing regime hit...
20/05/26
BOGE2026
Global geopolitics’ impact on the local oil sector to be...
19/05/26
International Women's Day
IBP celebrates International Women at Sea Day and reinfo...
19/05/26
Pre-Salt
Mero Field in the Santos Basin Pre-Salt Receives Unprece...
14/05/26
Results
Petrobras reports net profit of R$ 32.7 billion in the f...
14/05/26
Partnership
Halliburton and Shape Digital establish strategic collab...
06/05/26
ROG.e
ROG.e 2026 will bring together CEOs from TotalEnergies, ...
06/05/26
International
At OTC Houston 2026, Firjan SENAI SESI expands its reach...
06/05/26
International
At OTC Houston 2026, Firjan SENAI holds international ed...
04/05/26
Recognition
BRAVA Energia receives top global industry award for Atl...
04/05/26
International
Brazil reaffirms technological leadership at OTC Houston...
04/05/26
Pre-Salt
PPSA closes 2025 with a net profit of R$ 30.1 million
04/05/26
Results
With 5.531 million boe/d, Brazil continues with record o...
04/05/26
International
Brazil reaffirms technological leadership at OTC Houston...
02/05/26
Environment
Brazil appears among world's largest methane emitters in...
30/04/26
PPSA
Federal Government receives R$ 917.32 million from Tupi ...
07/04/26
Study
Brazil increases dependence on thermal power, but lack o...
07/04/26
Permanent Offer
Permanent Production Sharing Offer (OPP): ANP publishes ...
07/04/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.