Divestment Plan

Petrobras on LNG Regasification Terminal leasing

Petrobras Agency
25/06/2021 13:52
Visualizações: 2785 (0) (0) (0) (0)

Petrobras informs that on 06/14/2021, a public session was held to open the commercial proposals of the bidders interested in leasing the Bahia LNG Regasification Terminal (TR-BA) and associated facilities, with the company Excelerate Energy Comercializadora de Gás Natural Ltda. (Excelerate) being present.

 

Excelerate presented all the necessary reports and declarations for the acceptance of the envelope containing its commercial proposal in the terms of the Call for Tender. The Bidding Commission verified that this was a proposal linked to the inclusion of a new termination condition, even though the company had signed the Unified Declaration, expressly stating acceptance of all the tender protocol’s terms. Given the opportunity to remove the additional condition, the company maintained its position.

 

In this sense, the proposal presented by Excelerate was disqualified during the verification stage of its effectiveness, based on items 3.2.5.5 and 5.1 of the Call for Tender.

 

In accordance with item 7.1 of the Call for Tender, Excelerate has 5 working days to present an administrative appeal, the deadline for which is June 28, 2021.

 

The leasing is aligned with the company's strategy of improving its capital allocation and building a favorable environment for new investors to enter the natural gas sector.

 

About the terminal 

The TR-BA consists of an island type pier with all the necessary facilities for berthing and mooring a FSRU (Floating Storage and Regasification Unit) ship directly to the pier and a supply ship on the FSRU's port side. The transfer of LNG is directly between the FSRU and the supply vessel in a side by side configuration. The maximum regasification flow rate of the TR-BA is 20 million m³/d (@ 1 atm and 20°C). FSRU is not part of the TR-BA leasing process.

 

The pipeline integrating the terminal is 45 km long and 28 inches in diameter, connecting TR-BA to two delivery points, the Pressure Reduction Station of São Francisco do Conde and the Flow Control Station of São Sebastião do Passé.

 

Also included in the scope of the transaction are the equipment for generation and supply of electricity located at the Madre de Deus Waterway Terminal (TEMADRE), part of the TR-BA.

Most Read
see see
International Company News
OES Group Returns to Private Ownership Following Managem...
31/08/26
Pre-Salt
Petrobras platforms P-80 and P-82, which will operate in...
31/08/26
Royalties
Values related to June production were distributed to st...
27/08/26
People
bp appoints Felipe Arbelaez head of country for Brazil
27/08/26
ROG.e 2026
ROG.e 2026 brings global leaders together to discuss the...
26/08/26
Pre-Salt
Búzios field sets monthly and daily natural gas export r...
26/08/26
Navalshore
Firjan SENAI presents the Supplier Opportunities Network...
17/08/26
Equatorial Margin
Morpho Well: Petrobras discovers hydrocarbons in ultra-d...
15/08/26
Power Generation
Campo Grande hosts four days of debates on bioenergy and...
12/08/26
International
KPMG: fossil fuel consumption falls, despite oil's signi...
12/08/26
Fenasucro
Fenasucro & Agrocana opening highlights Brazil's leaders...
12/08/26
Event
IBP and BIP bring together leaders to discuss technology...
11/08/26
Event
Asset Management gains prominence in corporate strategy;...
11/08/26
Macaé
Foresea takes part in WSOP 2026 and reinforces that safe...
11/08/26
Sergipe-Alagoas Basin
Siemens Energy advances offshore expansion in Brazil wit...
10/08/26
Campos Basin
Raia Project Reaches New Milestones in One of Brazil’s M...
06/08/26
Permanent Offer
ANP Takes Part in Ceremony Marking the Signing of Contra...
05/08/26
SOG 2026
ABPIP Strengthens Territorial Development Agenda in Serg...
04/08/26
SOG 2026
SOG26 Surpasses the Previous Edition and Reinforces Serg...
03/08/26
People
Shell Brasil Begins a New Leadership Cycle with João San...
03/08/26
Results
ANP Releases Consolidated Data on Oil and Gas Production...
03/08/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.