Divestment Plan

Petrobras on LNG Regasification Terminal leasing

Petrobras Agency
25/06/2021 13:52
Visualizações: 1030 (0) (0) (0) (0)

Petrobras informs that on 06/14/2021, a public session was held to open the commercial proposals of the bidders interested in leasing the Bahia LNG Regasification Terminal (TR-BA) and associated facilities, with the company Excelerate Energy Comercializadora de Gás Natural Ltda. (Excelerate) being present.

 

Excelerate presented all the necessary reports and declarations for the acceptance of the envelope containing its commercial proposal in the terms of the Call for Tender. The Bidding Commission verified that this was a proposal linked to the inclusion of a new termination condition, even though the company had signed the Unified Declaration, expressly stating acceptance of all the tender protocol’s terms. Given the opportunity to remove the additional condition, the company maintained its position.

 

In this sense, the proposal presented by Excelerate was disqualified during the verification stage of its effectiveness, based on items 3.2.5.5 and 5.1 of the Call for Tender.

 

In accordance with item 7.1 of the Call for Tender, Excelerate has 5 working days to present an administrative appeal, the deadline for which is June 28, 2021.

 

The leasing is aligned with the company's strategy of improving its capital allocation and building a favorable environment for new investors to enter the natural gas sector.

 

About the terminal 

The TR-BA consists of an island type pier with all the necessary facilities for berthing and mooring a FSRU (Floating Storage and Regasification Unit) ship directly to the pier and a supply ship on the FSRU's port side. The transfer of LNG is directly between the FSRU and the supply vessel in a side by side configuration. The maximum regasification flow rate of the TR-BA is 20 million m³/d (@ 1 atm and 20°C). FSRU is not part of the TR-BA leasing process.

 

The pipeline integrating the terminal is 45 km long and 28 inches in diameter, connecting TR-BA to two delivery points, the Pressure Reduction Station of São Francisco do Conde and the Flow Control Station of São Sebastião do Passé.

 

Also included in the scope of the transaction are the equipment for generation and supply of electricity located at the Madre de Deus Waterway Terminal (TEMADRE), part of the TR-BA.

Most Read Today
see see
Carbon Capture
Impact Hub and Tencent launch program offering up to 1 m...
30/04/25
International
Petrobras presents investment opportunities in the naval...
30/04/25
Results
Petrobras production grows 5.4% and reaches 2.8 million ...
30/04/25
Carbon Reduction
Report: Baker Hughes Achieves Nearly 40% Reduction in Op...
29/04/25
Natural Gas
Comgás launches public call for natural gas acquisition
29/04/25
Royalties
Values related to February production under concession a...
29/04/25
Biogas
TBG develops Biogas Hub project to boost biofuel integra...
29/04/25
OTC Houston 2025
OTC 2025 Announces Emerging Leaders Class
25/04/25
OTC Houston 2025
Renown Deep-Sea Diver Chris Lemons to Speak at OTC 2025
15/04/25
SPE
Sustainability in the Oil and Gas Industry
15/04/25
Energy Efficiency
Foresea Develops Technologies to Reduce Emissions and In...
14/04/25
Permanent Offer
ANP Announces Sectors to Be Offered in the 5th Cycle of ...
14/04/25
Vitória Petroshow 2025
Vitória Petroshow 2025 establishes itself as the largest...
14/04/25
Opportunity
IBP President advocates for professional training to fil...
10/04/25
Vitória Petroshow 2025
Anchors' Night celebrates the success of Vitória Petrosh...
10/04/25
Bahia Oil & Gas Energy 2025
Bahia Oil & Gas Energy 2025 is now open for registration
10/04/25
Vitória Petroshow 2025
Vitória PetroShow Generates Nearly R$ 1 Billion in Busin...
09/04/25
Vitória Petroshow 2025
First Day of Vitória PetroShow 2025: Petrobras Announces...
09/04/25
Business
SBM Offshore signs US$400 million Sale and Leaseback agr...
09/04/25
Vitória Petroshow 2025
Vitória PetroShow 2025 reinforces Espírito Santo’s leade...
08/04/25
Vitória Petroshow 2025
Exploration of New Blocks Could Triple Reserves and Doub...
08/04/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.