Santos Basin

Petrobras begins commercial production at Santos Basin pre-salt Iracema Sul area

Petrobras announces that platform Cidade de Mangaratiba went into operation today (10/14)

Petrobras Agency
15/10/2014 15:04
Petrobras begins commercial production at Santos Basin pre-salt Iracema Sul area Imagem: Petrobras Agency Visualizações: 2184 (0) (0) (0) (0)

Petrobras announces that platform Cidade de Mangaratiba went into operation today (10/14) at the Santos Basin pre-salt area of Iracema Sul, in Lula field, located on block BM-S-11. The start-up of the new platform was anticipated since the original expected start-up, as provided for in the 2014-2018 Business & Management Plan, had been scheduled for November 6th, 2014.


The platform Cidade de Mangaratiba is an FPSO (floating production storage and offloading) type unit and it was contracted in September 2011 from the Schahin-Modec consortium. The hull of the FPSO was converted at the Cosco shipyard, in Dalian, China and the integration of the process plant modules took place at the BrasFels shipyard in Angra do Reis, Rio de Janeiro.


The platform, which is set up at a depth of 2,200 meters, some 240km off the coast, will have the capacity to process up to 150 thousand barrels of oil and 8 million m3 of gas per day, in addition to storing 1.6 million barrels of oil. Well 4-RJS-647, the first to be connected to the FPSO, has a production potential of over 30 thousand barrels per day. The oil produced at the Iracema Sul area is of high quality and of medium density (30º API) and will be transported by shuttle tankers.


The Santos Basin Integrated Gas Distribution Network will distribute the portion of the gas that is not used for reinjection in the field. FPSO Cidade de Mangaratiba will be connected to eight production wells and eight injection ones over the coming months. Production is expected to peak in the first half of 2016.


The estimated local content for the development of the Iracema Sul area is 42%, higher than the 30% minimum local content specified by Brazil’s National Petroleum, Natural Gas and Biofuels Agency (ANP) for block BM-S-11. The construction and integration of the platform’s modules in Brazil involved four construction sites in Rio de Janeiro – distributed across Itaguaí, Ilha do Fundão, Niterói, Angra dos Reis – as well as Bahia.


Concession BM-S-11 is operated by Petrobras (65%), in partnership with BG E&P Brasil Ltda (25%) and Petrogal Brasil S.A. (10%).


Technical specifications:

 

Production capacity: 150 thousand barrels per day

Natural gas treatment capacity: 8 million m3 per day

Storage capacity: 1.6 million barrels of oil

Accommodation: 150 people

Operating water depth: 2,200 meters

 

 

Most Read Today
see see
OTC Brasil 2025
Experts warn regulatory instability threatens US$100 bil...
28/10/25
International Company News
Sercel Awarded Major Contract by ONGC to Supply Sercel 5...
28/10/25
Record
Petrobras announces production record of FPSO Almirante ...
28/10/25
OTC Brasil 2025
Event brings together global offshore industry leaders a...
28/10/25
OTC Brasil 2025
Petrobras participates in OTC Brasil 2025, in Rio de Janeiro
28/10/25
Petrobras
Petrobras produced 3.14 million barrels of oil equivalen...
27/10/25
FIRJAN
By 2035+, Rio de Janeiro State’s Energy Potential Could ...
23/10/25
Pre-Salt
PPSA to auction in December the first share of governmen...
23/10/25
Auction
Petrobras wins auction and leases RDJ07 terminal at the ...
23/10/25
Permanent Offer
Equinor acquires two new blocks in the Campos Basin duri...
23/10/25
OTC Brasil 2025
OTC Brasil 2025 Kicks Off in One Week with a Packed Prog...
22/10/25
Agreement
Wärtsilä Lifecycle agreement renewed to maintain safe, r...
22/10/25
Petrobras
Petrobras receives operating license for deepwater explo...
20/10/25
Equatorial Margin
License Grant for Drilling in the Equatorial Margin Is P...
20/10/25
Equatorial Margin
ABESPetro Statement on the Licensing of the Equatorial M...
20/10/25
Energy Transition
BNDES, Petrobras, and Finep select Valetec to manage the...
20/10/25
Pre-Salt
Petrobras and PPSA sign equalization agreement for Jubar...
20/10/25
WPC Energy Youth Forum
Kuwait to Host 8th WPC Energy Youth Forum in October 2025
20/10/25
Exports
Petrobras signs contract to sell six million barrels of ...
20/10/25
Petrobras
Petrobras puts the Harpia supercomputer into operation
10/10/25
PPSA
PPSA Publishes Notice for the Non-Contracted Areas Auction
10/10/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.