Divestment Plan

Petrobras on LNG Regasification Terminal leasing

Petrobras Agency
25/06/2021 13:52
Visualizações: 1280 (0) (0) (0) (0)

Petrobras informs that on 06/14/2021, a public session was held to open the commercial proposals of the bidders interested in leasing the Bahia LNG Regasification Terminal (TR-BA) and associated facilities, with the company Excelerate Energy Comercializadora de Gás Natural Ltda. (Excelerate) being present.

 

Excelerate presented all the necessary reports and declarations for the acceptance of the envelope containing its commercial proposal in the terms of the Call for Tender. The Bidding Commission verified that this was a proposal linked to the inclusion of a new termination condition, even though the company had signed the Unified Declaration, expressly stating acceptance of all the tender protocol’s terms. Given the opportunity to remove the additional condition, the company maintained its position.

 

In this sense, the proposal presented by Excelerate was disqualified during the verification stage of its effectiveness, based on items 3.2.5.5 and 5.1 of the Call for Tender.

 

In accordance with item 7.1 of the Call for Tender, Excelerate has 5 working days to present an administrative appeal, the deadline for which is June 28, 2021.

 

The leasing is aligned with the company's strategy of improving its capital allocation and building a favorable environment for new investors to enter the natural gas sector.

 

About the terminal 

The TR-BA consists of an island type pier with all the necessary facilities for berthing and mooring a FSRU (Floating Storage and Regasification Unit) ship directly to the pier and a supply ship on the FSRU's port side. The transfer of LNG is directly between the FSRU and the supply vessel in a side by side configuration. The maximum regasification flow rate of the TR-BA is 20 million m³/d (@ 1 atm and 20°C). FSRU is not part of the TR-BA leasing process.

 

The pipeline integrating the terminal is 45 km long and 28 inches in diameter, connecting TR-BA to two delivery points, the Pressure Reduction Station of São Francisco do Conde and the Flow Control Station of São Sebastião do Passé.

 

Also included in the scope of the transaction are the equipment for generation and supply of electricity located at the Madre de Deus Waterway Terminal (TEMADRE), part of the TR-BA.

Most Read
see see
Sergipe Oil & Gas 2025
Sergipe Oil & Gas 2025 Launched with Focus on Innovation...
04/06/25
Marginal Fields
Fiscal Measures with Disproportionate Impact on Independ...
04/06/25
Investments
Transpetro launches tender to enter barge operation segment
30/05/25
Bahia Oil & Gas Energy 2025
Bahia Oil & Gas Energy surpasses 13,000 registrants and ...
30/05/25
Bahia Oil & Gas Energy 2025
Marquise Ambiental presents industrial waste solutions a...
30/05/25
Bahia Oil & Gas Energy 2025
Bahia Oil & Gas Surpasses Expectations and Strengthens I...
29/05/25
Bahia Oil & Gas Energy 2025
Petroborn Plans to Invest US$ 35 Million in Northeastern...
29/05/25
Bahia Oil & Gas Energy 2025
GBS Storage Discusses Unprecedented Natural Gas Storage ...
29/05/25
Pre-Salt
MODEC FPSOs Boost Oil and Gas Production, According to A...
29/05/25
Celebration
ANP’s BDEP Turns 25
29/05/25
Bahia Oil & Gas Energy 2025
Bahia Oil and Gas 2025 opens with strategic discussions ...
29/05/25
Sergipe Oil & Gas 2025
June 3rd Marks the Launch of Sergipe Oil & Gas 2025
29/05/25
Bahia Oil & Gas Energy 2025
Tiger Rentank marks its presence on the first day of Bah...
29/05/25
Partnership
ANP partners with the Navy to begin work on the extensio...
27/05/25
Bahia Oil & Gas Energy 2025
Authorities confirm participation in Brazil's second lar...
27/05/25
Pre-Salt
Libra Consortium announces first oil from Mero-4 FPSO in...
27/05/25
Permanent Offer
5th Cycle of the Permanent Concession Offer: Bidding Seq...
27/05/25
OTC Houston 2025
Brazilian Companies Generate US$316 Million in Deals Dur...
22/05/25
Bahia Oil & Gas Energy 2025
The Largest Oil and Gas Event in Northern and Northeaste...
22/05/25
Pre-Salt
ANP Authorizes Start of Operations for Platform in the M...
22/05/25
ANP
Amounts related to March production from concession and ...
22/05/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.